NRC Integrated Inspection Report 05000482/2018003
ML18311A384
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/07/2018
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
References
IR 2018003
Download: ML18311A384 (62)


Text

November 7, 2018

SUBJECT:

WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2018003

Dear Mr. Heflin:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. On October 31, 2018, the NRC inspectors discussed the results of this inspection with Mr. S. Smith, Vice President Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. Additionally, NRC inspectors documented one Severity Level IV violation with no associated finding. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Wolf Creek Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Wolf Creek Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects

Docket No. 50-482 License No. NPF-42

Enclosure:

Inspection Report 05000482/2018003 w/Attachments:

1. Documents Reviewed 2. Request for Information Public Radiation Safety Inspection

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2018003

Enterprise Identifier: I-2018-003-0012

Licensee:

Wolf Creek Nuclear Operating Corporation

Facility:

Wolf Creek Generating Station

Location:

Burlington, Kansas

Inspection Dates:

July 1 to September 30, 2018

Inspectors:

D. Dodson, Senior Resident Inspector

F. Thomas, Resident Inspector

S. Alferink, Reactor Inspector

H. Anagnostopoulos, NRC Region I, CHP, Senior Health Physicist

L. Carson II, Senior Health Physicist

P. Elkmann, Senior Emergency Preparedness Inspector

N. Greene, PhD, Senior Health Physicist

J. Kirkland, Senior Operations Engineer

J. Melfi, Project Engineer

J. ODonnell, CHP, Health Physicist

D. Proulx, Senior Project Engineer

Approved By:

Nicholas H. Taylor

Chief, Project Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Integrated Inspection at Wolf Creek Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

Failure to Correct Degraded Performance of a Safety-Related Tornado Damper Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Systems Green NCV 05000482/2018003-01 Closed H.14 - Human Performance,

Conservative Bias 71152 -

Problem Identification and Resolution The inspectors identified a Green non-cited violation of 10 CFR Part 50, Criterion XVI,

Corrective Action, for the licensees failure to promptly correct a condition adverse to quality associated with a safety-related tornado damper. Specifically, damper GTD0002 failed tests in 2012 and 2015, and following maintenance on the damper in 2017, again failed its next as-found test on February 8, 2018. As a result, this safety-related tornado dampers ability to close during a design basis tornado event was adversely impacted.

Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Cornerstone Significance Cross-cutting Aspect Inspection Procedure Not Applicable Severity Level IV NCV 05000482/2018003-02 Closed Not Applicable 71152 -

Problem Identification and Resolution The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.73(a)(2)(i)(B), because the licensee did not provide a written licensee event report (LER) to the NRC within 60 days. Specifically, the licensee did not provide a written LER to the NRC within 60 days of identifying a condition prohibited by the plants Technical Specifications associated with inoperability of control room emergency ventilation system train B for longer than its Technical Specification allowed outage time. As a result, the NRCs ability to regulate was impacted.

PLANT STATUS

Wolf Creek Generating Station began the inspection period operating at full power. On August 16, 2018, operators reduced power to approximately 59 percent following the loss of the Wolf Creek-Rosehill offsite 345 kV line as a result of heavy offsite storms and the 345-40 switchyard circuit breaker failing to reclose. The plant was restored to approximately full power on August 18, 2018, and the plant operated at or near full power for the rest of the period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/

reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection External Flooding

The inspectors evaluated readiness to cope with external flooding on July 12, August 8, and September 11, 2018.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Safety injection train B on July 17, 2018
(2) Charging pump train B on July 24, 2018
(3) Class 1E offsite electrical circuit alignment in preparation for realigning to an alternate supply line-up to Class 1E 4160 volt alternating current bus NB01 on August 21, 2018
(4) Motor driven auxiliary feedwater train A on August 29, 2018
(5) Emergency diesel generator train B on September 19, 2018

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Control building, elevation 2,016 feet, fire areas C-13, C-14, C-15, C-16, C-18, C-19, and C-35 (Class 1E air conditioning unit rooms, safety-related battery rooms, and switchgear rooms) on July 12, 2018
(2) Control building, elevation 2,032 feet, fire areas C-21, C-23, and C-24 (lower cable spreading room and cable chases) on July 12, 2018
(3) Auxiliary building, elevation 1,974 feet, fire areas A-1 and A-4 (emergency core cooling system train B) on July 26, 2018
(4) Control building, elevation 1,984 feet, fire area C-5 (access control) on September 11, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance on August 10 and September 7, 2018.

71111.06Flood Protection Measures Cables

The inspectors evaluated cable submergence protection in essential service water electrical manhole MHE2B on July 30, 2018.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated licensed operator requalification activities in the simulator that included multiple instrument and component malfunctions and a steam generator tube rupture scenario on August 27, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated power ascension activities after a reduction in power associated with the loss of the Rosehill 345 kV line on August 17, 2018.

Operator Requalification Program (1 Sample)

The inspectors evaluated the operator requalification program from June 4 to June 7, 2018.

71111.12Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Class 1E instrument alternating current power inverter NN11 unexpectedly transferring to its bypass transformer on May 21, 2018
(2) Chemical and volume control system reactor coolant system letdown to regenerative heat exchanger valve diaphragm leak and failure to open on April 29, 2018
(3) Containment cooler train A breaker tripped while shifting to fast speed on May 9, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Planned safety-related NK24 battery charger maintenance on July 9 and July 10, 2018
(2) Unplanned component cooling water train A essential service water weld leak on July 22 and July 23, 2018
(3) Risk assessment and mitigation associated with protection of containment spray train B on July 24, 2018
(4) Risk assessment associated with unplanned station blackout diesel generator switchgear PB005 non-functionality and planned emergency diesel generator train B maintenance on August 1, 2018
(5) Risk assessment associated with extended service water pump A maintenance, abnormal switchyard alignment, and numerous lifts in the spent fuel pool building during the week of August 20, 2018
(6) Risk assessment associated with protection of fuel building equipment during lift of cask handling crane trolley assembly from elevation 2,047 feet to crane trolley rail structure on August 27, 2018
(7) Risk assessment associated with planned switchyard manipulations and extended instrument air compressor train A out-of-service time due to an unexpected breaker trip while restoring from maintenance

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Essential service water system piping U-bolt support configuration on June 13, 2018
(2) Essential service water train A to component cooling water train A heat exchanger isolation valve EFHV0051 leakby on July 23, 2018
(3) Class 1E 125 Volt direct-current busses NK01, NK02, NK03, and NK04, and switchboards and components downstream of the NK buses on July 31, 2018
(4) Boric acid storage tank train B seismic support configuration on August 6, 2018
(5) Essential service water train B pin hole leakage on the return line of control room chiller unit SGK04B on August 8, 2018

71111.18Plant Modifications

The inspectors evaluated the Class 1E heating, ventilation, and air conditioning system recirculation system permanent modification.

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Component cooling water heat exchanger train A essential service water leak repair on July 24, 2018
(2) Component cooling water pumps A and C following planned breaker and pump maintenance on August 13, 2018
(3) Charging pump train A following planned maintenance on September 18, 2018

===71111.22Surveillance Testing The inspectors evaluated the following surveillance tests:

Routine===

(1) STS EN-005, Containment Spray Additive Tank Volume Verification, on July 18, 2018

In-service (2 Samples)

(1) STS EJ-100B, [Residual Heat Removal] System Inservice Pump B Test, on July 11, 2018
(2) STS BG-210, [Chemical and Volume Control System] Inservice Check Valve Test, on September 20, 2018

71114.02Alert and Notification System Testing

The inspector evaluated the maintenance and testing of the licensees alert and notification system on September 20, 2018.

71114.03Emergency Response Organization Staffing and Augmentation System

The inspector evaluated the readiness of the licensees Emergency Preparedness Organization on September 20, 2018.

71114.05Maintenance of Emergency Preparedness

The inspector evaluated the maintenance of the emergency preparedness program on September 18, 2018. The inspector observed emergency response organization training conducted on September 18 and September 19, 2018.

71114.06Drill Evaluation Emergency Planning Drill

The inspectors evaluated the emergency planning drill on August 28, 2018.

Drill/Training Evolution (1 Sample)

The inspectors evaluated simulator-based licensed operator qualification training on September 17,

RADIATION SAFETY

71124.05Radiation Monitoring Instrumentation Walk Downs and Observations

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

Calibration and Testing Program (1 Sample)

The inspectors evaluated the licensees calibration and testing program.

71124.06Radioactive Gaseous and Liquid Effluent Treatment Walk Downs and Observations

The inspectors evaluated the licensees radioactive gaseous and liquid effluent treatment systems during plant walkdowns.

Calibration and Testing Program (Process and Effluent Monitors) (1 Sample)

The inspectors evaluated the licensees gaseous and liquid effluent monitor instrument calibration and testing.

Sampling and Analyses (1 Sample)

The inspectors evaluated radioactive effluent sampling and analysis activities.

Instrumentation and Equipment (1 Sample)

The inspectors evaluated radioactive effluent instrumentation and equipment.

Dose Calculations (1 Sample)

The inspectors evaluated dose calculations.

71124.07Radiological Environmental Monitoring Program Site Inspection

The inspectors evaluated the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (1 Sample)

The inspectors evaluated the licensees groundwater monitoring program.

The inspectors identified an incomplete element of Wolf Creek Nuclear Operating Corporations implementation of the Ground Water Protection Initiative as described in NEI 07-07, Industry Ground Water Protection Initiative - Final Guidance Document, dated August 2007.

Specifically, the inspectors could not find evidence that Objective 1.2.2, Evaluate work practices that involve licensed material and for which there is a credible mechanism for the licensed material to reach ground water, had been performed as described in the initiatives acceptance criteria for that objective.

The inspectors found that:

  • The licensee hired a contractor to perform a site risk assessment in 2008. That risk assessment focused specifically on site systems, structures and components as described in objective 1.2.1. The assessment did not specifically look at work practices as required in the second objective 1.2.2.
  • Quick Hit Assessment QH-2013-0660 reviewed the sites compliance with NEI 07-07 using a comprehensive checklist of the documents requirements. The checklist combined objectives 1.2.1 and 1.2.2 together as one item. As a result, the previous failure to evaluate work practices (per objective 1.2.2) was not identified.
  • Quick Hit Assessment QH-2016-1249 again reviewed the sites compliance with NEI 07-07, but using team members from other utilities. This assessment identified that there was no documentation that lists the identified work practices that meet this criteria

[objective 1.2.2]. Condition Report 101560 was written.

