Other: 05000206/LER-1981-013, Forwards LER 81-013/99X-0.Detailed Event Analysis Submitted, 05000206/LER-1981-013-99, /99X-0:on 810618,power Operated Relief Valve Controller Opened Twice During Normal Pressure Transient Following Reactor Trip.Caused by Setting Time Constant to Off to Satisfy NUREG-0737,Item II.K.3.9, L-81-029, Forwards Proposed Licensing Exam Schedule for 1981-82 for Reactor & Senior Operator Candidates,Per 810807 Request, L-82-002, Informs That Necessary Procedures Per NUREG-0737,Item I.A.1.3 Re Use of Overtime Required by Generic Ltr 82-12 Will Be Implemented by 821001.Tech Spec Will Not Be Submitted for Review Pending Receipt of Model Tech Specs, ML13308A671, ML13308B064, ML13308B821, ML13308B925, ML13310A775, ML13310A777, ML13310A778, ML13310A826, ML13310A828, ML13310A923, ML13310A926, ML13310B078, ML13310B081, ML13310B120, ML13310B280, ML13310B546, ML13310B619, ML13311B030, ML13316B714, ML13317A133, ML13317A134, ML13317A166, ML13317A190, ML13317A263, ML13317A267, ML13317A289, ML13317A367, ML13317A369, ML13317A377, ML13317A391, ML13317A427, ML13317A450, ML13317A454, ML13317A468, ML13317A478, ML13317A479, ML13317A484, ML13317A488, ML13317A490, ML13317A507, ML13317A512, ML13317A519, ML13317A553, ML13317A567, ML13317A581, ML13317A616... further results
|
MONTHYEARML13333A4221979-10-22022 October 1979 Forwards Responses to NRC post-TMI Requirements Re Design & Analysis,Operations,Rcs High Point Vents,Emergency Preparedness & Instrumentation to Monitor Containment Conditions Project stage: Other ML13303A7381979-10-30030 October 1979 Summary of 790927 Meeting W/Utils in San Clemente,Ca Re Emergency Plan Review Project stage: Request ML13322A6191979-11-15015 November 1979 Summary of 791108 Telcon W/Util Re Unacceptable Schedule for Implementing Lessons Learned Task Force Items Project stage: Other ML13333A4571979-12-14014 December 1979 Forwards Revisions to Util 790913 Commitments Re Compliance w/short-term TMI Lessons Learned Task Force Requirements Per NUREG-0578 Project stage: Other IR 05000206/19790161980-01-0404 January 1980 IE Insp Rept 50-206/79-16 on 791101-02 & 26.No Noncompliance Noted.Major Areas Inspected:Scope & Methods of Field Insp for IE Bulletin 79-14,repair of Shorted Electrical Buswork & Licensee Design Change Proposal Project stage: Request ML13311B0301980-01-21021 January 1980 Discusses Response to NRC 800102 Order to Show Cause Re Implementation of NUREG-0578 Category a Requirements.Will Continue Operation Until 800315.Shutdown on 800131 Would Severely Impact Power Reliability in Pacific Northwest Project stage: Other ML13333A4781980-01-23023 January 1980 Advises That Responses to NRC Requesting Info Re Small Break LOCA Guidelines Will Be Submitted by 800228. Bulletin Response Will Be Sent by 800228 Project stage: Other ML13333A4811980-01-24024 January 1980 Forwards Corrected Page 3 of App 10 to Enclosure a of Re Power Reliability Info.Omitted Info Sent to R Weiner of DOE on 800118 Project stage: Other ML13333A4831980-01-29029 January 1980 Confirms 800124 & 25 Telcons Re Facility 800126 Shutdown for Implementation of Lessons Learned Task Force Category a short-term Requirements Re Reopening of Containment Isolation Valves Project stage: Other ML13308B0641980-01-30030 January 1980 Concludes That Inadequate Justification Exists to Extend Util 800131 Deadline to 800315 for Response to 800102 Order to Show Cause Why All Category a Lessons Learned Requirements Should Not Be Implemented Project stage: Other ML19290E8091980-02-0101 February 1980 Denies Request for Shutdown Extension Until 800315 to Complete Category a Requirements W/Available Equipment. Reopening of Containment Isolation Valves Until Further Mods Completed Acceptable Project stage: Other ML13333A4981980-02-0808 February 1980 Submits Addl Info Re Commitment Schedule for short-term Lessons Learned Task Force Requirements.Circuitry to Close Auxiliary Feedwater Motor Operated Discharge Valve Will Be Installed During Apr 1980 Refueling Outage Project stage: Other ML13333A5031980-02-13013 February 1980 Forwards Justification for RCS Subcooling Setpoint,In Response to NRC 791227 Request.Addl Info Will Be Forwarded in Response to IE Bulletin 79-27 by 800228 Project stage: Other ML13316B7141980-03-0707 March 1980 Advises NRC of Delay in Responding to Item 4 of as Part of Response to IE Bulletin 79-27.Submittal Rescheduled from 800228 to 800701 Project stage: Other ML13330A0251980-03-25025 March 1980 