ML18177A190

From kanterella
Jump to navigation Jump to search

Comment (22) of Michael Hall on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4
ML18177A190
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/21/2018
From: Hall M
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
83FR23726 00022, NRC-2018-0101
Download: ML18177A190 (2)


Text

PUBLIC SUBMISSION Docket: NRC-2018-0101 Turkey Point Nuclear Plant Units 3 and 4 Comment On: NRC-2018-0101-0001 Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 Document:

NRC-2018-0101:-DRAFT-0022 Comment on FR Doc# 2018-10806 Name: Michael Hall MD Address: 1680 Meridian Ave Suite 601 Miami Beach, FL, 33139 Email: mjhallmd@me.com June 21, 2018 Submitter Information General Comment As of: 6/22/18 2:08 PM Received:

June 21, 2018 Status: Pending_Post Tracking No. lk2-93uo-8hk4 Comments Due: June 21, 2018 Submission Type: Web SUNS! Review Complete Template=

ADM-013 E-RIDS=ADM-03 ADD= Yvonne Edmonds, Eric Oesterie, LaShawnna Lewis, Benjamin Beasley COMMENT (22) PUBLICATION DATE: 5/22/2018 CITATION#

83 FR 23726 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION, PETITION TO INTERVENE ON RENEWED FACILITY OPERATING LICENSE NOS. DPR-31, DPR-41 DOCKET ID NRC-2018-0074 Turkey Point Nuclear Power Plant, Unit 3 and Unit 4 PROPOSED PETITION TO INTERVENE UNDER 10 C.F.R. 103 I. Introduction of Petitioner MICHAEL J HALL, MD, MSC, PA, DABFM 1680 MERIDIAN AVE., SUITE 601, MIAMI BEACH, FLORIDA 33139 305 672 4733 michael@hallongevity.com II. Nature of the Petitioner right under U.S. Nuclear Regulatory Commission (NRC): US Citizen residing in Miami USA, Florida DOH licensed physician III. Nature of the Petitioner interest under U.S. Nuclear Regulatory Commission (NRC): Home owner, Business owner residing in Miami USA, physician and family and community health activist, FAA AME, FAA licensed private pilot with aircraft and hanger at Miami Executive Airport PETITIONERS CONCERNS IV. 1) Take an immediate enforcement action in the form of an order revoking the operating license for the Turkey Point Nuclear Power Plant (TPNPP) Unit 3, and Unit 4 (Docket No. DOCKET ID NRC-2018-0074 .License No. NPF-XX), or impose maximum fines for each violation for each day the plant has been in violation of current Miami Dade County and FEMA sea level rise and storm 'serge protection regulations.

Please refer to The Fukushima Daiichi nuclear disaster energy accident at the Fukushima Daiichi Nuclear Power Plant in kuma, Fukushima Prefecture due to catastrophic storm surge.

  • 2) Participate in open and public proceedings with the petitioners; the licensee, Florida Power & Light; and other external stakeholders in the vicinity of the TPNPP during lease extension deliberations on the petition.
3) Resolve all violations of illegal tritium (H3 isotope) release into the Atlantic Ocean, Everglades and the Biscayne aquifer of federal regulations before accepting a license renewal application from Florida Power & Light for the TPNPP. 4) Any existing or new relicense application must include and integrate current cooling canal system based on the fact the TPNPP cannot operate within authorized standard operating temperature without the cooling canals. Thank you for your time and commitment to the future health of South Florida. Sincerely, Michael J Hall, MD, MSc, PA, DABFM