Ro:On 800506,during Refueling Operations,After Lowering of Reactor Internal Instrumentation Package,Incore Instrumentation Package for Thimble Location D-7 Found Bent Outward.Caused by No Provision for Thimble Passage to Core
ML13331B371
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/07/1980
From: Curran J
SOUTHERN CALIFORNIA EDISON CO.
To:
References
NUDOCS 8005160316
Download: ML13331B371 (2)


Text

REGULATORY *ORMATION DISTRIBUTION SYSW (RIDS)

ACCESSION NBR:8005160316 DOC,DATE; 80/05/07 NOTARIZED: NO DOCKET #

FACIL:50-ZO6 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 AUTH.NAME AUTHOR AFFILIATION CURRANJ.M,.

Southern California Edison Co.

RECIPNAME RECIPIENT AFFILIATION

SUBJECT:

RO:on 800506pduring refueling operations,after lowering of reactor internal instrumentation packagerincore instrumentation package for thimble location D-7 found bent outward.Caused by no provision for thimble passage to Core.

DISTRIBUTION CODE: M007S COPIES RECEIVED:LTR J'ENCL SIZE TITLE: LER (Backfit)

N 0 TE S :

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LiTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: 014 1

02 NRC POR 1

04 I&E 2

AEOD 1

BERLINGERC.

1 HANAUERS.

1 MPA 1

EXTERNAL: 03 LPDR 1

NSIC 1

MAY 2 0R U9 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~QENCL, -r

80 o

6 31 5.l (oi -

9outhern Ca/forn/a Ed/son Comrrpany ii tt Di+'Vitil P414@t.PAft RE1IEFRATS1 i

TATIO4 Hoy 7, 1980 U.S. Ruclear Reglulaitory CommtiSsion Region V Suite 20?

Walnut Creek Pl1az 1990 North California Blvd.

Walnut Crook, California 94596 Attention; Mr. R, H-. tngelken, Olrector Gentl emen:

DQCKET No, 50-206 SAN ONDFRE - UNIT 1 This letter describes a reportable occtirrence a defined in Section 6.9,2.a.(3) of Appendix A to the Provisional Operating License DPR-13 involving damage to on inore instrumentation thimble during refueling ooe.rations.

On May 6, 1980 the reactor internal instrumentotion pai Ce well$

lowered into place fol.lowinrg the completioi of the fuel okeevmt "huffle, A visual inspection of the package after lowering revealed that the incore instrumentation for thimble location D-7 was bent outward completely clear of the internals package.

During the current refuAeling-outage a new.Secondlary source ssebly was inserted in core location D-7.

Secoariary vour,'e asemblies do not have provision for passage of incore instrumentation th1mbles into the core, Consequently, thimble 0-7 was bent outward-when it was iosefrted Into the secondary source asembly.

A visual exarndation of the secondary source assembly, flow mixers and fuel. assmblies revealed no d41age.

A complete report on this matter together with a Licensee Evert Report will be forwarded.within 14 days, Si4neerel1y,.

Cra Plant Manager WSF:db,