Requests Addl Time to Prepare Tech Spec Changes Re TMI Action Plan Item II.E.1.2, Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, Per NRC .Submittal Expected by 830311
ML13317A479
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/12/1983
From: Krieger R
SOUTHERN CALIFORNIA EDISON CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-2.E.1.2, TASK-TM TAC-44128, TAC-44652, NUDOCS 8301180365
Download: ML13317A479 (1)


Text

Southern California Edison Company P.O. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 January 12, 1983 Director, Office of Nuclear Reactor Regulation Attention:

D. M1.

Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555.

Gentlemen:

Subject:

Docket 50-206 Auxiliary Feedwater System Automatic Initiation and Flow Indication (TMI Action Plan Item II.E.1.2)

San Onofre Nuclear Generating Station Unit 1 By letter dated November 18, 1982, the NRC provided the results of the subject review for San Unofre Unit 1. A requirement resulting from this effort was the submittal of changes to the plant Technical Specification to include periodic testing of automatic logic and logic relays.

The submittal was requested within 60 days.

The purpose of this letter is to notify you that additional time is required to prepare the Technical Specification changes. We plan to include other changes in addition to those required by the November 18, 1982 letter to incorporate the ongoing seismic modifications to the auxiliary feedwater system. It is expected that a submittal can be provided by March 11, 1983.

If you have any questions or desire additional information, please contact me.

Very truly yours, R. W. Krieg Supervising Engineer San Onofre Unit 1 Licensing 8301180365 830112 PDR ADOCK 05000206 P