Forwards Addl Info for Implementation of TMI short-term Lessons Learned Task Force Requirements.Describes Mods to Backup Nitrogen Pneumatic Supply & Valve Position Indication.Drawing Available in Central Files Only Project stage: Other ML13330A0271980-03-28028 March 1980 Responds to NRC 800117 Request for Review of Draft Evaluation of SEP Topic XV-20, Radiological Consequences of Fuel Damaging Accidents,(Inside & Outside Containment). Review Confirms Facts as Correct Project stage: Request ML13330A0321980-04-11011 April 1980 Confirms 800410 Telcons W/Regulatory Personnel Re Implementation of Several Category a TMI Lessons Learned Task Force Requirements Described in Project stage: Other IR 05000206/19800041980-04-11011 April 1980 IE Insp Rept 50-206/80-04 on 800128-0229.Noncompliance Noted:Failure to Rept Reactor Protection Sys Setpoints Less Conservative than Those Established by Tech Specs & Use of Nonstandard Fitting Project stage: Request ML13331B3711980-05-0707 May 1980 Ro:On 800506,during Refueling Operations,After Lowering of Reactor Internal Instrumentation Package,Incore Instrumentation Package for Thimble Location D-7 Found Bent Outward.Caused by No Provision for Thimble Passage to Core Project stage: Request ML13330A0521980-05-22022 May 1980 Discusses Open Items Re Implementation of Category a Lessons Learned Task Force Requirements Per NRC 800502 Request.Open Items Involve Instrumentation for Inadequate Core Cooling, post-accident Sampling & Reactor Cooling Sys Venting Project stage: Other ML13330A0621980-06-13013 June 1980 Discusses Completed Review of NRC Forwarding Five Addl Items Resulting from post-TMI Reviews.Forwards Commitments to Meet Implementation Requirements for Items 1-5 Project stage: Other ML13319A2131980-07-0909 July 1980 Forwards Post-Accident Sampling Sys,Capabilities & Description, & Drawings,In Response to Open Item Identified in NRC Re Implementation of TMI Lessons Learned Requirements.Drawings Available in Central Files Only Project stage: Other IR 05000206/19800201980-07-0909 July 1980 IE Insp Rept 50-206/80-20 on 800616-19.No Noncompliance Noted.Major Areas Inspected:Major Maint,Major Surveillance, IE Bulletin & Circular Followup & Independent Insp Effort Project stage: Request ML13322A7711980-07-0909 July 1980 Post-Accident Sampling Sys,Capabilities & Description Project stage: Other ML13302A4691980-09-12012 September 1980 Forwards Amend 20 to Fsar.Amend Contains Responses to NUREG- 0660 & NUREG-0694, TMI-Related Requirements for New Ols Project stage: Request ML13322A9461980-09-12012 September 1980 Notifies That Actions Required in NRC Re License Amend Application Concerning Implementation of TMI Lessons Learned Requirements Cannot Be Accomplished by 800912. License Amend Application Will Be Submitted by 810116 Project stage: Other ML13330A1321980-10-0909 October 1980 Notifies That Date for Submittal of Info Re Design Details for Reactor Coolant Vents & Addl Info for Main Steam Line Piping Integrity Evaluation Will Be Submitted 801101 & 1201,respectively Project stage: Other ML13330A1351980-10-15015 October 1980 Provides Plans,Schedules & Commitments to Meet Interim Criteria for Shift Staffing & Administrative Controls,In Response to NRC 800731 Request.Full Compliance W/Criteria Will Be Achieved No Later than 820701 Project stage: Other ML13316A5161980-10-31031 October 1980 Environ Qualification of Electrical Equipment Project stage: Request ML13330A1581980-12-23023 December 1980 Advises That Response to NRC Requesting Confirmation for Implementation Dates of TMI-related Items Will Be Submitted by 810105 Project stage: Other ML13308B8211980-12-30030 December 1980 Submits Addl Info Re Description of Shift Technical Advisor Training Program & Plans for Requalification Training Per 791031 Request Project stage: Other ML13330A1661981-01-0707 January 1981 Notifies That License Amend Application to Incorporate Applicable Tech Specs for Implementing TMI-2 Lessons Learned Category a Items Will Be Submitted by 810401 Project stage: Request ML13308A6711981-01-13013 January 1981 Advises That Licensee Inadvertently Omitted Info from Re Plans for Implementation of Action Item II.K.3.25 in NUREG-0737 Re Effect of Loss of Ac Power on Pump Seals. Evaluation Will Be Submitted by 820101 Project stage: Other ML13330A1911981-01-14014 January 1981 Informs That Radiochemical & Chemical Analysis Mods Promised in Util No Longer Necessary.Due to Other TMI Recommendations,Samples