NRC Integrated Inspection Report 05000482/2018003
ML18311A384
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/07/2018
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
References
IR 2018003
Download: ML18311A384 (62)


Text

ber 7, 2018

SUBJECT:

WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2018003

Dear Mr. Heflin:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. On October 31, 2018, the NRC inspectors discussed the results of this inspection with Mr. S. Smith, Vice President Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. Additionally, NRC inspectors documented one Severity Level IV violation with no associated finding. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Wolf Creek Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Wolf Creek Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects Docket No. 50-482 License No. NPF-42 Enclosure:

Inspection Report 05000482/2018003 w/Attachments:

1. Documents Reviewed 2. Request for Information Public Radiation Safety Inspection

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 05000482 License Number: NPF-42 Report Number: 05000482/2018003 Enterprise Identifier: I-2018-003-0012 Licensee: Wolf Creek Nuclear Operating Corporation Facility: Wolf Creek Generating Station Location: Burlington, Kansas Inspection Dates: July 1 to September 30, 2018 Inspectors: D. Dodson, Senior Resident Inspector F. Thomas, Resident Inspector S. Alferink, Reactor Inspector H. Anagnostopoulos, NRC Region I, CHP, Senior Health Physicist L. Carson II, Senior Health Physicist P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist J. Kirkland, Senior Operations Engineer J. Melfi, Project Engineer J. ODonnell, CHP, Health Physicist D. Proulx, Senior Project Engineer Approved By: Nicholas H. Taylor Chief, Project Branch B Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Integrated Inspection at Wolf Creek Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations Failure to Correct Degraded Performance of a Safety-Related Tornado Damper Cornerstone Significance Cross-cutting Aspect Inspection Procedure Mitigating Green H.14 - Human 71152 -

Systems NCV 05000482/2018003-01 Performance, Problem Closed Conservative Bias Identification and Resolution The inspectors identified a Green non-cited violation of 10 CFR Part 50, Criterion XVI,

Corrective Action, for the licensees failure to promptly correct a condition adverse to quality associated with a safety-related tornado damper. Specifically, damper GTD0002 failed tests in 2012 and 2015, and following maintenance on the damper in 2017, again failed its next as-found test on February 8, 2018. As a result, this safety-related tornado dampers ability to close during a design basis tornado event was adversely impacted.

Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Cornerstone Significance Cross-cutting Aspect Inspection Procedure Not Severity Level IV Not Applicable 71152 -

Applicable NCV 05000482/2018003-02 Problem Closed Identification and Resolution The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.73(a)(2)(i)(B),

because the licensee did not provide a written licensee event report (LER) to the NRC within 60 days. Specifically, the licensee did not provide a written LER to the NRC within 60 days of identifying a condition prohibited by the plants Technical Specifications associated with inoperability of control room emergency ventilation system train B for longer than its Technical Specification allowed outage time. As a result, the NRCs ability to regulate was impacted.

PLANT STATUS

Wolf Creek Generating Station began the inspection period operating at full power. On August 16, 2018, operators reduced power to approximately 59 percent following the loss of the Wolf Creek-Rosehill offsite 345 kV line as a result of heavy offsite storms and the 345-40 switchyard circuit breaker failing to reclose. The plant was restored to approximately full power on August 18, 2018, and the plant operated at or near full power for the rest of the period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/

reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection External Flooding

The inspectors evaluated readiness to cope with external flooding on July 12, August 8, and September 11, 2018.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Safety injection train B on July 17, 2018
(2) Charging pump train B on July 24, 2018
(3) Class 1E offsite electrical circuit alignment in preparation for realigning to an alternate supply line-up to Class 1E 4160 volt alternating current bus NB01 on August 21, 2018
(4) Motor driven auxiliary feedwater train A on August 29, 2018
(5) Emergency diesel generator train B on September 19, 2018

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Control building, elevation 2,016 feet, fire areas C-13, C-14, C-15, C-16, C-18, C-19, and C-35 (Class 1E air conditioning unit rooms, safety-related battery rooms, and switchgear rooms) on July 12, 2018
(2) Control building, elevation 2,032 feet, fire areas C-21, C-23, and C-24 (lower cable spreading room and cable chases) on July 12, 2018
(3) Auxiliary building, elevation 1,974 feet, fire areas A-1 and A-4 (emergency core cooling system train B) on July 26, 2018
(4) Control building, elevation 1,984 feet, fire area C-5 (access control) on September 11, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance on August 10 and September 7, 2018.

71111.06Flood Protection Measures Cables

The inspectors evaluated cable submergence protection in essential service water electrical manhole MHE2B on July 30, 2018.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated licensed operator requalification activities in the simulator that included multiple instrument and component malfunctions and a steam generator tube rupture scenario on August 27, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated power ascension activities after a reduction in power associated with the loss of the Rosehill 345 kV line on August 17, 2018.

Operator Requalification Program (1 Sample)

The inspectors evaluated the operator requalification program from June 4 to June 7, 2018.