  • The description provided in Condition Report 101560 adequately reflects the condition as identified in QH-2016-1249. The inspectors found, however, that the actions taken in response to the condition report focused only on updating the existing evaluation of systems, structures, and components (objective 1.2.1) and again did not address the missing evaluation of work practices as required in objective 1.2.2.

The incomplete implementation of NEI 07-07 was reviewed with licensee management on August 23, 2018. This was entered into the corrective action program by documenting the observations in Condition Reports 118440 and 126115.

71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage

The inspectors evaluated the licensees radioactive material storage.

Radioactive Waste System Walk-down (1 Sample)

The inspectors evaluated the licensees radioactive waste processing facility during plant walkdowns.

Waste Characterization and Classification (1 Sample)

The inspectors evaluated the licensees radioactive waste characterization and classification.

Shipment Preparations (1 Sample)

The inspectors evaluated the licensees radioactive material shipment preparation processes.

Shipment Records (1 Sample)

The inspectors evaluated the licensees non-excepted package shipment records.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS06: Emergency AC Power Systems (07/01/2017 - 06/30/2018)
(2) MS07: High Pressure Injection Systems (07/01/2017 - 06/30/2018)
(3) MS10: Cooling Water Support Systems (07/01/2017 - 06/30/2018)
(4) EP01: Drill/Exercise Performance Sample (10/1/2017 - 06/30/2018)
(5) EP02: Emergency Response Organization Drill Participation Sample (10/1/2017 - 06/30/2018)
(6) EP03: Alert And Notification System Reliability Sample (10/1/2017 - 06/30/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to an unplanned auxiliary feedwater train actuation on May 12,

INSPECTION RESULTS

Failure to Correct Degraded Performance of a Safety-Related Tornado Damper Cornerstone Severity Cross-cutting Aspect Inspection Procedure Mitigating Systems Green NCV 05000482/2018003-01 Closed H.14 - Human Performance, Conservative Bias

71152 - Problem

Identification and Resolution The inspectors identified a Green non-cited violation of 10 CFR Part 50, Criterion XVI, Corrective Action, for the licensees failure to promptly correct a condition adverse to quality associated with a safety-related tornado damper. Specifically, damper GTD0002 failed tests in 2012 and 2015, and following maintenance on the damper in 2017, again failed its next as-found test on February 8, 2018. As a result, this safety-related tornado dampers ability to close during a design basis tornado event was adversely impacted.

Description:

In December 2012 the licensee identified in Condition Report 61246 that during preventive maintenance and testing, the GTD0002 tornado damper exceeded its acceptance criteria for breakaway torque. Specifically, the as-found torque was 320 ft-lbs, which exceeded the acceptance criteria of 299 ft-lbs or less. The licensee implemented Work Order 12-355727-011, cycled the damper six times, and each time the damper break away torque was noted as between or equal to 280 to 290 ft-lbs. This failure was determined to be a result of lack of cycling leading to a non-uniform lubrication profile. No additional action was taken.

In January 2015, the licensee identified in Condition Report 90975 that during preventive maintenance and testing the GTD0002 damper was rubbing and exceeded its acceptance criteria for breakaway torque (as found break away torque was 380 ft-lbs as compared to the acceptance criteria of 299 ft-lbs or less). A contingency work order was implemented and actions were taken to reduce the rubbing that was identified. Rubbing was still noted following the corrective maintenance, but the as-left break away torque was found to be within acceptable ranges and the damper was described as cycling relatively smooth. The licensee performed a basic cause evaluation and determined that the probable cause was inadequate clearances between the damper blades and the associated ductwork during initial installation resulting in a rubbing or binding condition of the damper. A planned action included performing Work Order 15-397077-000.

On January 11, 2017, the licensee performed Work Order 15-397077-000 to adjust the ductwork at the GTD0002 damper. Bolting between the damper framework and the ductwork was loosened and the vertical duct face was mechanically adjusted. Work Order 15-397077-000 noted the as found condition of the two middle blades stating that they rub hard. Condition Report 110377 also noted that five of nine damper blades still exhibited rubbing as the ductwork relaxed. Work Order 15-397077-000 also noted that the damper passed its as-left break away torque test at 291 ft-lbs. Though, the work order pointed out, Damper blade still rubbing after adjustment. An email from maintenance personnel (attached to the work order) described the condition of the damper following maintenance.

The email stated,

I was able to cycle the damper much easier than before but when we put the to[r]que wrench on it we were getting it to move at [approximately] 330 [ft-lbs].

We tried several times and we were all eyeballing it but each time it seemed it would just barely start to creep at around 290 [ft-lbs] but nothing very noticeable until 320-330 [ft-lbs].

Engineering personnel were contacted and the condition was accepted based on Slight movement at 290 [ft-lbs] during three subsequent attempts.

On February 8, 2018, while performing planned testing and maintenance on normally open safety-related tornado damper GTD0002 in accordance with Work Order 17-428518-000, the first stroke breakaway torque failed to meet the acceptance criteria of less than or equal to 299 foot-lbs. Condition Report 119330 noted the damper did not break away until applied torque had reached 325 foot-lbs and the damper seemed to be binding up the first quarter of the rotation.

Section 9.4.3.2.2, Component Description, of the Updated Final Safety Analysis Report describes the function of the normally open GTD0002 damper. It states, Tornado dampers are employed where isolation from the effects of extreme wind or tornado conditions is required. These dampers close with the flow produced by the differential pressure associated with tornadoes or high winds. Otherwise, the safety-related damper must be open to allow flow for the emergency exhaust system to vent through the unit stack.

Section 9.4.3.1.1, Safety Design Bases, of Section 9.4.3, Auxiliary Building, of the Updated Final Safety Analysis Report describes the design basis for this damper:

The emergency exhaust system, and those portions of the auxiliary buildingand the auxiliary/fuel building normal exhaustwhich are required to provide isolation of the auxiliary building are safety-related and are required to function following a [design basis accident] and to achieve and maintain the plant in a postaccident safe shutdown conditionThe emergency exhaust system, and the auxiliary building isolation provisions are protected from the effects of natural phenomena, such as earthquakes, tornadoes, hurricanes, floods, and external missiles (GDC-2).

The inspectors noted that both trains of the safety-related emergency exhaust system could be prevented from performing their safety-related functions if the damper did not close as designed during a design basis tornado. Specifically, the negative pressure created by a tornado could result in the collapse of the unit vent exhaust plenum, which is the exhaust flowpath for the emergency exhaust system.

Corrective Actions: On February 8, 2018, Work Order 17-421482-000 was performed to remove a small amount of the GTD0002 damper blade material at the edge of the damper blades to eliminate rubbing. The licensee also created long-term action 18-0008 to provide a permanent resolution for the rubbing issues that have contributed to the numerous failures of the breakaway torque testing.

Corrective Action References: Condition Reports 119330 and 127690.

Performance Assessment:

Performance Deficiency: The failure to promptly correct a condition adverse to quality associated with safety-related tornado damper GTD0002 was a performance deficiency.

Screening: The performance deficiency is more than minor, and therefore a finding, because it is associated with the structure, system and component, and barrier performance attribute of the Barrier Integrity Cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Specifically, the auxiliary building boundary and the emergency exhaust systems ability to exhaust potentially contaminated air from the emergency core cooling system could be adversely impacted by the GTD0002 dampers inability to meet breakaway torque requirements.

Significance: The inspectors assessed the significance of the finding using Exhibit 3, Barrier Integrity Screening Questions, of Inspection Manual Chapter 0609, Appendix A, Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined this finding does not only represent a degradation of the radiological barrier function provided for the control room, or auxiliary building, or spent fuel pool, and the finding does not represent a degradation of the barrier function of the control room against smoke or a toxic atmosphere. Therefore, the inspectors determined the finding was of very low safety significance (Green).

Cross-cutting Aspect: The inspectors determined that the finding has a human performance cross-cutting aspect in the area of conservative bias in that individuals did not use decision making-practices that emphasize prudent choices over those that are simply allowable.

Specifically, individuals rationalized assumptions for the sake of completing a task when the rubbing condition was accepted with slight movement of the damper at the acceptance criteria, rather than pursuing resolution of the known degraded condition of the damper blades. As a result, when the damper was next tested, it failed at the same unsatisfactory torque value as that observed in January 2017.

Enforcement:

Violation: Title 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, are promptly corrected.

Contrary to the above, until February 8, 2018, measures were not established to assure that conditions adverse to quality, such as failures, were promptly corrected. Specifically, actions taken to correct the degraded condition of safety-related tornado damper GTD0002 were inadequate to ensure it could perform its safety function from January 2017 through February 2018. As a result, the damper failed testing again in 2018.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Cornerstone Severity Cross-cutting Aspect Inspection Procedure Not Applicable Severity Level IV NCV 05000482/2018003-02 Closed Not Applicable

71152 - Problem

Identification and Resolution The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.73(a)(2)(i)(B),because the licensee did not provide a written licensee event report (LER) to the NRC within 60 days. Specifically, the licensee did not provide a written LER to the NRC within 60 days of identifying a condition prohibited by the plants Technical Specifications associated with inoperability of control room emergency ventilation system train B for longer than its Technical Specification allowed outage time. As a result, the NRCs ability to regulate was impacted.

Description:

On March 5, 2018, the licensee performed Procedure STS PE-004, Aux Building and Control Room Pressure Test, Revision 16, and the B train control room emergency ventilation systems ability to pressurize the control room envelope and maintain pressure greater than or equal to 0.25 inches water gauge failed. Later tests on March 5, 2018, which maintained control of control building doors, had results that varied between 0.18 and 0.26 inches water gauge, with an average of 0.2258 inches water gauge.

