ML17187A035
ML17187A035 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 08/07/2017 |
From: | Stuchell S NRC/NRR/DLR/RPGB |
To: | Maguire W Entergy Operations |
Emmanuel Sayoc, NRR/DLR, 415-1924 | |
References | |
CAC MF9747, CAC MF9778 | |
Download: ML17187A035 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 Entergy Operations, Inc.
5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING AND PROPOSED REVIEW SCHEDULE REGARDING THE APPLICATION FROM ENTERGY OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR RIVER BEND STATION, UNIT 1 (CAC NO. MF9747 AND MF9778)
Dear Mr. Maguire:
By letter dated May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC or the staff) received the Entergy Operations, Inc. (the applicant) application for renewal of Operating License NPF-47 for River Bend Station, Unit 1(RBS) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17153A282). Notice of receipt of this application was published in the Federal Register on June 28, 2017 (82 FR 29344). The application was supplemented by the applicant by letter dated August 1, 2017 (ADAMS Accession No. ML17213A064). The purpose of this letter is to provide the results of the staff's acceptance review of the license renewal application for River Bend Station. The acceptance review determines whether the application contains sufficient information to allow the staff to proceed with the safety and environmental reviews.
The staff reviewed your application following the guidance in NUREG-1800, Revision 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, and NUREG-1555, Supplement 1, Revision 1 Standard Review Plans for Environmental Reviews for Nuclear Power Plants. As a result, the staff determined that the application as supplemented, is sufficient and acceptable for docketing in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Sections 2.101, 51.45, 51.53(c), 54.19, 54.21, 54.22, and 54.23. However, the staffs determination does not preclude requests for additional information (RAIs) as the review proceeds.
This letter also forwards the staffs projected safety and environmental review schedule for the RBS application (Enclosure). The NRC staff will follow established review procedures and the enclosed schedule to complete the reviews required by 10 CFR Parts 51 and 54. This schedule has been established in accordance with an 18-month review plan, which does not include time to conduct a hearing, should a hearing be requested and granted. Milestones for hearing activities are not included in the enclosed schedule because these dates, if needed, would be established by the Commission or the Atomic Safety and Licensing Board. The cost estimate for the entire review is projected to be approximately $4,100,000. That is assuming a review
W.F Maguire that conforms generally to the enclosed schedule and without any significant review complications such as hearings or significant technical issues.
We would like to emphasize that the staffs review of your LRA will be very detailed and thorough. The staff will make every effort to meet the scheduled milestones; thus, your responses to the staff's Request for Additional Information (RAIs), if needed, must be complete and provided in a timely manner. We request that you inform the NRC staff as early as possible should potential delays arise in your support of the schedule.
If you have any questions on this matter, please contact Mr. Emmanuel Sayoc, Project Manager for the review of the River Bend Station license renewal application, by telephone at 301-415-4084 or via e-mail at Emmanuel.Sayoc@nrc.gov. If you have any questions on the schedule related to the environmental review, please contact Ms. Elaine Keegan, Senior Project Manager, by telephone at 301-415-8517 or via e-mail at Elaine.Keegan@nrc.gov.
Sincerely,
/RA/
Sheldon Stuchell, Chief Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
As stated cc w/encls.: Listserv
RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone Scheduled Actual Receive license renewal application (LRA) 5/31/2017 5/31/2017 Publish Federal Register Notice (FRN) - LRA availability 6/20/2017 6/20/2017 Publish FRN - acceptance/rejection and opportunity for hearing 8/2017 Public Meeting - License Renewal Overview and Environmental Scoping 9/2017 meeting Environmental scoping period ends 9/2017 Deadline for filing hearing requests and petitions for intervention 10/2017 Issue draft supplemental environmental impact statement (SEIS) 4/2018 Public Meeting - draft SEIS meeting 5/2018 End of draft SEIS comment period 6/2018 Issue safety evaluation report (SER) with open items 7/09/2018 Advisory Committee on Reactor Safeguards (ACRS) Subcommittee meeting 8/2018 Issue final SER 11/2018 Issue final SEIS 11/2018 ACRS full committee meeting 12/2018 U.S. Environmental Protection Agency FRN Published - availability of final 12/2018 SEIS Decision - Director, NRR 2/2019 Enclosure
ML17177A058 (Package) ML17187A035 (Letter) ML17173A133 (FRN)
OFFICE PM:RPGB:DLR LA:RPGB:DLR PM:RPGB:DLR NAME ESayoc YEdmonds EKeegan DATE 8/1/2017 8/3/2017 8/2/2017 OFFICE BC:RERB:DLR BC: RPGB:DLR NAME BBeasley SStuchell DATE 8/4/2017 8/7/2017