71111.12Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Class 1E instrument alternating current power inverter NN11 unexpectedly transferring to its bypass transformer on May 21, 2018
(2) Chemical and volume control system reactor coolant system letdown to regenerative heat exchanger valve diaphragm leak and failure to open on April 29, 2018
(3) Containment cooler train A breaker tripped while shifting to fast speed on May 9, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Planned safety-related NK24 battery charger maintenance on July 9 and July 10, 2018
(2) Unplanned component cooling water train A essential service water weld leak on July 22 and July 23, 2018
(3) Risk assessment and mitigation associated with protection of containment spray train B on July 24, 2018
(4) Risk assessment associated with unplanned station blackout diesel generator switchgear PB005 non-functionality and planned emergency diesel generator train B maintenance on August 1, 2018
(5) Risk assessment associated with extended service water pump A maintenance, abnormal switchyard alignment, and numerous lifts in the spent fuel pool building during the week of August 20, 2018
(6) Risk assessment associated with protection of fuel building equipment during lift of cask handling crane trolley assembly from elevation 2,047 feet to crane trolley rail structure on August 27, 2018
(7) Risk assessment associated with planned switchyard manipulations and extended instrument air compressor train A out-of-service time due to an unexpected breaker trip while restoring from maintenance

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Essential service water system piping U-bolt support configuration on June 13, 2018
(2) Essential service water train A to component cooling water train A heat exchanger isolation valve EFHV0051 leakby on July 23, 2018
(3) Class 1E 125 Volt direct-current busses NK01, NK02, NK03, and NK04, and switchboards and components downstream of the NK buses on July 31, 2018
(4) Boric acid storage tank train B seismic support configuration on August 6, 2018
(5) Essential service water train B pin hole leakage on the return line of control room chiller unit SGK04B on August 8, 2018

71111.18Plant Modifications

The inspectors evaluated the Class 1E heating, ventilation, and air conditioning system recirculation system permanent modification.

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Component cooling water heat exchanger train A essential service water leak repair on July 24, 2018
(2) Component cooling water pumps A and C following planned breaker and pump maintenance on August 13, 2018
(3) Charging pump train A following planned maintenance on September 18, 2018

71111.22Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) STS EN-005, Containment Spray Additive Tank Volume Verification, on July 18, 2018

In-service (2 Samples)

(1) STS EJ-100B, [Residual Heat Removal] System Inservice Pump B Test, on July 11, 2018
(2) STS BG-210, [Chemical and Volume Control System] Inservice Check Valve Test, on September 20, 2018

71114.02Alert and Notification System Testing

The inspector evaluated the maintenance and testing of the licensees alert and notification system on September 20, 2018.

71114.03Emergency Response Organization Staffing and Augmentation System

The inspector evaluated the readiness of the licensees Emergency Preparedness Organization on September 20, 2018.

71114.05Maintenance of Emergency Preparedness

The inspector evaluated the maintenance of the emergency preparedness program on September 18, 2018. The inspector observed emergency response organization training conducted on September 18 and September 19, 2018.

71114.06Drill Evaluation Emergency Planning Drill

The inspectors evaluated the emergency planning drill on August 28, 2018.

Drill/Training Evolution (1 Sample)

The inspectors evaluated simulator-based licensed operator qualification training on September 17,

RADIATION SAFETY

71124.05Radiation Monitoring Instrumentation Walk Downs and Observations

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

Calibration and Testing Program (1 Sample)

The inspectors evaluated the licensees calibration and testing program.

71124.06Radioactive Gaseous and Liquid Effluent Treatment Walk Downs and Observations

The inspectors evaluated the licensees radioactive gaseous and liquid effluent treatment systems during plant walkdowns.

Calibration and Testing Program (Process and Effluent Monitors) (1 Sample)

The inspectors evaluated the licensees gaseous and liquid effluent monitor instrument calibration and testing.

Sampling and Analyses (1 Sample)

The inspectors evaluated radioactive effluent sampling and analysis activities.

Instrumentation and Equipment (1 Sample)

The inspectors evaluated radioactive effluent instrumentation and equipment.

Dose Calculations (1 Sample)

The inspectors evaluated dose calculations.

71124.07Radiological Environmental Monitoring Program Site Inspection

The inspectors evaluated the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (1 Sample)

The inspectors evaluated the licensees groundwater monitoring program.

The inspectors identified an incomplete element of Wolf Creek Nuclear Operating Corporations implementation of the Ground Water Protection Initiative as described in NEI 07-07, Industry Ground Water Protection Initiative - Final Guidance Document, dated August 2007.

Specifically, the inspectors could not find evidence that Objective 1.2.2, Evaluate work practices that involve licensed material and for which there is a credible mechanism for the licensed material to reach ground water, had been performed as described in the initiatives acceptance criteria for that objective.

The inspectors found that:

  • The licensee hired a contractor to perform a site risk assessment in 2008. That risk assessment focused specifically on site systems, structures and components as described in objective 1.2.1. The assessment did not specifically look at work practices as required in the second objective 1.2.2.
  • Quick Hit Assessment QH-2013-0660 reviewed the sites compliance with NEI 07-07 using a comprehensive checklist of the documents requirements. The checklist combined objectives 1.2.1 and 1.2.2 together as one item. As a result, the previous failure to evaluate work practices (per objective 1.2.2) was not identified.
  • Quick Hit Assessment QH-2016-1249 again reviewed the sites compliance with NEI 07-07, but using team members from other utilities. This assessment identified that there was no documentation that lists the identified work practices that meet this criteria

[objective 1.2.2]. Condition Report 101560 was written.

  • The description provided in Condition Report 101560 adequately reflects the condition as identified in QH-2016-1249. The inspectors found, however, that the actions taken in response to the condition report focused only on updating the existing evaluation of systems, structures, and components (objective 1.2.1) and again did not address the missing evaluation of work practices as required in objective 1.2.2.