Troubleshooting was performed and, on March 6, 2018, an interim configuration associated with Design Change Package 14269, SGK05 Tech Spec Addition and Compensatory Modifications, was found to be impacting readings. Specifically, between September 17, 2017, and January 17, 2018, four openings, approximately 2 foot by 2 foot, were cut in the floor/ceiling between the 2,032 foot and 2,016 foot elevations of the control building to support ongoing ductwork installation. On January 17, 2018, after penetrations for the modification were completed, compensatory measures consisting of steel plates covering the four floor openings were in place until ductwork installation began on February 19, 2018. Beginning on February 19, 2018, the penetrations remained open during ductwork and damper installation until March 6, 2018, when the ductwork and damper installation was completed.

Following numerous actions to restore margin to the ability to pressurize the control room envelope, surveillance testing was performed for the B and A trains of the control room emergency ventilation system on March 15, 2018, and the control room envelope was pressurized to 0.3448 and 0.3695 inches water gauge, respectively. Additional information on this issue is described in NCV 05000482/2018002-02, Failure to Maintain Adequate Pressurization of the Control Room Envelope, (ADAMS ML18226A175).

The licensees cause evaluation determined that the probable causes of the issue were inadequate identification of control building ventilation isolation boundaries in WCRE-35, Boundary Matrix, and control of conditions during STS PE-004. Relative to the interim configuration in which the ducting was found on March 6, 2018, the licensees cause evaluation stated,

When the ducting was fully installed and the control room pressure tested in the same configuration, an increase of 0.04 to 0.07 [inches water gauge] was noted initially. Enough to pass acceptance criteria and close to the pressures last noted during performance of STS PE-004 in 2016. The readings were taken immediately following the closure of the main control room door and while the total average over that period was 0.2641 [inches water gauge], the last 5 minutes of readings averaged 0.2935 [inches water gauge]. This would seem to indicate that the control room pressure was still stabilizing and that the pressure was similar to those found during past differential pressure tests.

When the surveillance was ran the following week it did not pass but conditions under which the surveillance were ran differed in both timing and alignment which may have contributed to the lower than expected pressure.

In addition to the licensees conclusions regarding the interim configurations impact on the control room emergency ventilation system, the licensees evaluation noted,

A number of factors were found to be consequential to control room pressure during the event under evaluation. Direct comparison between all the pressures found is complicated by the numerous varying factors between each of the tests. However, based on the test results the probable cause of the initial failure is related to the penetration between the 2032 and 2016 elevations of the Control Building.

Considering successful informational testing on March 6, 2018, after ductwork and dampers were installed, considering additional information provided in the licensees cause evaluation, and considering reportability subject matter expert input the inspectors determined that train B of the control room emergency ventilation system was inoperable between February 19, 2018, and March 16, 2018, when the system was returned to operable.

Corrective Actions: In response to the inspectors questions the licensee initiated Condition Report 127691.

Corrective Action References: Condition Report 127691.

Performance Assessment:

The inspectors determined this violation was associated with a minor performance deficiency.

Enforcement:

The Reactor Oversight Processs significance determination process does not specifically consider the regulatory process impact in its assessment of licensee performance.

Therefore, it is necessary to address this violation which impedes the NRCs ability to regulate using traditional enforcement to adequately deter non-compliance.

Severity: The inspectors determined that the failure to provide a written LER within 60 days was a performance deficiency that was reasonably within the licensees ability to foresee and correct, and should have been prevented. This violation involved not making a required report to the NRC and is considered to impact the regulatory process. Such violations are dispositioned using the traditional enforcement process instead of the Significance Determination Process. Using the Enforcement Policy, Section 6.9, Inaccurate and Incomplete Information or Failure to Make a Required Report, example (d)(9), which states, A licensee fails to make a report required by 10 CFR 50.72 or 10 CFR 50.73, the NRC determined this violation is more than minor and is categorized as a Severity Level IV violation (very low safety significance).

Violation: Title 10 CFR 50.73(a) requires, in part, that licensees submit an LER for any event of the type described in the paragraph within 60 days after the discovery of the event.

Title 10 CFR 50.73(a)(2)(i)(B) requires, in part, that any operation or condition which was prohibited by the plants Technical Specifications be reported in an LER.

Contrary to the above, on May 4, 2018, an operation or condition which was prohibited by the plants Technical Specifications was not reported in an LER. Specifically, Technical Specification 3.7.10, Control Room Emergency Ventilation System (CREVS), requires, in part, immediate initiation of action to implement mitigating actions when one or more control room emergency ventilation system trains is inoperable due to an inoperable control room envelope boundary or control building envelope boundary in MODES 1, 2, 3, or 4, or the unit must be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Neither immediate initiation of action to implement mitigating actions was implemented, nor the unit placed in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36, and the condition prohibited by the plants Technical Specifications was not later reported in an LER.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

On August 16, 2018, the inspector presented the licensed operator requalification inspection results to Ms. J. Yunk, Training Manager, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented for this inspection period.

On August 23, 2018, the inspectors presented the baseline radiation protection inspection results to Mr. T. Fugate, Director, Plant Support, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On September 21, 2018, the inspector presented the results of the onsite inspection of the emergency preparedness program to Mr. M. Boyce, Director, Engineering Projects, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

On October 31, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. S. Smith, Vice President, Engineering, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.01Adverse Weather Protection

Procedures

Number

Title

Revision

OFN SG-048

Flash Flood Warning

STS PE-049E

Train A Essential Service Water System in Vaults Pressure

Test

Drawings

Number

Title

Revision

10466-A-1330

Access Control Floor Plan, El. 1984-0

C-1C3902

Control Building Area 1 Concrete Neat Lines and

Reinforcing Wall Elevations Sheet 2

C-K201

E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan,

Sections and Schedules Sht. 1

C-K201

E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan,

Sections and Schedules Sht. 1

C-K202

E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan,

Sections and Schedules Sht. 2

C-K202

E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan,

Sections and Schedules Sht. 2

C-K208

E.S.

W.S. Yard Pipeline Valve House Plans, Sections, and

Details Sht. 1

C-K208

E.S.

W.S. Yard Pipeline Valve House Plans, Sections, and

Details Sht. 1

Condition Reports

21699

24381

24382

24383

24397

24409

24988

25177

25196

25197

26267

26345

Miscellaneous Documents

Number

Title

Revision

014592

Field Change Notice - Change Package Title: ESW Below

Ground Plant Tie-In Approval and Component Abandonment

Miscellaneous Documents

Number

Title

Revision

014592

Field Change Notice - Change Package Title: ESW Below

Ground Plant Tie-In Approval and Component Abandonment

10466-C107-1

Bechtel: Technical Specification for Purchase of Waterstops

and Expansion Joint Filler for the Standardized Nuclear Unit

Power Plant System (Snupps); Job No. 10466

APF 05-002-05

Engineering Disposition: ESW Below Ground Plant Tie-In

Approval and Component Abandonment - Package

  1. 014592

APF 05-002-05

Engineering Disposition: ESW Below Ground Plant Tie-In

Approval and Component Abandonment - Package

  1. 014592

APF 05-007-01

Safety Classification Analysis - Change Package #013503

71111.04Equipment Alignment

Procedures

Number

Title

Revision

AI 15C-006

Management Oversight Requirements for Infrequently

Performed and Potentially Degrading Evolutions

AP 21G-001

Control of Locked Component Status

AP 26C-004

Operability Determination and Functionality Assessment

CKL AL-120

Auxiliary Feedwater Normal Lineup

CKL BG-120

Chemical and Volume Control System Normal Valve Lineup 41

CKL BG-130

Chemical and Volume Control System Switch and Breaker

Lineup

31A

CKL EM-120

Safety Injection System Lineup Checklists

CKL KJ-121

Diesel Generator NE01 and NE02 Valve Checklist

40B

MGM MOOP-01

Relief Valve Bench Testing

STS IC 645A

Slave Relay Test K645 Train A Containment Spray

SYS NB-200

Transferring XNB01 Supply Between SL7 and #7

Transformer

SYS NP-201

Transferring NB01 Power Sources

Drawings

Number

Title

Revision

E-1001

Single Line Diagram Site Area Loads

E-11001

Main Single Line Diagram

E-11005

List of Loads Supplied by Emergency Diesel Generator

E-11010

DC Main Single Line Diagram

E-11010A

DC Main Single Line Diagram (PK03 and PK04 BUS)

E-12KJ01

Standby Generation Engine and Governor Control Logic

Diagram

E-12NE01

Standby Generation Excitation Control Logic Diagram

E-12NE02

Logic Diagram Standby Gen. System Protection

E-K1001

Single Line Diagram Essential Service Water System

KD-7496

One Line Diagram

KD-7496

One Line Diagram

KD-7750

Wolf Creek Substation General Plan

M-12AL01

Piping & Instrumentation Diagram Auxiliary Feedwater

System

M-12AP01

Piping & Instrumentation Diagram Condensate Storage and

Transfer System

M-12BG03

Piping and Instrumentation Diagram Chemical & Volume

Control System

M-12EJ01

Piping and Instrumentation Diagram Residual Heat

Removal System

M-12EM01

Piping & Instrumentation Diagram High Pressure Coolant

Injection System

M-12EM01

Piping & Instrumentation Diagram High Pressure Coolant

Injection System

M-12EM02

Piping & Instrumentation Diagram High Pressure Coolant

Injection System

M-12EM03

Piping & Instrumentation Diagram High Pressure Coolant

Injection System Test Line

M-12KJ04

Piping & Instrumentation Diagram, Standby Diesel

Generator B, Cooling Water System

M-12KJ05

Piping & Instrumentation Diagram, Standby Diesel

Generator B, Intake Exhaust, F.O. & Start Air Sys.

