Southern California Edison Company P. 0. BOX 800 2244 WALNUTGROVEAVENUE ROSEMEAD. CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, August 12, 1982 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:

D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 NUREG-0737, Item II.B.3 - Post Accident Sampling Capability San Onofre Nuclear Generating Station Unit 1

References:

1. Letter, D. M. Crutchfield, NRC, to R. Dietch, SCE, NUREG-0737, Item II.B.3, Post Accident Sampling System, June 30, 1982
2. Letter, K. P. Baskin, SCE, to D. M. Crutchfield, NRC, NUREG-0737, Item II.B.3, Post Accident Sampling Capability, April 15, 1982 Reference 1 informed us of your plans to perform a post implementation review of the subject requirement. We were also provided with an attachment which consisted of a clarification of the NUREG-0737 criteria for the subject requirement.

We were requested to provide a schedule for our response within 20 days of receipt of the letter.

Subsequent to the receipt of Reference 1, we were informed by telephone discussions, with members of your staff that our response was not required pending completion of an NRC internal review of the attachment to Reference 1. By telephone discussions with members of your staff, on August 9, 1982, we were informed that a response is now required. The purpose of this correspondence is to provide the requested schedule and combine that effort with a previous commitment made in Reference 2.

Reference 2 informed you of our plans to install in-line chloride and oxygen monitors with a diluted grab sample backup. We anticipated being able to provide more detailed design information by August 1, 1982.

Based on our review of the material presented in Attachment 1 to Reference 1, it is felt that this information should be included in our response to Reference 1.

8208160101 820812 PDR ADOCK 05000206 P

PDR

Mr. D.

August 12, 1982 Our response to Reference 1 will require the review and submittal of design information in order to provide our response to each criterion and the clarification presented in Attachment 1 to Reference 1. It is currently anticipated that this information can be provided to you by November 1, 1982.