The incomplete implementation of NEI 07-07 was reviewed with licensee management on August 23, 2018. This was entered into the corrective action program by documenting the observations in Condition Reports 118440 and 126115.

71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage

The inspectors evaluated the licensees radioactive material storage.

Radioactive Waste System Walk-down (1 Sample)

The inspectors evaluated the licensees radioactive waste processing facility during plant walkdowns.

Waste Characterization and Classification (1 Sample)

The inspectors evaluated the licensees radioactive waste characterization and classification.

Shipment Preparations (1 Sample)

The inspectors evaluated the licensees radioactive material shipment preparation processes.

Shipment Records (1 Sample)

The inspectors evaluated the licensees non-excepted package shipment records.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS06: Emergency AC Power Systems (07/01/2017 - 06/30/2018)
(2) MS07: High Pressure Injection Systems (07/01/2017 - 06/30/2018)
(3) MS10: Cooling Water Support Systems (07/01/2017 - 06/30/2018)
(4) EP01: Drill/Exercise Performance Sample (10/1/2017 - 06/30/2018)
(5) EP02: Emergency Response Organization Drill Participation Sample (10/1/2017 -

06/30/2018)

(6) EP03: Alert And Notification System Reliability Sample (10/1/2017 - 06/30/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to an unplanned auxiliary feedwater train actuation on May 12,

INSPECTION RESULTS

Failure to Correct Degraded Performance of a Safety-Related Tornado Damper Cornerstone Severity Cross-cutting Aspect Inspection Procedure Mitigating Systems Green H.14 - Human

71152 - Problem NCV Performance,

Identification and 05000482/2018003-01 Conservative Bias Resolution Closed The inspectors identified a Green non-cited violation of 10 CFR Part 50, Criterion XVI, Corrective Action, for the licensees failure to promptly correct a condition adverse to quality associated with a safety-related tornado damper. Specifically, damper GTD0002 failed tests in 2012 and 2015, and following maintenance on the damper in 2017, again failed its next as-found test on February 8, 2018. As a result, this safety-related tornado dampers ability to close during a design basis tornado event was adversely impacted.

Description:

In December 2012 the licensee identified in Condition Report 61246 that during preventive maintenance and testing, the GTD0002 tornado damper exceeded its acceptance criteria for breakaway torque. Specifically, the as-found torque was 320 ft-lbs, which exceeded the acceptance criteria of 299 ft-lbs or less. The licensee implemented Work Order 12-355727-011, cycled the damper six times, and each time the damper break away torque was noted as between or equal to 280 to 290 ft-lbs. This failure was determined to be a result of lack of cycling leading to a non-uniform lubrication profile. No additional action was taken.

In January 2015, the licensee identified in Condition Report 90975 that during preventive maintenance and testing the GTD0002 damper was rubbing and exceeded its acceptance criteria for breakaway torque (as found break away torque was 380 ft-lbs as compared to the acceptance criteria of 299 ft-lbs or less). A contingency work order was implemented and actions were taken to reduce the rubbing that was identified. Rubbing was still noted following the corrective maintenance, but the as-left break away torque was found to be within acceptable ranges and the damper was described as cycling relatively smooth. The licensee performed a basic cause evaluation and determined that the probable cause was inadequate clearances between the damper blades and the associated ductwork during initial installation resulting in a rubbing or binding condition of the damper. A planned action included performing Work Order 15-397077-000.

On January 11, 2017, the licensee performed Work Order 15-397077-000 to adjust the ductwork at the GTD0002 damper. Bolting between the damper framework and the ductwork was loosened and the vertical duct face was mechanically adjusted. Work Order 15-397077-000 noted the as found condition of the two middle blades stating that they rub hard. Condition Report 110377 also noted that five of nine damper blades still exhibited rubbing as the ductwork relaxed. Work Order 15-397077-000 also noted that the damper passed its as-left break away torque test at 291 ft-lbs. Though, the work order pointed out, Damper blade still rubbing after adjustment. An email from maintenance personnel (attached to the work order) described the condition of the damper following maintenance.

The email stated, I was able to cycle the damper much easier than before but when we put the to[r]que wrench on it we were getting it to move at [approximately] 330 [ft-lbs].

We tried several times and we were all eyeballing it but each time it seemed it would just barely start to creep at around 290 [ft-lbs] but nothing very noticeable until 320-330 [ft-lbs].

Engineering personnel were contacted and the condition was accepted based on Slight movement at 290 [ft-lbs] during three subsequent attempts.

On February 8, 2018, while performing planned testing and maintenance on normally open safety-related tornado damper GTD0002 in accordance with Work Order 17-428518-000, the first stroke breakaway torque failed to meet the acceptance criteria of less than or equal to 299 foot-lbs. Condition Report 119330 noted the damper did not break away until applied torque had reached 325 foot-lbs and the damper seemed to be binding up the first quarter of the rotation.

Section 9.4.3.2.2, Component Description, of the Updated Final Safety Analysis Report describes the function of the normally open GTD0002 damper. It states, Tornado dampers are employed where isolation from the effects of extreme wind or tornado conditions is required. These dampers close with the flow produced by the differential pressure associated with tornadoes or high winds. Otherwise, the safety-related damper must be open to allow flow for the emergency exhaust system to vent through the unit stack.