Drawings

Number

Title

Revision

M-12KJ06

Piping & Instrumentation Diagram, Standby Diesel

Generator B, Lube Oil System

M-724-00323

Crosby Valve & Gage Co. Drawing DS-C-60705, Titled -

Nozzle Type Relief Valve

W05

Condition Reports

25096

25097

25253

Miscellaneous Documents

Number

Title

Revision/Date

0303

Westar Energy, Inc. - Transmission Operating Directive

August 17,

2018

APF 21C-001-01 Wolf Creek Substation Work Authorization: 2018-026,

SY124 Cable PMT

August 20,

2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 2018-308

August 20 to

26, 2018

M-724-00811

Installation, Operation and Maintenance Instructions for

Anderson Greenwood Crosby Style Pressure Relief Valves

W01

71111.05AQFire Protection Annual/Quarterly

Procedures

Number

Title

Revision

AP 10-105

Fire Protection Training and Drills

AP 10-105

Fire Protection Training and Drills

AP 10-106

Fire Preplans

18A

AP 10-107

Fire Event Investigation and Reporting

OFN KC-016

Fire Response

Condition Reports

25027

25028

25752

26417

26418

26419

26517

26518

26527

26528

26529

26530

Work Orders

17-428938-000

Miscellaneous Documents

Number

Title

Revision/Date

APF 06-002-01

Emergency Action Levels

17B

APF 10-105-02

Fire Drill Scenario and Critique Report: Time - 0800

August 10,

2018

APF 10-105-02

Fire Drill Scenario and Critique Report: Time - 0800

September 7,

2018

APF 10-105-02

Fire Drill Scenario and Critique Report: Time - 1300

September 7,

2018

APF 10-105-04

Fire Brigade Meeting Agenda

September 7,

2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Day Shift

September 7,

2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Night Shift

September 7,

2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Night Shift

September 8,

2018

APF 30E-003-02 Training Attendance

September 10,

2018

E1F9905

Fire Hazard Analysis

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification

FL1224000

Fire Brigade Leader/Incident Commander

No. 18

Coffey County Emergency Management Office Contingency

Plan Implementing Procedure

OBSR 2018-

27

Observation Card: Fire Protection - Fire Brigade Drill

August 10,

2018

XX-X-004

Combustible Fire Loading For Each Room in the Various

Fire Areas at WCNOC

71111.06Flood Protection Measures

Drawings

Number

Title

Revision

C-K202

E.S.

W.S. Yard Pipelines and Electrical Duct Banks Plan,

Sections and Schedules Sht.-2

Drawings

Number

Title

Revision

C-K209

E.S.W.S. Electrical Manholes Plans Sections and Details

C-K210

ESWS Yard Pipelines and Elect. Duct Banks Sections and

Details

C-K212

E.S.W.S. Yard Pipelines and Elec. Duct Banks Plan and

Sections

C-K212

E.S.W.S. Yard Pipelines and Elec. Duct Banks Plan and

Sections

E-KR0231

Raceway Plot Plan Essential Service Water System Plan

and Sections

E-KR0231

Raceway Plot Plan Essential Service Water System Plan

and Sections

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number

Title

Revision

AI 21-016

Operator Time Critical Actions Validation

AI 30B-005

Conduct of Simulator Activities for Licensed Operator

Training

AI 30B-15

Licensed Operator Requalification Exam Guidelines

AI 30C-001

Continued Assurance of Simulator Fidelity

AI 30C-004

Simulator Real Time Capacity Testing

5B

AI 30C-005

Simulator Steady State Testing

9A

AI 30C-006

Simulator Transient Testing

AI 30C-007

Simulator Core Testing

AI 30C-008

Scenario Based Testing

2A

AI 30E-13

Written and Oral Examinations

26A

AI 30E-15

Just in Time Training

AI 30E-23

Remediation

AP 30B-001

Licensed Operator Requalification Training Program

GEN 00-004

Power Operation

STS SE-001

Power Range Adjustment to Calorimetric

SYS MA-200

Placing the Switchyard in a Ring Bus Configuration

Drawings

Number

Title

Revision

KD-7496

One Line Diagram

Condition Reports

105145

105841

2616

114281

115643

116660

117338

117340

117341

117414

117619

20012

20582

23951

Miscellaneous Documents

Number

Title

Revision/Date

Rose Hill Line Return to 100%

August 17,

2018

AIF 30B-15-07

Ops Requal Walk-through Exam Prep Checklist

AIF 30B-15-08

Simulator Examination Preparation Checklist

AIF 30B-15-09

Simulator Security Checklist

AIF 30B-15-15

Sequestering Checklist

AIF 30B-15-18

Simulator Setup Checklist

AIF 30B-15-19

JPM Exam Simulator Setup Checklist

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Day Shift

August 16,

2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Night Shift

August 16,

2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review: Night Shift

August 17,

2018

APF 29B-003-01 Surveillance Test Routing Sheet: STS SE-001

Completed

August 17,

2018

JPMs

2018 Exam -Week 2

June 2018

Remediation

Plan

February 2017

February 2017

Remediation

Plan

February 2018

February 2018

Remediation

Plan

January 2017

January 2017

Miscellaneous Documents

Number

Title

Revision/Date

Remediation

Plan

March 2018

March 2018

Remediation

Plan

September 2016

September

2016

Scenario 16-06

Requalification Exam

Scenarios

2018 Exam - Week 2

June 2018

Simulator Test

ATWS with a Faulted Steam Generator

May 10, 2017

Simulator Test

Steam Generator Fault Inside Containment

May 24, 2017

Simulator Test

Steam Generator Fault Outside Containment

May 18, 2017

SMP A11-095

Alarm Sounds are Different than in the Plant

May 31, 2011

SMP A16-041

Accumulator Reliefs Will Not Open or Leak By

August 24,

2016

SMP A16-047

Turbine Trip on Loss of Condensate Pump B

July 27, 2016

SMP A16-068

A Change in CCW Temp Does not Change RCP Bearing

Temps

November 15,

2016

SMP A17-102

Ventilation Fans Wont Stop/Start

July 20, 2017

SMP A17-114

MFP Speed Impacted by Change in RCS Pressure

April 10, 2018

SMP A17-160

Taking DRPI Switch to Half Accuracy Cleared DRPI Short

December 4,

2017

71111.12Maintenance Effectiveness

Procedures

Number

Title

Revision

AI 22C-010

Operations Work Controls

AI 22C-013

Protected Equipment Program

AP 22C-003

On-Line nuclear Safety and Generation Risk Assessment

AP 22C-007

Risk Management Contingency Planning

AP 22C-008

Qualitative Risk Management

4B

SYS NN-200A

Transferring NN01 and NN03 Buses Between Power

Sources

Drawings

Number

Title

Revision

M-12BG01

Piping & Instrumentation Diagram, Chemical and Volume

Control System

Condition Reports

21823

2610

2858

23047

23103

25743

Work Orders

17-426767-000

Miscellaneous Documents

Number

Title

Revision/Date

Evidence and Action Matrix: CR 122858/SWO 18-439146-

000/001

May 3, 2018

Functional Failure Evaluation - CR 94075

Review Date

April 24, 2015

Functional Failure Evaluation for GN - CR 89850

Review Date

December 8,

2014

Functional Failure Evaluation for GN - CR 91851

Review Date

March 21,

2015

Functional Failure Evaluation for GN - CR 94058

Review Date

April 21, 2015

Functional Failure Evaluation for GN - CR 95765

Review Date

May 3, 2015

Functional Failure Evaluation for GN - CR 95845

Review Date

May 4, 2015

Functional Failure Evaluation for GN - CR 110725

Review Date

August 22,

2017

Functional Failure Evaluation for GN - CR 11072508

Review Date

July 20, 2017

Functional Failure Evaluation for GN - CR 117126

Review Date

November 22,

2017

Miscellaneous Documents

Number

Title

Revision/Date

Functional Failure Evaluation for GN - CR 123103

Review Date

June 7, 2018

Functional Failure Evaluation for GN - CR 123272

Review Date

May 23, 2018

System Health Report - Containment Cooling - System

GN

January 1 -

June 30, 2017

System Health Report - Containment Cooling - System

GN

July 1 -

December 31,

2017

System Health Report - Containment Cooling - System

GN

January 1 -

June 30, 2018

System Health Report - Instrument AC Power - System

NN

January 1 -

June 30, 2017

System Health Report - Instrument AC Power - System

NN

July 1 -

December 31,

2017

System Health Report - Instrument AC Power - System

NN

January 1 -

June 30, 2018

APF 15C-002-01 Procedure Cover Sheet: Transferring NN01 and NN03

Buses Between Power Sources

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance

to Criteria and Goals: System NN

May 21, 2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-01

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-02

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-03

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-04

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-05

Printed

September 18,

2018

Miscellaneous Documents

Number

Title

Revision/Date

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-06

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-07

Printed

September 18,

2018

GN

Maintenance Rule Final Scope Evaluation: Containment

Cooling System - GN-08

Printed

September 18,

2018

NN

Maintenance Rule Final Scope Evaluation: Instrument AC

Power System - 120V (Class IE Power System) - NN01

Printed

August 15,

2018

NN

Maintenance Rule Final Scope Evaluation: Instrument AC

Power System - 120V (Class IE Power System) - NN02

Printed

August 15,

2018

71111.13Maintenance Risk Assessments and Emergent Work Control

Procedures

Number

Title

Revision

AI 15C-006

Management Oversight Requirements for Infrequently

Performed and Potentially Degrading Evolutions

CWD-1

Welding Program Manual

SYS NB-200

Transferring XNB01 Supply Between SL7 and #7

Transformer

SYS NB-200

Transferring XNB01 Supply Between SL7 and #7

Transformer

Drawings

Number

Title

Revision

C-1C6311

Fuel Building Conc. Neat Line & Reinforcing Plan Floor

El. 2,047-6

KD-7496

One Line Diagram

M-618.4-00010

M-12EF01

Piping & Instrumentation Diagram Essential SVC Water

System

Drawings

Number

Title

Revision

M-12EF02

Piping & Instrumentation Diagram Essential SVC Water

System

M-12EG01

Piping & Instrumentation Diagram Component Cooling

Water System

M-12EG02

Piping & Instrumentation Diagram Component Cooling

Water System

M12EG03

Piping & Instrumentation Diagram Component Cooling

Water System

M-12EM02

Piping & Instrumentation Diagram High Pressure Coolant

Injection System

M-K2EF01

Piping & Instrumentation Diagram Essential Service Water

System

M-K2EF03

Piping & Instrumentation Diagram Essential Service Water

System

Condition Reports

25201

25205

25224

25239

25245

25249

25250

25251

25252

25280

25372

25563

25637

25638

25716

Work Orders

16-414781-223

16-414781-304

18-441467-000

18-441467-003

18-441467-005

18-441467-008

Miscellaneous Documents

Number

Title

Date

303

Westar Energy, Inc. - Transmission Operating Directive

August 17, 2018

2987

Performance Improvement Request

October 2, 1998

APF 05C-004-01 WCNOC - Basic Engineering Disposition - SWO

16-4162460926 - Evaluation of Fuel Building for Loads

From Installation of the Cask Handling Crane (HKE14 -

Change Package 15044)

