TAC:44478
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Questions Answers | |
| From | |
MONTHYEARML17341B6521981-11-30030 November 1981
[table view]Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples ML13317B0881982-04-15015 April 1982 Informs That Chloride Monitoring Capability Will Be Installed Per NUREG-0737,Item II.B.3,in Response to NRC Rejecting Util Decision to Eliminate Chloride Monitoring.Addl Design Info Will Be Submitted by 820801 ML13317A2671982-08-12012 August 1982 Advises That Response to NUREG-0737,Action Item II.B.3, Post-Accident Sampling, Will Be Provided by 821101 ML13317A4541982-12-0303 December 1982 Submits Info for post-implementation Review of NUREG-0737, Item II.B.3, Post-Accident Sampling Sys. W/Six Oversize Drawings.Aperture Cards Are Available in PDR ML13310B1261983-05-0202 May 1983 Rev 4 to Emergency Operations Facility & Checklist/Log Technical Group ML13310B1231983-12-27027 December 1983 Forwards Info Re NUREG-0737,Item II.B.3, Post-Accident Sampling Capability, in Response to NRC 830901 Request ML13310B3881984-05-0101 May 1984 Reschedules Completion of post-accident Sampling Sys to Next Refueling Outage,Contrary to 840314 Confirmatory Order Requiring Implementation During Current Refueling Outage. Approval of Delay Requested ML13310B5361984-05-21021 May 1984 Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling ML13310B5341984-06-28028 June 1984 Forwards Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling, Per Request Re Interim post-accident Assessment capability.NUREG-0737,Item II.B.3 Mods Rescheduled for Next Refueling Outage ML13310B6311984-08-14014 August 1984 Forwards Addl Info Re Current Alternate post-accident Sampling Sys Methods,Completion Schedules for Procurement of Components,Const & Operator Training & Justification for Deferral to Cycle IX Refueling Outage ML13310B7011984-09-20020 September 1984 Application for Amend 124 to License DPR-13,consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Certificate of Svc Encl ML13310B6951984-09-20020 September 1984 Forwards Application for Amend 124 to License DPR-13, Consisting of Proposed Change 140 Re Installation of post-accident Sampling Sys by 860701 or Startup from Cycle 9 Refueling Outage.Fee Paid ML13322A0561984-10-0909 October 1984 Notification of 841009 Meeting W/Util in Bethesda,Md to Discuss Reload Submittal ML13316A7721984-11-23023 November 1984 Forwards Amend 85 to License DPR-13 & Safety Evaluation. Amend Adds License Condition 3.K Requiring Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage ML13316A7741984-11-23023 November 1984 Amend 85 to License DPR-13 Adding License Condition 3.K to Require Installation of post-accident Sampling Sys by 850701 or Startup from Cycle IX Refueling Outage ML13316A7781984-11-23023 November 1984 Safety Evaluation Supporting Amend 85 to License DPR-13 ML13324A6521985-06-18018 June 1985 Forwards Revised Schedule for post-accident Sampling Sys Completion,Per NUREG-0737,TMI Item II.B.3.Turnover to Station Personnel Will Be Completed Prior to Cycle IX Refueling Outage ML13324A6751985-07-17017 July 1985 Responds to NRC Request for Addl Info to Resolve Open Items Identified in Util 821203 Submittal in Response to NUREG-0737,Item II.B.3 Re post-accident Sampling Sys.Rev 8 to Procedure for Core Damage Assessment Encl ML13324A7021985-08-22022 August 1985 Informs of Planned Installation of post-accident Sampling Sys (PASS) by 860701 Per License Condition 3.K (NUREG-0737,Item II.B.3).On 850812,PASS Equipment Room Flooded W/Primary Plant Makeup Water ML13324A8671986-05-23023 May 1986 Requests Review of NRC Safety Evaluation,Transmitted by Ja Zwolinski ,Re Frequency of Chemistry Technician Retraining on post-accident Sampling Sys.Safety Evaluation Should Ref 12-month Frequency,Consistent w/831227 Request ML13323B1951986-10-0303 October 1986 Notice of Violation from Insp on 860728-0917 ML13330B1341986-11-12012 November 1986 Approves Replacement of 6-month Retraining Frequency for post-accident Sampling Sys Technicians,Previously Approved by NRC 851107 ltr,w/1-yr Retraining Frequency 1984-05-01 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:44478&oldid=5511893"