Section 9.4.3.1.1, Safety Design Bases, of Section 9.4.3, Auxiliary Building, of the Updated Final Safety Analysis Report describes the design basis for this damper:

The emergency exhaust system, and those portions of the auxiliary buildingand the auxiliary/fuel building normal exhaustwhich are required to provide isolation of the auxiliary building are safety-related and are required to function following a [design basis accident] and to achieve and maintain the plant in a postaccident safe shutdown conditionThe emergency exhaust system, and the auxiliary building isolation provisions are protected from the effects of natural phenomena, such as earthquakes, tornadoes, hurricanes, floods, and external missiles (GDC-2).

The inspectors noted that both trains of the safety-related emergency exhaust system could be prevented from performing their safety-related functions if the damper did not close as designed during a design basis tornado. Specifically, the negative pressure created by a tornado could result in the collapse of the unit vent exhaust plenum, which is the exhaust flowpath for the emergency exhaust system.

Corrective Actions: On February 8, 2018, Work Order 17-421482-000 was performed to remove a small amount of the GTD0002 damper blade material at the edge of the damper blades to eliminate rubbing. The licensee also created long-term action 18-0008 to provide a permanent resolution for the rubbing issues that have contributed to the numerous failures of the breakaway torque testing.

Corrective Action References: Condition Reports 119330 and 127690.

Performance Assessment:

Performance Deficiency: The failure to promptly correct a condition adverse to quality associated with safety-related tornado damper GTD0002 was a performance deficiency.

Screening: The performance deficiency is more than minor, and therefore a finding, because it is associated with the structure, system and component, and barrier performance attribute of the Barrier Integrity Cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Specifically, the auxiliary building boundary and the emergency exhaust systems ability to exhaust potentially contaminated air from the emergency core cooling system could be adversely impacted by the GTD0002 dampers inability to meet breakaway torque requirements.

Significance: The inspectors assessed the significance of the finding using Exhibit 3, Barrier Integrity Screening Questions, of Inspection Manual Chapter 0609, Appendix A, Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined this finding does not only represent a degradation of the radiological barrier function provided for the control room, or auxiliary building, or spent fuel pool, and the finding does not represent a degradation of the barrier function of the control room against smoke or a toxic atmosphere. Therefore, the inspectors determined the finding was of very low safety significance (Green).

Cross-cutting Aspect: The inspectors determined that the finding has a human performance cross-cutting aspect in the area of conservative bias in that individuals did not use decision making-practices that emphasize prudent choices over those that are simply allowable.

Specifically, individuals rationalized assumptions for the sake of completing a task when the rubbing condition was accepted with slight movement of the damper at the acceptance criteria, rather than pursuing resolution of the known degraded condition of the damper blades. As a result, when the damper was next tested, it failed at the same unsatisfactory torque value as that observed in January 2017.

Enforcement:

Violation: Title 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, are promptly corrected.

Contrary to the above, until February 8, 2018, measures were not established to assure that conditions adverse to quality, such as failures, were promptly corrected. Specifically, actions taken to correct the degraded condition of safety-related tornado damper GTD0002 were inadequate to ensure it could perform its safety function from January 2017 through February 2018. As a result, the damper failed testing again in 2018.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Cornerstone Severity Cross-cutting Aspect Inspection Procedure Not Applicable Severity Level IV Not Applicable

71152 - Problem NCV

Identification and 05000482/2018003-02 Resolution Closed The inspectors identified a Severity Level IV non-cited violation of 10 CFR 50.73(a)(2)(i)(B),because the licensee did not provide a written licensee event report (LER) to the NRC within 60 days. Specifically, the licensee did not provide a written LER to the NRC within 60 days of identifying a condition prohibited by the plants Technical Specifications associated with inoperability of control room emergency ventilation system train B for longer than its Technical Specification allowed outage time. As a result, the NRCs ability to regulate was impacted.

Description:

On March 5, 2018, the licensee performed Procedure STS PE-004, Aux Building and Control Room Pressure Test, Revision 16, and the B train control room emergency ventilation systems ability to pressurize the control room envelope and maintain pressure greater than or equal to 0.25 inches water gauge failed. Later tests on March 5, 2018, which maintained control of control building doors, had results that varied between 0.18 and 0.26 inches water gauge, with an average of 0.2258 inches water gauge.

Troubleshooting was performed and, on March 6, 2018, an interim configuration associated with Design Change Package 14269, SGK05 Tech Spec Addition and Compensatory Modifications, was found to be impacting readings. Specifically, between September 17, 2017, and January 17, 2018, four openings, approximately 2 foot by 2 foot, were cut in the floor/ceiling between the 2,032 foot and 2,016 foot elevations of the control building to support ongoing ductwork installation. On January 17, 2018, after penetrations for the modification were completed, compensatory measures consisting of steel plates covering the four floor openings were in place until ductwork installation began on February 19, 2018. Beginning on February 19, 2018, the penetrations remained open during ductwork and damper installation until March 6, 2018, when the ductwork and damper installation was completed.

Following numerous actions to restore margin to the ability to pressurize the control room envelope, surveillance testing was performed for the B and A trains of the control room emergency ventilation system on March 15, 2018, and the control room envelope was pressurized to 0.3448 and 0.3695 inches water gauge, respectively. Additional information on this issue is described in NCV 05000482/2018002-02, Failure to Maintain Adequate Pressurization of the Control Room Envelope, (ADAMS ML18226A175).