June 25, 2018

APF 05C-004-01 WCNOC - Basic Engineering Disposition - Cask

Handling Crane Modification: SARENs Heavy Lift Unit

(HLU)

August 28, 2018

APF 10-104-06

Boundary Watch Duties: Door #11274

July 22, 2018

Miscellaneous Documents

Number

Title

Date

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review - Day Shift

August 24, 2018

APF 21-001-02

Control Room Turnover Checklist - On-Coming CRS/WC

SRO/RO/BOP Review - Night Shift

August 25, 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk

Assessment: 2018-0305

July 30 to

August 5, 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk

Assessment: 2018-0308

August 20 to

August 26, 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment

2018-0309

August 27 to

September 2,

2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk

Assessment: 2018-0313

September 24 to

September 30,

2018

APF 28A-001-01 Performance Improvement Request

PIR 982987

71111.15Operability Determinations and Functionality Assessments

Procedures

Number

Title

Revision

AP 21I-001

Temporary Configuration Changes

AP 26C-004

Operability Determination and Functionality Assessment

CNT-MM-303

Temporary Support Guidelines

CWD-1

Welding Program Manual

Drawings

Number

Title

Revision

M-12BG05

Piping & Instrumentation Diagram Chemical and Volume

Control System

M-12EF01

Piping & Instrumentation Diagram Essential SVC Water

System

M-12EF02

Piping & Instrumentation Diagram Essential SVC Water

System

M-12EF06

Piping Isometric Essential Service Water Sys. [System] Aux.

[Auxiliary] Bldg. [Building] A & B Train Supply & Return

Drawings

Number

Title

Revision

M-12EG01

Piping & Instrumentation Diagram Component Cooling

Water System

M-12EG02

Piping & Instrumentation Diagram Component Cooling

Water System

M-12EG03

Piping & Instrumentation Diagram Component Cooling

Water System

M18BG35A(Q)

Hanger Details Small Pipes Misc. and Boric Acid Storage

Tanks Vents - Auxiliary Building

M-19BG35(Q)

Hanger Location Drawing Small Pipe Misc. and Boric Acid

Storage Tanks Vents-Auxiliary Building

M-K2EF01

Piping & Instrumentation Diagram Essential Service Water

System

M-K2EF03

Piping & Instrumentation Diagram Essential Service Water

System

Condition Reports

23902

23903

23905

23906

23907

23908

24948

25201

25205

25224

25243

25361

25374

25468

25487

25552

25560

25561

25638

25641

25716

Work Orders

18-439119-000

18-440015-000

18-441039-002

18-441039-003

18-441467-000

18-441467-003

18-441467-005

18-441467-008

Miscellaneous Documents

Number

Title

Revision/Date

AIF 28A-100-12

Wolf Creek Generating Station - Basic Cause Evaluation:

BGLT0106 Temporary Support Usage

September 8,

2018

APF 05C-004-01

Basic Engineering Disposition - Evaluation of the Use of a

Temporary Pipe Support for Replacement of BGLT0106,

Boric Acid Tank B Level Transmitter

APF 10-104-06

Boundary Watch Duties: Door #11274

July 22, 2018

Miscellaneous Documents

Number

Title

Revision/Date

CNTF-MM-300-01 Quality Inspection Checklist - Pipe Support: BG35-

C527/112 (Q)

CNTF-MM-300-02 Section I Generic Inspection Item Instructions

CNTF-MM-300-07 Section VI - Small Bore/MS 25W Supports - Pipe

Support: BG35-C257/112 (Q)

CNTF-MM-303-01 Temporary Supports - Pipe Support: BG35-C527/112 (Q)

DG-C-002

Wolf Creek Nuclear Operating Corporation - Design

Guide: Evaluation Criteria for Temporary Acceptance of

Flaws in Moderate Energy Class 2 or 3 Piping

NK-E-001

25 VDC [Volt Direct Current] Class 1E Battery System

Sizing, Voltage Drop and Short Circuit Studies

OE EF-18-003

Operability Evaluation

OE NK-18-005

Operability Evaluation

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

71111.18Plant Modifications

Work Orders

16-414781-160

16-414781-223

16-414781-351

Miscellaneous Documents

Number

Title

Revision

DCP 14269

50.59 Evaluation TMP 18-001

DCP 14269

Configuration Summary

DCP 14269

Design Input Data Sheet

DCP 14269

Design Verification Report, SGK05 Permanent

Compensatory Modifications

DCP 14269

Engineering Screening, SGK05 Permanent Compensatory

Modifications

DCP 14269

Post Modification Testing Plan

71111.19Post Maintenance Testing

Procedures

Number

Title

Revision

QCP-20-540

VT-1 Visual Examination

STS BG-100A

Centrifugal Charging System A Train Inservice Pump Test

STS EG-100A

Component Cooling Water Pumps A/C Inservice Pump Test 33A

SYS EG-120

Component Cooling Water System

Drawings

Number

Title

Revision

M-12EG01

Piping & Instrumentation Diagram Component Cooling

Water System

Condition Reports

26021

26025

26036

26037

26038

26039

26040

26041

26734

Work Orders

18-441467-000

18-441467-003

Miscellaneous Documents

Number

Title

Revision/Date

18-025

Section XI Program Final Work Order Completion Review

Signature Sheet: Work Order Number 18-441467-003

July 31, 2018

APF 15C-002-01 Procedure Cover Sheet - Component Cooling Water

System

APF 16A-003-01 ASME Section XI Repair/Replacement Plan Wolf Creek

Generating Station - Plan No. 2018-025

July 22, 2018

APF 22C-008-01 Qualitative Risk Screening

July 22, 2018

APF 29B-003-01 Surveillance Test Routing Sheet - Component Cooling

Water Pumps A/C Inservice Pump Test

August 13,

2018

APF 29B-003-01 Surveillance Test Routing Sheet - STS BG-100A

Completed

September 18,

2018

Miscellaneous Documents

Number

Title

Revision/Date

ET 18-0026

Docket No. 50-482: Supplement to Letter Dated July 23,

2018, Inservice Inspection Program Relief Request From

the Requirements of American Society of Mechanical

Engineers (ASME) Code Case N-666-1, Weld Overlay of

Class 1, 2, and 3 Socket Welded Connections,Section XI,

Division 1

August 28,

2018

71111.22Surveillance Testing

Procedures

Number

Title

Revision

STS BG-210

CVCS Inservice Check Valve Test

STS CH-019

Containment Spray Additive Tank NAOH Concentration

7A

STS EJ-100B

RHR System Inservice Pump A Test

STS EN-005

Containment Spray Additive Tank Volume Verification

STS IC-459

Channel Calibration Spray Additive Tank Level Loop

ENLP0015

6C

Drawings

Number

Title

Revision

10466-J-110-

149-W08

Instrument Loop Diagram - Containment Spray System

Spray Additive Tank Full Range Level (Train A)

M-105B-0005

A6 ODX13Y-8 LG Contain Spray Additive Tank

M-105B-00018

Details-Containment Spray Additive Tank

Condition Reports

24979

25017

26396

Miscellaneous Documents

Number

Title

Revision/Date

APF 05-002-05

Engineering Disposition: Use of EN-LG-22 for Tech Spec

Surveillance

APF 28A-001-01

Performance Improvement Request: PIR 2006-0425

Initiated

February 19,

2006

Miscellaneous Documents

Number

Title

Revision/Date

APF 29B-003-01

Surveillance Test Routing Sheet - STS BG-210

Completed

September 20,

2018

APF 29B-003-01

Surveillance Test Routing Sheet - STS CH-019

Completed

July 18, 2018

APF 29B-003-01

Surveillance Test Routing Sheet - STS EN-005

Completed

July 18, 2018

APF 05-002-05

Engineering Disposition: PIR 2000-0394 - Use of EN-LG-22

for Tech Spec Surveillance

APF 05-004-01

Design Specification for Shop Fabricated Tanks (ASME III):

M-105B

LER 2000-001-00 Surveillance Method Results in Low NaOH Level in the

Spray Additive Tank

March 13,

2000

STS CH-019

Containment Spray Additive Tank NAOH Concentration

Completed

July 18, 2018

STS EN-005

Containment Spray Additive Tank Volume Verification

Completed

July 18, 2018

71114.02 - Alert and Notification System Testing

Procedures

Number

Title

Revision

EPP 06-019

Alert and Notification System Sirens, March 26, 2003

EPP 06-019

Alert and Notification System Sirens, October 2, 2016

9A

EPP 06-022

Tone Alert Radio Maintenance/Compensating Measures,

April 4, 2014

5A

Work Orders

16-411700

16-416603

17-422188

17-430259

Miscellaneous Documents

Number

Title

Date

Letter, Mr. Ronald

L. McCabe, RAC Chair, FEMA

Region VII to Mr. Richard Flannigan, Manager, Regulatory

Affairs, Wolf Creek Nuclear Operating Corporation;