Can Be Analyzed Outside Lab.Cart Mounted Iodine Sampler W/Single Channel Analyzer to Be Used Project stage: Other ML14135A0051981-01-23023 January 1981 High Radiation Sampling Station General Piping Arrangement Plan Project stage: Other ML13330A1931981-02-0202 February 1981 Forwards Application for Amend 96 of License DPR-13 Project stage: Request IR 05000206/19810041981-02-25025 February 1981 IE Insp Rept 50-206/81-04 on 801229-810130.No Noncompliance Noted.Major Areas Inspected:Followup on Systematic Appraisal of Licensee Performance & Allegation by Contractor Employee Project stage: Request ML13330A2411981-03-0606 March 1981 Responds to IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Sys Automatic Initiation Will Occur on Low Steam Generator Level W/Setpoint at 5% of Narrow Range Instrument Project stage: Other ML13330A2661981-03-17017 March 1981 Forwards Listing Containing Brief Description of Design Changes Completed During 1980 Per 10CFR50.59b & Rept on Challenges to Relief & Safety Valves Per NUREG-0578 Project stage: Other ML13330A2671981-03-18018 March 1981 Advises That post-accident Sampling Sys,Described in Licensee ,Will Not Include Capability to Perform Chloride Analysis,Per NUREG-0737 & NUREG-0578.Chloride Analyses Using Dilute Samples Are Inaccurate Project stage: Other ML13330A2911981-04-13013 April 1981 Responds to NRC 801031 Request for Clarification of NUREG-0737 Requirements & Confirmation of Implementation Date.Rept by NUS Corp, Control Room Habitability Evaluation San Onofre Generating Station,Unit 1 Encl Project stage: Request ML13302B0341981-04-13013 April 1981 Summary of 810310 Meeting W/Utils in Bethesda,Md Re Explosion Hazards.Attendance List & Applicant Handouts Encl Project stage: Request ML13331A0741981-04-17017 April 1981 Requests That NRC Finish Review of Util Compliance W/Ie Bulletin 79-06C, Nuclear Incident at TMI - Suppl. Review Completion Needed for Util to Complete Design Change to Assure Automatic Tripping of Reactor Coolant Pumps Project stage: Other ML13330A2991981-04-20020 April 1981 Forwards Response to NUREG-0737,Item II.K.3.17 Re ECCS Equipment Outages.Also Forwards Analysis of Probability of Toxic Gas Hazard for San Onofre Nuclear Generating Station as Result of Truck Accidents Near Plant Project stage: Other ML13317A6101981-05-0707 May 1981 Forwards Addl Info Re SEP Topic XV-16, Radiological Consequences of Failure of Small Lines Carrying Primary Coolant Outside Containment, Per 801215 & 810319 Requests Project stage: Request ML13317A6161981-05-12012 May 1981 Advises That TMI Action Plan Item II.K.3.9 Was Not Completed by 810101.Facility Has Been Shut Down Since Apr 1980.Item Will Be Completed Prior to Restart.Also Lists Completion Schedules for Items II.D.3,II.E.4.2.,II.G.1 & III.D.3.3 Project stage: Other ML13317A6271981-06-0808 June 1981 Submits Results of Evaluation of Containment post-accident Pressure Reanalysis on Operational Limits,In Response to TMI Action Plan Item II.E.4.2(5).Peak post-accident Pressure & Temp in 770119 Analysis Is Still Applicable Project stage: Other ML20196A6141981-06-15015 June 1981 IE Review & Evaluation of Licensee Implementation of TMI Action Plan Requirement 1.C.5, `Procedures for Feedback of Operating Experience to Plant Staff Project stage: Other ML20196A6061981-06-15015 June 1981 IE Review & Evaluation of Licensee Conformance W/Tmi Action Plan Requirements 1.A.1.3, `Shift Manning Part 1,Limit Overtime Project stage: Other ML13317A6371981-06-17017 June 1981 Advises That Effluent Monitoring Sys,Per NUREG-0737,Item II.F.1 Will Not Be Completed Prior to Startup,As Remote Readout Gm Detector Has Been Removed.Interim Requirements of NUREG-0578 Will Be Met Per Project stage: Other 1980-04-11
[Table View] |
Text
Southern California Edison Company P.
- 0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING March 2, 1984 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Reactor Coolant Gas Vent System San Onofre Nuclear Generating Station, Unit 1
References:
- 1) Letter, J. G. Haynes, SCE, to 3. B. Martin, NRC, Region V, Informational Report, Licensee Event Report No.83-006, December 12, 1983
- 2) Letter from R. W. Krieger (SCE) to D. M. Crutchfield (NRC),
NUREG-0737, Item II.B.1 - Reactor Coolant System Vents, September 1, 1983 As discussed in Reference 1, the Reactor Coolant System (RCS) vent system at San Onofre Unit 1 was used to purge nitrogen which had accumulated in the reactor vessel head.