The licensees cause evaluation determined that the probable causes of the issue were inadequate identification of control building ventilation isolation boundaries in WCRE-35, Boundary Matrix, and control of conditions during STS PE-004. Relative to the interim configuration in which the ducting was found on March 6, 2018, the licensees cause evaluation stated, When the ducting was fully installed and the control room pressure tested in the same configuration, an increase of 0.04 to 0.07 [inches water gauge] was noted initially. Enough to pass acceptance criteria and close to the pressures last noted during performance of STS PE-004 in 2016. The readings were taken immediately following the closure of the main control room door and while the total average over that period was 0.2641 [inches water gauge], the last 5 minutes of readings averaged 0.2935 [inches water gauge]. This would seem to indicate that the control room pressure was still stabilizing and that the pressure was similar to those found during past differential pressure tests.

When the surveillance was ran the following week it did not pass but conditions under which the surveillance were ran differed in both timing and alignment which may have contributed to the lower than expected pressure.

In addition to the licensees conclusions regarding the interim configurations impact on the control room emergency ventilation system, the licensees evaluation noted, A number of factors were found to be consequential to control room pressure during the event under evaluation. Direct comparison between all the pressures found is complicated by the numerous varying factors between each of the tests. However, based on the test results the probable cause of the initial failure is related to the penetration between the 2032 and 2016 elevations of the Control Building.

Considering successful informational testing on March 6, 2018, after ductwork and dampers were installed, considering additional information provided in the licensees cause evaluation, and considering reportability subject matter expert input the inspectors determined that train B of the control room emergency ventilation system was inoperable between February 19, 2018, and March 16, 2018, when the system was returned to operable.

Corrective Actions: In response to the inspectors questions the licensee initiated Condition Report 127691.

Corrective Action References: Condition Report 127691.

Performance Assessment:

The inspectors determined this violation was associated with a minor performance deficiency.

Enforcement:

The Reactor Oversight Processs significance determination process does not specifically consider the regulatory process impact in its assessment of licensee performance.

Therefore, it is necessary to address this violation which impedes the NRCs ability to regulate using traditional enforcement to adequately deter non-compliance.

Severity: The inspectors determined that the failure to provide a written LER within 60 days was a performance deficiency that was reasonably within the licensees ability to foresee and correct, and should have been prevented. This violation involved not making a required report to the NRC and is considered to impact the regulatory process. Such violations are dispositioned using the traditional enforcement process instead of the Significance Determination Process. Using the Enforcement Policy, Section 6.9, Inaccurate and Incomplete Information or Failure to Make a Required Report, example (d)(9), which states, A licensee fails to make a report required by 10 CFR 50.72 or 10 CFR 50.73, the NRC determined this violation is more than minor and is categorized as a Severity Level IV violation (very low safety significance).

Violation: Title 10 CFR 50.73(a) requires, in part, that licensees submit an LER for any event of the type described in the paragraph within 60 days after the discovery of the event.

Title 10 CFR 50.73(a)(2)(i)(B) requires, in part, that any operation or condition which was prohibited by the plants Technical Specifications be reported in an LER.

Contrary to the above, on May 4, 2018, an operation or condition which was prohibited by the plants Technical Specifications was not reported in an LER. Specifically, Technical Specification 3.7.10, Control Room Emergency Ventilation System (CREVS), requires, in part, immediate initiation of action to implement mitigating actions when one or more control room emergency ventilation system trains is inoperable due to an inoperable control room envelope boundary or control building envelope boundary in MODES 1, 2, 3, or 4, or the unit must be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Neither immediate initiation of action to implement mitigating actions was implemented, nor the unit placed in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36, and the condition prohibited by the plants Technical Specifications was not later reported in an LER.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

On August 16, 2018, the inspector presented the licensed operator requalification inspection results to Ms. J. Yunk, Training Manager, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented for this inspection period.

On August 23, 2018, the inspectors presented the baseline radiation protection inspection results to Mr. T. Fugate, Director, Plant Support, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

On September 21, 2018, the inspector presented the results of the onsite inspection of the emergency preparedness program to Mr. M. Boyce, Director, Engineering Projects, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

On October 31, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. S. Smith, Vice President, Engineering, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.01Adverse Weather Protection

Procedures

Number Title Revision

OFN SG-048 Flash Flood Warning 6

STS PE-049E Train A Essential Service Water System in Vaults Pressure 1

Test

Drawings

Number Title Revision

10466-A-1330 Access Control Floor Plan, El. 1984-0 5

C-1C3902 Control Building Area 1 Concrete Neat Lines and 7

Reinforcing Wall Elevations Sheet 2

C-K201 E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan, 10

Sections and Schedules Sht. 1

C-K201 E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan, 12

Sections and Schedules Sht. 1

C-K202 E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan, 10

Sections and Schedules Sht. 2

C-K202 E.S.

W.S. Yard Pipelines and Elect. Duct Banks Plan, 11

Sections and Schedules Sht. 2

C-K208 E.S.

W.S. Yard Pipeline Valve House Plans, Sections, and 5

Details Sht. 1

C-K208 E.S.