Response to the Final Siren Test Report Review, from

American Signal Corporation for WCNOC

May 7, 2008

Miscellaneous Documents

Number

Title

Date

Memorandum, American Signal Corporation; Validation of

Outdoor Siren Propagation Model through Acoustic Testing

and Measurement of the Wolf Creek ANS Sy

REP-10 Design Review Report, Wolf Creek Nuclear

Operating Company

May 7, 2008

Tone Alert Radio Audit Plan

December 5,

2017

Tone Alert Radio Audit Plan

December 8,

2016

71114.03 - Emergency Response Organization Staffing and Augmentation System

Procedures

Number

Title

Revision

EPP 06-015

Emergency Response Organization Callout, September 30,

2015

Condition Reports

115983

24451

Miscellaneous Documents

Number

Title

Date

16-Q3 Quarterly Callout Test Conducted September 12,

2016

September 13,

2016

16-Q4 Quarterly Callout Test Conducted December 8,

2016

December 8,

2016

17-Q1 Quarterly Callout Test Conducted March 28, 2017

March 30,

2017

17-Q2 Quarterly Callout Test Conducted June 27, 2017

June 29, 2017

17-Q3 Quarterly Callout Test Conducted September 6,

2017

September 20,

2017

17-Q4 Quarterly Callout Test Conducted November 27,

2017

November 29,

2017

18-Q1 Quarterly Callout Test Conducted March 14, 2018

March 14,

2018

18-Q2 Quarterly Callout Test Conducted June 18, 2018

June 21, 2018

71114.05 - Maintenance of Emergency Preparedness

Procedures

Number

Title

Revision/Date

AP 06-002

Radiological Emergency Response Plan, August 7, 2018

18B

AP 06-004

Equipment Important to Emergency Response, January 18,

2018

AP 17C-024

Emergency Planning Responsibilities, September 30, 2015

AP 17C-028

Emergency Response Duties and Responsibilities,

September 24, 2015

AP 21A-002

Diverse and Flexible Coping Mitigation Strategies Program

APF 06-002-01

Emergency Action Levels

17B

EPP 06-009

Drill and Exercise Requirements, January 24, 2017

EPP 06-018

Maintenance of Emergency Facilities and Communications

Checks, November 29, 2016

EPP 06-021

Training Programs, November 28, 2017

EPP 06-023

Emergency Response Facility Functionality, December 16,

2015

Tool Kit 010

Dosimeter Annual Calibration (RDDs and PICs)

April 13, 2017

Condition Reports

109918

111604

111626

2435

113322

113710

114405

115932

116368

116717

117040

117446

119507

119903

20017

20356

23795

23980

24428

24498

25031

25976

Work Orders

2-352615-000

15-408018-000

Miscellaneous

Number

Title

Revision/Date

CFR 50.54Q Screenings/Evaluations for AP 06-004,

Equipment Important to Emergency Preparedness, R7

October 16,

2017

CFR 50.54Q Screenings/Evaluations for EPP 06-001,

Control Room Operations, R10

July 30, 2018

Miscellaneous

Number

Title

Revision/Date

CFR 50.54Q Screenings/Evaluations for EPP 06-003,

Emergency Operations Facility Operations, R13

October 16,

2017

CFR 50.54Q Screenings/Evaluations for EPP 06-007,

Emergency Notifications, R16

October 16,

2017

CFR 50.54Q Screenings/Evaluations for EPF 06-018-

09, Offsite Monitoring Inventory Checklist, R29

August 2, 2017

CFR 50.54Q Screenings/Evaluations for EPF 06-018-

2, Emergency Operations Facility Checklist, R30

August 2, 2017

CFR 50.54Q Screenings/Evaluations for EPP 06-021,

Training Programs, R19

November 16,

2017

Annual PMP Checks

November 16,

2017

Control Room Inventory Checklist

March 13, 2018

Control Room Inventory Checklist

October 5, 2017

Emergency Planning Monthly Communications Checklist

December 5,

2016

Emergency Planning Monthly Communications Checklist

March 21, 2017

Emergency Planning Quarterly Communications

Checklist

February 27,

2017

Emergency Planning Quarterly Communications

Checklist

February 28,

2018

Emergency Response Facility Functionality Evaluation

October 11,

2017

Offsite Medical Emergency Supplies Inventory Checklist

December 14,

2016

Offsite Medical Emergency Supplies Inventory Checklist

April 23, 2018

Offsite Monitoring Inventory Checklist

December 15,

2016

Offsite Monitoring Inventory Checklist

March 13, 2018

Offsite Monitoring Inventory Checklist, Post-Exercise

March 1, 2018

Technical Support Center Inventory Checklist

September 8,

2016

Technical Support Center Inventory Checklist

July 21, 2017

Technical Support Center Inventory Checklist

October 5, 2017

Miscellaneous

Number

Title

Revision/Date

Technical Support Center Inventory Checklist, Post-

Exercise

September 25,

2017

Topeka Joint Information Clearinghouse Inventory

Checklist

February 16,

2017

Topeka Joint Information Clearinghouse Inventory

Checklist

February 28,

2018

Topeka Joint Information Clearinghouse Inventory

Checklist, Post-Exercise

March 30, 2017

Wolf Creek Joint Information Clearinghouse Inventory

Checklist

March 30, 2017

Wolf Creek Joint Information Clearinghouse Inventory

Checklist

February 28,

2018

16-SA-02

Evaluation Report for the Exercise Conducted

December 7, 2016

December 14,

2016

17-04-EP

Quality Assurance Audit Report

June 8, 2017

17-EVAL

Evaluation Report for the Exercise Conducted

November 14, 2017

December 12,

2017

17-PRE-01

Evaluation Report for the Exercise Conducted

September 19, 2017

September 25,

2017

17-PRE-02

Evaluation Report for the Exercise Conducted

October 24, 2017

December 12,

2017

17-SA-01

Evaluation Report for the Exercise conducted February

14, 2017

March 13, 2017

17-SA-01

Evaluation Report for the Exercise Conducted February

13, 2018

February 20,

2018

17-SA-02

Evaluation Report for the Exercise Conducted March 14,

2017

April 3, 2017

17-SA-02

Evaluation Report for the Exercise Conducted April 18,

2017

August 15, 2017

17-SA-02

Evaluation Report for the Exercise Conducted July 18,

2017

August 15, 2017

18-05-EP

Quality Assurance Audit Report

June 20, 2018

18-SA-01

Evaluation Report for the Exercise Conducted

February 27, 2018

CE1235610

Lesson Plan: Offsite Dose Projection using EDCP,

August 14, 2018

13A

Miscellaneous

Number

Title

Revision/Date

QH-2016-1348

NRC Emergency Preparedness Cornerstone Assessment

QH-2016-1357

ERO Membership Review by Organization

October 5, 2016

QH-2017-1426

Monticello 50.54(q) Review

March 8, 2017

QH-2017-1427

Monticello ERO Team Change Briefing

March 8, 2017

QH-2017-1438

Assessment of Chemistry and RP use within the On Shift

Staffing Assessment

March 8, 2017

QH-2017-1464

INPO Drill and Exercise Scenario Seminar Trip Report

April 24, 2017

QH-2017-1558

Emergency Planning NRC Inspection Readiness

October 5, 2017

QH-2018-1681

Emergency Response Personnel Training Self-

Assessment

June 26, 2018

71114.06Drill Evaluation

Procedures

Number

Title

Revision

EPP 06-006

Protective Action Recommendations

9A

Condition Reports

26171

26183

26184

26185

26186

26189

26190

26192

26193

26195

26197

26198

26199

26200

26201

26202

26203

26204

26205

26206

26207

26208

26210

26212

26213

Miscellaneous Documents

Number

Title

Revision/Date

18-SA-02

Wolf Creek Generating Station - Emergency Planning Drill

August 28,

2018

APF 06-002-01

Emergency Action Levels

17B

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment:

2018-309

August 27 to

September 2,

2018

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification -

Message #: CR-001

August 28,

2018

Miscellaneous Documents

Number

Title

Revision/Date

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification -

Message #: EOF-002

August 28,

2018

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification -

Message #: EOF-003

August 28,

2018

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification -

Message #: EOF-004

August 28,

2018

EPF 06-007-01

Wolf Creek Generating Station Emergency Notification -

Message #: TSC-001

August 28,

2018

Scenario 16-06

Requalification Exam

71124.05Radiation Monitoring Instrumentation

Procedures

Number

Title

Revision

AI 02E-009

Instructions for Intrinsic Germanium Detector Energy

Calibration

13A

AI 02E-010

Instructions for IG Detector Efficiency Calibration

7A

AI 03-008

Control Chart Development, Use and Review Using Lab

Stats

AP 02-008

Verification of Analytical Performance

AP 02E-001

Chemistry Calibration Program

AP 23-006

System Engineering Program

27A

AP 25A-001

Radiation Protection Manual

RPP 01-405

HP Instrument Program

RPP 03-407

Testing of Portal Monitors as Passive Whole Body Counters 1A

RPP 05-306

PM12 Operation

RPP 05-707

Operation of Whole Body Counters

RPP 06-103

Ludlum 9-4 Calibration

RPP 06-113

MGP Telepole Calibration

RPP 06-222

Escort Elf Calibration

RPP 06-306

PM12 Calibration

RPP 06-315

Eberline PCM-1B Calibration

RPP 06-317

Eberline PCM-2 Calibration

Procedures

Number

Title

Revision

RPP 06-319

SAM11 Calibration

RPP 06-707

Calibration of WBC Detectors Using Ortec Renaissance

Software

RPP 06-715

Whole Body Counter Quality Control

RPP 06-825

J. L. Shephard Multi-Source Calibration System Operation

8A

STS IC-452B

Channel Calibration New Fuel Storage Facility Criticality

Monitor SDRE-0035

4A

STS IC-454B

Channel Calibration Spent Fuel Pool Criticality Monitor Area

Radiation Monitor SDRE-0038

STS SP-292

Channel Calibration of Condenser Air Discharge Monitor GE

RE-0092

Audits, Self-Assessments, and Surveillances

Number

Title

Date

18-01-RP/PC

Quality Assurance Audit Report: Radiation Protection and

Process Control (RP & PC)