The purpose of this letter is to provide additional details for your information.
On November 18, 1983, San Onofre Unit 1 was being maintained in cold shutdown (MODE 5) with the RCS depressurized, and one loop of the Residual Heat Removal (RHR) system in operation. In accordance with approved operating instructions, the charging system Volume Control Tank (VCT) was being maintained with a nitrogen blanket pressure of 45 psig and was aligned to provide flow to the RCS through flow control valve FCV-1112. With the Pressurizer level at 78% and a nitrogen blanket pressure of approximately 4 psig in the Pressurizer Relief Tank, it was concluded that Pressurizer level should be lowered to less than 50% as a precautionary measure since one of the two Power Operated Relief Valves (PORV) was taken out of service and, consistent with a pending Technical Specification change addressing such a condition, this would provide a greater margin of safety for an inadvertent RCS overpressure event.
8403060399 840302 PDR AOC.0500206 PDR t
- 0.
March 2, 1984 Pressurizer level was subsequently reduced to approximately 43% and over the next three days slowly increased to an indicated level of nearly 50%.
Pressurizer level was again reduced on November 21, 1983 while a search for suspected RCS in-leakage was conducted. After reducing pressurizer level on two additional occasions over the next five days, it was concluded on November 27, 1983 that no liquid in-leakage path existed. It was further concluded that a possible cause for slowly increasing pressurizer level, under existing system conditions, could be the ingress of gas to the RCS or gasses coming out of solution in the depressurized RCS and collecting in the reactor vessel head.
As indicated in the Reference (2) submittal, SCE considered that the restrictions on implementation of the installed RCS vent system noted in NUREG 0737 Item II.B.1 did not apply in the cold shutdown or refueling modes and as such the system would be used for fill and vent operations in these modes.
The system was therefore utilized in an attempt to determine if gas had indeed collected in the reactor vessel head and after confirming that this was the case, normal fill and vent procedures were utilized to restore RCS inventory to the expected conditions.
A total of 3974 gallons was added to the RCS during fill operations, indicating that a gas bubble accumulation of approximately 500 cubic feet existed in the 741 cubic foot volume of the reactor vessel above the flange.
Thus, just prior to venting, the lower level of the nitrogen bubble was calculated to be 28 inches above the top of the reactor vessel hot leg nozzle.
Analyses have indicated that the source of the gas was the nitrogen blanket being maintained at 45 psig in the VCT. Dissolved nitrogen gas in the VCT water at 45 psig apparently comes out of solution in the essentially depressurized reactor vessel and over a period of time will collect in the reactor vessel head displacing RCS water to the pressurizer.
As corrective action, the VCT nitrogen pressure was reduced to 35 psig and the RCS has been and will continue to be periodically vented using the RCS vent system while nitrogen pressure in the VCT is maintained above RCS pressure.
All operating shifts will be made aware of this occurrence and the manner in which it developed.
Operating Instruction SO1-4-6, "Charging and Letdown System", has been revised to address venting nitrogen accumulation in the reactor vessel head using the RCS vent system in Modes 5 or 6. Other high points in the system (i.e. steam generator tubes) will be vented or purged as necessary to minimize accumulation of nitrogen in the Reactor Coolant System.
As further corrective action, an alternate charging flowpath to the RCS via the pressurizer spray lines was utilized. This method of charging, to be used in Mode 5 only, was reviewed with the assistance of representatives of the Westinghouse Electric Corporation, and was determined to be a safe method of charging while reducing the nitrogen buildup in the RCS. Subsequent to implementing this charging flowpath, the rate at which nitrogen came out of solution in the RCS was reduced by a factor of ten.
D.
March 2, 1984 Use of the RCS vent system for fill and vent operations in Modes 5 and 6 does not constitute an unreviewed safety question pursuant to the criteria of 10 CFR 50.59. Accordingly, we revised the procedure for normal RCS fill and vent in MODE 5 to include the use of the RCS vent system. The operators were trained in the manipulation of the RCS vent system and we have concluded that its use under the conditions that existed in the RCS at the time (depressurized in Mode 5) was appropriate and entirely consistent with our position outlined in Reference (2).
Public health and safety were unaffected by the nitrogen accumulation and subsequent venting. The Residual Heat Removal System remained in operation throughout this period and RCS temperature remained below 125 degrees Fahrenheit. RCS specific activity has remained within Technical Specification limits and no high radiation alarms in the release path were received during venting operations.
If you have any questions regarding the above discussed incident, please let me know.