W.S. Yard Pipeline Valve House Plans, Sections, and 8

Details Sht. 1

Condition Reports

21699 124381 124382 124383 124397

24409 124988 125177 125196 125197

26267 126345

Miscellaneous Documents

Number Title Revision

014592 Field Change Notice - Change Package Title: ESW Below 2

Ground Plant Tie-In Approval and Component Abandonment

Miscellaneous Documents

Number Title Revision

014592 Field Change Notice - Change Package Title: ESW Below 3

Ground Plant Tie-In Approval and Component Abandonment

10466-C107-1 Bechtel: Technical Specification for Purchase of Waterstops 1

and Expansion Joint Filler for the Standardized Nuclear Unit

Power Plant System (Snupps); Job No. 10466

APF 05-002-05 Engineering Disposition: ESW Below Ground Plant Tie-In 0

Approval and Component Abandonment - Package

  1. 014592

APF 05-002-05 Engineering Disposition: ESW Below Ground Plant Tie-In 1

Approval and Component Abandonment - Package

  1. 014592

APF 05-007-01 Safety Classification Analysis - Change Package #013503 1

71111.04Equipment Alignment

Procedures

Number Title Revision

AI 15C-006 Management Oversight Requirements for Infrequently 22

Performed and Potentially Degrading Evolutions

AP 21G-001 Control of Locked Component Status 73

AP 26C-004 Operability Determination and Functionality Assessment 32

CKL AL-120 Auxiliary Feedwater Normal Lineup 42

CKL BG-120 Chemical and Volume Control System Normal Valve Lineup 41

CKL BG-130 Chemical and Volume Control System Switch and Breaker 31A

Lineup

CKL EM-120 Safety Injection System Lineup Checklists 32

CKL KJ-121 Diesel Generator NE01 and NE02 Valve Checklist 40B

MGM MOOP-01 Relief Valve Bench Testing 25

STS IC 645A Slave Relay Test K645 Train A Containment Spray 17

SYS NB-200 Transferring XNB01 Supply Between SL7 and #7 19

Transformer

SYS NP-201 Transferring NB01 Power Sources 61

Drawings

Number Title Revision

E-1001 Single Line Diagram Site Area Loads 37

E-11001 Main Single Line Diagram 11

E-11005 List of Loads Supplied by Emergency Diesel Generator 52

E-11010 DC Main Single Line Diagram 11

E-11010A DC Main Single Line Diagram (PK03 and PK04 BUS) 5

E-12KJ01 Standby Generation Engine and Governor Control Logic 6

Diagram

E-12NE01 Standby Generation Excitation Control Logic Diagram 3

E-12NE02 Logic Diagram Standby Gen. System Protection 6

E-K1001 Single Line Diagram Essential Service Water System 3

KD-7496 One Line Diagram 63

KD-7496 One Line Diagram 67

KD-7750 Wolf Creek Substation General Plan 13

M-12AL01 Piping & Instrumentation Diagram Auxiliary Feedwater 28

System

M-12AP01 Piping & Instrumentation Diagram Condensate Storage and 21

Transfer System

M-12BG03 Piping and Instrumentation Diagram Chemical & Volume 48

Control System

M-12EJ01 Piping and Instrumentation Diagram Residual Heat 52

Removal System

M-12EM01 Piping & Instrumentation Diagram High Pressure Coolant 42

Injection System

M-12EM01 Piping & Instrumentation Diagram High Pressure Coolant 45

Injection System

M-12EM02 Piping & Instrumentation Diagram High Pressure Coolant 23

Injection System

M-12EM03 Piping & Instrumentation Diagram High Pressure Coolant 4

Injection System Test Line

M-12KJ04 Piping & Instrumentation Diagram, Standby Diesel 18

Generator B, Cooling Water System

M-12KJ05 Piping & Instrumentation Diagram, Standby Diesel 17

Generator B, Intake Exhaust, F.O. & Start Air Sys.

Drawings

Number Title Revision

M-12KJ06 Piping & Instrumentation Diagram, Standby Diesel 22

Generator B, Lube Oil System

M-724-00323 Crosby Valve & Gage Co. Drawing DS-C-60705, Titled - W05

Nozzle Type Relief Valve

Condition Reports

25096 125097 125253

Miscellaneous Documents

Number Title Revision/Date

0303 Westar Energy, Inc. - Transmission Operating Directive August 17,

2018

APF 21C-001-01 Wolf Creek Substation Work Authorization: 2018-026, August 20,

SY124 Cable PMT 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment: August 20 to

Schedule Week 2018-308 26, 2018

M-724-00811 Installation, Operation and Maintenance Instructions for W01

Anderson Greenwood Crosby Style Pressure Relief Valves

71111.05AQFire Protection Annual/Quarterly

Procedures

Number Title Revision

AP 10-105 Fire Protection Training and Drills 22

AP 10-105 Fire Protection Training and Drills 23

AP 10-106 Fire Preplans 18A

AP 10-107 Fire Event Investigation and Reporting 5

OFN KC-016 Fire Response 47

Condition Reports

25027 125028 125752 126417 126418

26419 126517 126518 126527 126528

26529 126530

Work Orders

17-428938-000

Miscellaneous Documents

Number Title Revision/Date

APF 06-002-01 Emergency Action Levels 17B

APF 10-105-02 Fire Drill Scenario and Critique Report: Time - 0800 August 10,

2018

APF 10-105-02 Fire Drill Scenario and Critique Report: Time - 0800 September 7,

2018

APF 10-105-02 Fire Drill Scenario and Critique Report: Time - 1300 September 7,

2018

APF 10-105-04 Fire Brigade Meeting Agenda September 7,

2018

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC September 7,

SRO/RO/BOP Review: Day Shift 2018

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC September 7,

SRO/RO/BOP Review: Night Shift 2018

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC September 8,

SRO/RO/BOP Review: Night Shift 2018

APF 30E-003-02 Training Attendance September 10,

2018

E1F9905 Fire Hazard Analysis 8

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification 14

FL1224000 Fire Brigade Leader/Incident Commander 8

No. 18 Coffey County Emergency Management Office Contingency 14

Plan Implementing Procedure

OBSR 2018- Observation Card: Fire Protection - Fire Brigade Drill August 10,

27 2018

XX-X-004 Combustible Fire Loading For Each Room in the Various 4

Fire Areas at WCNOC

71111.06Flood Protection Measures

Drawings

Number Title Revision

C-K202 E.S.