February 15,

2018

QA-2017-0387

Quality Assessment: Radiation Protection (RP) Equipment

Calibration Controls

December 29,

2017

Condition Reports

107189

107190

107191

107193

113038

113556

116717

118252

118867

20567

20963

21150

Miscellaneous Documents

Number

Title

Revision/Date

System Health Report: Radiation Monitoring

January 1,

2018, through

June 30, 2018

10066

WBC Calibration Certificate GI Detector

10066

WBC Calibration Certificate Lung Detector

10066

WBC Calibration Certificate Thyroid Detector

10178

Telepole

242

PCM-2

Miscellaneous Documents

Number

Title

Revision/Date

256

ASP-1

257

ASP-1

11005

SAM 11

11075

Shepherd Calibrator

11377

PCM-1B

11451

Radeco H809V-1

13027

WBC Calibration Certificate Lower Detectors

13027

WBC Calibration Certificate Upper/Lower Detectors

217

Ludlum 9-4

219

Ludlum 9-4

2160566

Liquid Scintillator

Chapter 11

Updated Safety Analysis Report: Radioactive Waste

Management

WO 16-427623-

001

Minor Maintenance Containment Atmospheric Radiation

Monitor GTRE0032

November 15,

2016

WO 16-427623-

003

Routine Maintenance Containment Purge Exhaust

Radiation Monitor GTRE0033

November 15,

2016

WO 18-42244

Channel Calibration High Range Area Radiation Monitor

GTRE60

WO 18-422785

Channel Calibration High Range Area Monitor GTRE-0059

WO 18-422892

Channel Calibration High Range Area Radiation Monitor

GTRE59

WO 18-422893

Channel Calibration High Range Area Radiation Monitor

GTRE60

WO 18-434709

Channel Calibration of Condenser Air Discharge Monitor

GE RE-0092

71124.06Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number

Title

Revision

AP 02E-001

Chemistry Calibration Program

AP 07B-003

Offsite Dose Calculation Manual

CHS AC-001

Accident Sampling

4C

Procedures

Number

Title

Revision

CHS AX-G01

Unit Vent Sampling and/or Exchange of Filters

STN BM-054

Steam Generator Blowdown System Surge Tank Discharge

Flow to Lake Channel Calibration

7C

STN CH-021

Calibration of the Particulate Detector for Radiation Monitors

GTRE21A and GHRE10A

STN CH-022

Calibration of the Iodine Detector for Radiation Monitors

GTRE21A and GHRE10A

STN HB-1085

Liquid Radwaste System Discharge Line Flow Rate

Calibration

STN SP-118

Channel Calibration Liquid Radwaste Discharge Radiation

Monitor HB RE-0018

STN SP-195

Channel Calibration Hi/Lo TDS Discharge to Waste Water

Treatment Radiation Monitor HF RE-0095

STS CH-014

Calibration of Monitors GT RE-21B and GH RE-10B

STS PE-002

Charcoal Adsorbent Sampling for Nuclear Safety Related

Units

STS PE-006

Charcoal Adsorber In-Place Leak Test Safety Related Units

Audits and Self-Assessments

Number

Title

Date

18-03-ENV

QA Audit: Environmental Management

April 17, 2018

Condition Reports

107421

107983

108892

111266

2928

113578

113944

116717

118486

23726

26072

Effluent Release Permits

Permit Number

Type

Release System

Date

U1GB2018-111

Gas

Containment Purge

August 12, 2018

U1GC2018-110

Gas

Radwaste Vent

August 9, 2018

U1LB2018-067

Liquid

THF04A

July 14, 2018

U1LC2018-065

Liquid

Steam Generator Blowdown

July 3, 2018

Calibrations and Surveillances

Work Order

System

Date

GH-RE-10A

March 20, 2018

GH-RE-10B

December 13,

2016

GT-RE-21A

February 19,

2018

GT-RE-21B

October 3, 2017

16-418841-000

BM-054

March 2, 2017

17-421198-000

HF RE-0095

June 26, 2017

17-423608-000

HB-RE-0018

July 18, 2017

17-431311-000

FGG02B

January 9, 2018

17-433703-000

FGG02A

June 18, 2018

18-435515-000

HB-1085

August 13, 2018

Miscellaneous Documents

Number

Title

Date

15-CHL-008

Certificate of Calibration-Standard Reference Source

101145

Simulated Gas in 130G GA-MA Gas Beaker

July 1, 2015

16-CHL-005

Certificate of Calibration-Standard Reference Source

2600

47mm Diameter Simulated Filter in Snap Falcon Petri

January 1, 2016

2016

Annual Radioactive Effluent Release Report

April 25, 2017

2017

Annual Radioactive Effluent Release Report

April 25, 2018

71124.07Radiological Environmental Monitoring Program

Procedures

Number

Title

Revision

AI 07-007

Onsite Groundwater Protection Program Monitoring

AI 07B-002

Review of Radiological Environmental Lab Analysis

AI 07B-009

Collection, Prep, and Shipment of Sediment

AI 07B-011

Collection, Prep, and Ship of Water

AI 07B-015

Land Use Census

Procedures

Number

Title

Revision

AI 07B-034

Radiological Environmental Monitoring Program Air

Sampling

AI 07B-035

REMP OSL Dosimeters

AP 07B-005

Ground Water Protection Program

STS IC-890A

Wind Speed Meteorological Instrumentation Channel

Calibration

STS IC-890D

Sonic Wind-Direction-Deviation Meteorological

Instrumentation Channel Calibration

Audits, Self-Assessments, and Surveillances

Number

Title

Date

28

Evaluation Report (NUPIC) of ATI Environmental, Inc.

June 16, 2017

4059

Evaluation Report (NUPIC) of Landauer (4059)

June 16, 2017

Audit 18-03

Quality Assurance Audit Report, Environmental

Management: K15-002

March 29,

2018

QH-2017-1456

AI 07B-034, Radiological Environmental Monitoring

Program Air Sampling

March 30,

2018

QH-2017-1456

Radiological Environmental Monitoring Program (REMP)

contracted services per AI 07B-005, Section 6.12

April 24, 2017

QH-2018-1391

Review of the KDHE REMP Report

December 6,

2016

QH-2018-1684

REMP Review of 2015 through 2017 Wind Directions

June 7, 2018

Condition Reports

101560

106475

115681

118440

Calibrations and Surveillances

Number

Title

Date

3302

Digital Venturi Calibrator

March 7, 2017

3302

Digital Venturi Calibrator

March 13,

2018

W0 17-432379

Channel Calibration Sonic Wind Speed

April 20, 2018

W0 17-432382

Channel Calibration Wind Direction

March 26,

2018

Calibrations and Surveillances

Number

Title

Date

W0 17-432417

Channel Calibration Wind Speed Meteorological

Instrumentation

March 26,

2018

Miscellaneous Documents

Number

Title

Revision/Date

Environmental Resources Management: Risk Assessment

for Systems, Structures, and Components, Groundwater

Protection Initiative, Wolf Creek

August 20,

2008

Review of Radiological Environmental Lab Analysis

Results

Technical Requirements Manual

Wolf Creek Generating Station Power Block - Ground

Water Monitoring Network

2008

Preliminary Hydrology Study, Wolf Creek Generating

Station, Environmental Resources Management

December 18,

2007

2009

Coffey County Lake - Ground Water Monitoring Network

Documentation Report, Delta Consultants

October 9,

2009

2016

Annual Radioactive Effluent Release Report

April 25, 2017

2016

Annual Radiological Environmental Operating Report

April 24, 2017

2017

Annual Radioactive Effluent Release Report

April 25, 2018

2017

Annual Radiological Environmental Operating Report

April 25, 2018

2018

Digital Flow Meter Calibration Verification, AIF 07B-034-01 1

71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation

Procedures

Number

Title

Revision

AP 31A-100

Solid Radwaste Process Control Program

HW1215801

Regulations and Requirements

2A

HW1215802

Regulatory Awareness for Hazardous Material Handlers

HW8115901

Wolf Creek Hazardous Material Transportation Security

Plan

RPP 07-110

Solid Radwaste Packaging

Procedures

Number

Title

Revision

RPP 07-112

Processing Cartridge Filters

RPP 07-123

Preparation and Shipment of Radioactive Waste and

Material

RPP 07-131

Bead Resin/Activated Carbon Dewatering Procedure For

Energy Solutions14-215 or Smaller Liners, Utilizing

Energy Solutions Self-Engaging Dewatering System

Audits and Self-Assessments

Number

Title

Date

18-01-RP/PC

Quality Assurance Audit Report: Radiation Protection and

Process Control (RP & PC)

February 15,

2018

Condition Reports

2184

97750

97752

110270

113038

114455

119333

119745

119751

119765

119766

20567

Radioactive Material and Waste Shipments

Number

Type

Title

Date

16R02

Dry Active

Waste

UN2912, Radioactive Material, LSA-I, 7, A(U)

February 9, 2016

16R15

Resins

UN3321, Radioactive Material, LSA-II, 7, A(U)

May 18, 2016

16R16

Filters;

Resin

UN3321, Radioactive Material, LSA-II, 7, C

June 1, 2016

16R32

Dry Active

Waste

UN3321, Radioactive Material, LSA-II, 7, A(U)

September 15,

2016

16R59

Resin

UN3321, Radioactive Material, LSA-II, 7, RQ, B

October 14, 2016

16R64

Resin

UN3321, Radioactive Material, LSA-II, 7, A(U)

October 23, 2016

17R04

Dry Active

Waste

UN2912, Radioactive Material, LSA-I, 7, A(U)

February 16, 2017

17R14

Dry Active

Waste

UN3321, Radioactive Material, LSA-II, 7, A(U)

May 24, 2017

17R15

Resin

UN3321, Radioactive Material, LSA-II, 7, A(U)

June 22, 2017

Radioactive Material and Waste Shipments

Number

Type

Title

Date

17R17

Dry Active

Waste

UN2912, Radioactive Material, LSA-I, 7, A(U)

July 12, 2017

17R31

Dry Active

Waste;

Resin

UN3321, Radioactive Material, LSA-II, 7, A(U)