W.S. Yard Pipelines and Electrical Duct Banks Plan, 11

Sections and Schedules Sht.-2

Drawings

Number Title Revision

C-K209 E.S.W.S. Electrical Manholes Plans Sections and Details 9

C-K210 ESWS Yard Pipelines and Elect. Duct Banks Sections and 9

Details

C-K212 E.S.W.S. Yard Pipelines and Elec. Duct Banks Plan and 3

Sections

C-K212 E.S.W.S. Yard Pipelines and Elec. Duct Banks Plan and 4

Sections

E-KR0231 Raceway Plot Plan Essential Service Water System Plan 9

and Sections

E-KR0231 Raceway Plot Plan Essential Service Water System Plan 10

and Sections

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Procedures

Number Title Revision

AI 21-016 Operator Time Critical Actions Validation 7

AI 30B-005 Conduct of Simulator Activities for Licensed Operator 30

Training

AI 30B-15 Licensed Operator Requalification Exam Guidelines 12

AI 30C-001 Continued Assurance of Simulator Fidelity 17

AI 30C-004 Simulator Real Time Capacity Testing 5B

AI 30C-005 Simulator Steady State Testing 9A

AI 30C-006 Simulator Transient Testing 11

AI 30C-007 Simulator Core Testing 3

AI 30C-008 Scenario Based Testing 2A

AI 30E-13 Written and Oral Examinations 26A

AI 30E-15 Just in Time Training 13

AI 30E-23 Remediation 3

AP 30B-001 Licensed Operator Requalification Training Program 29

GEN 00-004 Power Operation 91

STS SE-001 Power Range Adjustment to Calorimetric 36

SYS MA-200 Placing the Switchyard in a Ring Bus Configuration 14

Drawings

Number Title Revision

KD-7496 One Line Diagram 67

Condition Reports

105145 105841 112616 114281 115643

116660 117338 117340 117341 117414

117619 120012 120582 123951

Miscellaneous Documents

Number Title Revision/Date

Rose Hill Line Return to 100% August 17,

2018

AIF 30B-15-07 Ops Requal Walk-through Exam Prep Checklist 1

AIF 30B-15-08 Simulator Examination Preparation Checklist 1

AIF 30B-15-09 Simulator Security Checklist 8

AIF 30B-15-15 Sequestering Checklist 1

AIF 30B-15-18 Simulator Setup Checklist 1

AIF 30B-15-19 JPM Exam Simulator Setup Checklist 1

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC August 16,

SRO/RO/BOP Review: Day Shift 2018

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC August 16,

SRO/RO/BOP Review: Night Shift 2018

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC August 17,

SRO/RO/BOP Review: Night Shift 2018

APF 29B-003-01 Surveillance Test Routing Sheet: STS SE-001 Completed

August 17,

2018

JPMs 2018 Exam -Week 2 June 2018

Remediation February 2017 February 2017

Plan

Remediation February 2018 February 2018

Plan

Remediation January 2017 January 2017

Plan

Miscellaneous Documents

Number Title Revision/Date

Remediation March 2018 March 2018

Plan

Remediation September 2016 September

Plan 2016

Scenario 16-06 Requalification Exam 2

Scenarios 2018 Exam - Week 2 June 2018

Simulator Test ATWS with a Faulted Steam Generator May 10, 2017

Simulator Test Steam Generator Fault Inside Containment May 24, 2017

Simulator Test Steam Generator Fault Outside Containment May 18, 2017

SMP A11-095 Alarm Sounds are Different than in the Plant May 31, 2011

SMP A16-041 Accumulator Reliefs Will Not Open or Leak By August 24,

2016

SMP A16-047 Turbine Trip on Loss of Condensate Pump B July 27, 2016

SMP A16-068 A Change in CCW Temp Does not Change RCP Bearing November 15,

Temps 2016

SMP A17-102 Ventilation Fans Wont Stop/Start July 20, 2017

SMP A17-114 MFP Speed Impacted by Change in RCS Pressure April 10, 2018

SMP A17-160 Taking DRPI Switch to Half Accuracy Cleared DRPI Short December 4,

2017

71111.12Maintenance Effectiveness

Procedures

Number Title Revision

AI 22C-010 Operations Work Controls 1

AI 22C-013 Protected Equipment Program 21

AP 22C-003 On-Line nuclear Safety and Generation Risk Assessment 22

AP 22C-007 Risk Management Contingency Planning 11

AP 22C-008 Qualitative Risk Management 4B

SYS NN-200A Transferring NN01 and NN03 Buses Between Power 1

Sources

Drawings

Number Title Revision

M-12BG01 Piping & Instrumentation Diagram, Chemical and Volume 19

Control System

Condition Reports

21823 122610 122858 123047 123103

25743

Work Orders

17-426767-000

Miscellaneous Documents

Number Title Revision/Date

Evidence and Action Matrix: CR 122858/SWO 18-439146- May 3, 2018

000/001

Functional Failure Evaluation - CR 94075 Review Date

April 24, 2015

Functional Failure Evaluation for GN - CR 89850 Review Date

December 8,

2014

Functional Failure Evaluation for GN - CR 91851 Review Date

March 21,

2015

Functional Failure Evaluation for GN - CR 94058 Review Date

April 21, 2015

Functional Failure Evaluation for GN - CR 95765 Review Date

May 3, 2015

Functional Failure Evaluation for GN - CR 95845 Review Date

May 4, 2015

Functional Failure Evaluation for GN - CR 110725 Review Date

August 22,

2017

Functional Failure Evaluation for GN - CR 11072508 Review Date

July 20, 2017

Functional Failure Evaluation for GN - CR 117126 Review Date

November 22,

2017