September 18,

2017

Waste Stream Analysis - Nuclide Distribution Reports

Number

Title

Date

29898001

Cation Resin

July 17, 2017

29998002

BTRS Resin

August 2, 2017

446223001

RCS Filters

March 1, 2018

446223002

SFP Filters

February 28, 2018

446223003

Dry Active Waste

March 12, 2018

447547001

CVCS Resins

March 27, 2018

447769002

Drum Dryer Waste Tank

March 31, 2018

Radiological Surveys

Number

Title

Date

M-20180321-11

High Level Radwaste Storage

March 21, 2018

M-20180326-10

Low Level Radwaste Storage

March 26, 2018

M-20180523-9

RCA Yard

May 23, 2018

M-20180611-3

Owens Corning

June 11, 2018

M-20180721-1

New Radwaste Building

July 21, 2018

M-20180728-7

RCA Yard

July 28, 2018

Miscellaneous Documents

Number

Title

Revision/Date

2016 Annual Radioactive Effluent Release Report

April 25, 2017

2017 Annual Radioactive Effluent Release Report

April 25, 2018

Spent Fuel Pool Inventory: Tri-Nuke Filters

August 23, 2018

Miscellaneous Documents

Number

Title

Revision/Date

Wolf Creek Updated Safety Analysis Report - Chapter

11.4 and Chapter 12.2.1

RPF 07-123-01

Radioactive Shipment Log: 2016, 2017, 2018

71151Performance Indicator Verification

Procedures

Number

Title

Revision

AI 26A-004

Emergency Planning Performance Indicators, May 2, 2016

AP 26A-001

Reportable Events, Evaluation and Documentation, July 24,

2014

AP 34-003

Performance Indicator Program, August 17, 2010

EPP 06-005

Emergency Classification, February 23, 2016

EPP 06-006

Protective Action Recommendations, December 14, 2017

9A

EPP 06-007

Emergency Notifications, October 18, 2017

EPP 06-019

Alert and Notification System Sirens, October 2, 2016

9A

Condition Reports

110999

116997

118425

119906

20323

26201

27496

27526

Miscellaneous Documents

Number

Title

Revision/Date

MSPI Derivation Report - MSPI System: MSPI Cooling

Water System; MSPI Element: Performance Limit Exceeded

(PLE)

August 2018

MSPI Derivation Report - MSPI System: MSPI Cooling

Water System; MSPI Element: Unavailability Index (UAI)

August 2018

MSPI Derivation Report - MSPI System: MSPI Cooling

Water System; MSPI Element: Unreliability Index (URI)

August 2018

MSPI Derivation Report - MSPI System: MSPI Emergency

AC Power System; MSPI Element: Performance Limit

Exceeded (PLE)

August 2018

MSPI Derivation Report - MSPI System: MSPI Emergency

AC Power System; MSPI Element: Unavailability Index

(UAI)

August 2018

Miscellaneous Documents

Number

Title

Revision/Date

MSPI Derivation Report - MSPI System: MSPI Emergency

AC Power System; MSPI Element: Unreliability Index (URI)

August 2018

MSPI Derivation Report - MSPI System: MSPI High

Pressure Injection System; MSPI Element: Performance

Limit Exceeded (PLE)

August 2018

MSPI Derivation Report - MSPI System: MSPI High

Pressure Injection System; MSPI Element: Unavailability

Index (UAI)

August 2018

MSPI Derivation Report - MSPI System: MSPI High

Pressure Injection System; MSPI Element: Unreliability

Index (URI)

August 2018

MSPI Unavailability for Chemical & Volume Control System

BG-07A

Printed

September 11,

2018

MSPI Unavailability for Chemical & Volume Control System

BG-07B

Printed

September 11,

2018

MSPI Unavailability for Component Cooling Water System

EG-01A

Printed

September 11,

2018

MSPI Unavailability for Component Cooling Water System

EG-01B

Printed

September 11,

2018

MSPI Unavailability for Essential Service Water EF-01A

Printed

September 11,

2018

MSPI Unavailability for Essential Service Water EF-01B

Printed

September 11,

2018

MSPI Unavailability for High Pressure Coolant Injection

System EM-01A

Printed

September 11,

2018

MSPI Unavailability for High Pressure Coolant Injection

System EM-01B

Printed

September 11,

2018

MSPI Unavailability for Standby Diesel Engine System KJ-

01A

Printed

September 11,

2018

Miscellaneous Documents

Number

Title

Revision/Date

MSPI Unavailability for Standby Diesel Engine System KJ-

01B

Printed

September 11,

2018

Unavailability Data

July 2017

through June

2018

Unreliability Data

July 2017

through June

2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: BG - 112594

May 17, 2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: BG - CR 118860

February 12,

2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: BG - CR 121938

May 3, 2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: BG - CR 122610

May 16, 2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: EF - CR 125201

August 9,

2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: EG - CR 120591

December 5,

2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: EM - CR 112588

May 17, 2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: EM - CR 112594

May 17, 2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: KJ - CR 112131

April 27, 2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: KJ - CR 115725

October 1,

2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: KJ - CR 117441

December 5,

2017

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: NB - CR 126025

September 5,

2018

EDI 23M-050

Engineering Desktop Instruction Monitoring Performance to

Criteria and Goals - System: NG - CR 115725

October 1,

2017

WCNOC-163

NEI 99-02 Reactor Oversight Process Performance

Indicators - Mitigating System Performance Index (MSPI)

Basis Document

Miscellaneous Documents

Number

Title

Revision/Date

WCRE-34

Fourth Ten Year Interval Inservice Testing Bases Document

71152Problem Identification and Resolution

Procedures

Number

Title

Revision

AP 10-104

Breach Authorization

AP 10-104

Breach Authorization

37A

AP 15C-002

Procedure Use and Adherence

AP 23-009

Control Room Envelope Habitability Program

STS PE-004

Aux Building and Control Room Pressure Test

SYS AE-150

Main Feedwater Pump Reset

SYS AE-150

Main Feedwater Pump Reset

SYS GK-122

Manual CRVIS Line-Up

Drawings

Number

Title

Revision

M-12GG01

Piping & Instrumentation Diagram Fuel Building HVAC

M-12GL02

Piping & Instrumentation Diagram Auxiliary Building HVAC

M-12GT01

Piping & Instrumentation Diagram Containment Purge

Systems HVAC

M-1H1531

Heating Ventilating and Air Cond. Auxiliary Building El.

2047-6 Area-3

Condition Reports

29602

246

90956

90975

110377

119330

20056

20151

2180

23289

Work Orders

2-355727-011

15-397077-000

17-421482-000

17-421482-001

17-423496-000

17-428518-000

17-428518-001

18-437033-006

Miscellaneous Documents

Number

Title

Revision/Date

U.S. Nuclear Regulatory Commission Regulatory

Guide 1.117: Tornado Design Classification

AIF 10-001-02

SCBA Inspection [3.2.1]

Completed

March 1, 2018

AIF 28A-100-12

Wolf Creek Generating Station Basic Cause Evaluation -

CR 90975

February 20,

2015

AIF 28A-100-12

Wolf Creek Generating Station Basic Cause Evaluation -

CR 120056

April 5, 2018

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and

Control Room Pressure Test - Train A - STS PE-004

Completed

March 15,

2018

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and

Control Room Pressure Test - Train B - STS PE-004

Completed

March 7, 2018

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and

Control Room Pressure Test - Train B - STS PE-004

Completed

March 15,

2018

CR 120056

Evidence and Action Matrix B CRVIS Pressure Issue

March 5, 2018

K01-048 03146

Material Safety Data Sheet: Ventilation Smoke Tube - P/N

458480

WCRE

Boundary Matrix

WCRE-35

Boundary Matrix

The following items are requested for the

Public Radiation Safety Inspection

at Wolf Creek

Dates of Inspection: August 20, 2018 to August 23, 2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before August 6, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled

5-A, applicable organization charts in file/folder 5-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

Louis.Carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

5.

Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection:

May 23, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B.

Applicable organization charts

C.

Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and

LERs, performed since the date of the last inspection related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D.

Procedure index for:

1. Calibration, use, and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure index.

1. Calibration of portable ion chambers

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters

2. Installed radiation monitors

3. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Most recent calibration data for the whole body counters.

H.

Radiation Monitoring System health report for the previous 12 months

6.

Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection:

May 23, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D.

Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Annual Radioactive Effluent Release Reports for calendar years 2016 and 2017, or the

two most recent reports.

H.

Current revision of the Offsite Dose Calculation Manual

I.

The 2016 and 2017 inter-laboratory comparison results for laboratory quality control

performance of effluent sample analysis, or the two most recent results.

J.

Effluent sampling schedule for the week of the inspection

K.

New entries into 10 CFR 50.75(g) files since the date of the last inspection

L.

Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M.

Listing or log of liquid and gaseous release permits since the date of the last inspection

N.

A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O.

System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s).

P.

A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

Q.

A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

7.

Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection:

May 23, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D.

Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Copies of the two most recent calibration packages for the meteorological tower

instruments

H.

Copies of the 2016 and 2017 Annual Radiological Environmental Operating Reports and

Land Use Census, and current revision of the Offsite Dose Calculation Manual.

I.

Copy of the environmental laboratorys inter-laboratory comparison program results for

2016 and 2017, or the two most recent results, if not included in the annual radiological

environmental operating report

J.

Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

K.

Quality Assurance audits (e.g., NUPIC) for contracted services

L.

Current NEI Groundwater Initiative Plan and status

M.

Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

N.

If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection.

8.

Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection:

May 23, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B.

Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C.

Copies of audits, department self-assessments, and LERs written since the date of the

last inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D.

Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E.

Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Waste stream sampling and analysis

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

Copies of training lesson plans for 49 CFR 172 subpart H, for radwaste processing,

packaging, and shipping.

H.

A summary of radioactive material and radioactive waste shipments made from the date

of the last inspection, to present

I.

Waste stream sample analysis results and resulting scaling factors for 2016 and 2017,

or the two most recent results.

J.

A listing of onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility.

ML18311A384

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: NHT

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/B

RI: DRP/B

C:DRS/OB

C:DRS/PSB2

C:DRS/EB1

C:DRS/EB2

NAME

DDodson

FThomas

VGaddy

HGepford

TFarnholtz

GWerner

SIGNATURE

DED

FDT

vgg

hjg

TRF

GEW

DATE

10/31/18

10/30/18

10/22/18

10/22/18

10/22/2018

10/22/2018

OFFICE

BC:DRP/B

NAME

NTaylor

SIGNATURE

NHT

DATE

11/7/2018