Miscellaneous Documents

Number Title Revision/Date

Functional Failure Evaluation for GN - CR 123103 Review Date

June 7, 2018

Functional Failure Evaluation for GN - CR 123272 Review Date

May 23, 2018

System Health Report - Containment Cooling - System January 1 -

GN June 30, 2017

System Health Report - Containment Cooling - System July 1 -

GN December 31,

2017

System Health Report - Containment Cooling - System January 1 -

GN June 30, 2018

System Health Report - Instrument AC Power - System January 1 -

NN June 30, 2017

System Health Report - Instrument AC Power - System July 1 -

NN December 31,

2017

System Health Report - Instrument AC Power - System January 1 -

NN June 30, 2018

APF 15C-002-01 Procedure Cover Sheet: Transferring NN01 and NN03 1

Buses Between Power Sources

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance May 21, 2018

to Criteria and Goals: System NN

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-01 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-02 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-03 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-04 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-05 September 18,

2018

Miscellaneous Documents

Number Title Revision/Date

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-06 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-07 September 18,

2018

GN Maintenance Rule Final Scope Evaluation: Containment Printed

Cooling System - GN-08 September 18,

2018

NN Maintenance Rule Final Scope Evaluation: Instrument AC Printed

Power System - 120V (Class IE Power System) - NN01 August 15,

2018

NN Maintenance Rule Final Scope Evaluation: Instrument AC Printed

Power System - 120V (Class IE Power System) - NN02 August 15,

2018

71111.13Maintenance Risk Assessments and Emergent Work Control

Procedures

Number Title Revision

AI 15C-006 Management Oversight Requirements for Infrequently 22

Performed and Potentially Degrading Evolutions

CWD-1 Welding Program Manual 14

SYS NB-200 Transferring XNB01 Supply Between SL7 and #7 19

Transformer

SYS NB-200 Transferring XNB01 Supply Between SL7 and #7 20

Transformer

Drawings

Number Title Revision

C-1C6311 Fuel Building Conc. Neat Line & Reinforcing Plan Floor 2

El. 2,047-6

KD-7496 One Line Diagram 67

M-618.4-00010

M-12EF01 Piping & Instrumentation Diagram Essential SVC Water 29

System

Drawings

Number Title Revision

M-12EF02 Piping & Instrumentation Diagram Essential SVC Water 42

System

M-12EG01 Piping & Instrumentation Diagram Component Cooling 24

Water System

M-12EG02 Piping & Instrumentation Diagram Component Cooling 27

Water System

M12EG03 Piping & Instrumentation Diagram Component Cooling 19

Water System

M-12EM02 Piping & Instrumentation Diagram High Pressure Coolant 23

Injection System

M-K2EF01 Piping & Instrumentation Diagram Essential Service Water 70

System

M-K2EF03 Piping & Instrumentation Diagram Essential Service Water 19

System

Condition Reports

25201 125205 125224 125239 125245

25249 125250 125251 125252 125280

25372 125563 125637 125638 125716

Work Orders

16-414781-223 16-414781-304 18-441467-000 18-441467-003 18-441467-005

18-441467-008

Miscellaneous Documents

Number Title Date

303 Westar Energy, Inc. - Transmission Operating Directive August 17, 2018

2987 Performance Improvement Request October 2, 1998

APF 05C-004-01 WCNOC - Basic Engineering Disposition - SWO June 25, 2018

16-4162460926 - Evaluation of Fuel Building for Loads

From Installation of the Cask Handling Crane (HKE14 -

Change Package 15044)

APF 05C-004-01 WCNOC - Basic Engineering Disposition - Cask August 28, 2018

Handling Crane Modification: SARENs Heavy Lift Unit

(HLU)

APF 10-104-06 Boundary Watch Duties: Door #11274 July 22, 2018

Miscellaneous Documents

Number Title Date

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC August 24, 2018

SRO/RO/BOP Review - Day Shift

APF 21-001-02 Control Room Turnover Checklist - On-Coming CRS/WC August 25, 2018

SRO/RO/BOP Review - Night Shift

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk July 30 to

Assessment: 2018-0305 August 5, 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk August 20 to

Assessment: 2018-0308 August 26, 2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment August 27 to

2018-0309 September 2,

2018

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk September 24 to

Assessment: 2018-0313 September 30,

2018

APF 28A-001-01 Performance Improvement Request PIR 982987

71111.15Operability Determinations and Functionality Assessments

Procedures

Number Title Revision

AP 21I-001 Temporary Configuration Changes 15

AP 26C-004 Operability Determination and Functionality Assessment 35

CNT-MM-303 Temporary Support Guidelines 3

CWD-1 Welding Program Manual 14

Drawings

Number Title Revision

M-12BG05 Piping & Instrumentation Diagram Chemical and Volume 24

Control System

M-12EF01 Piping & Instrumentation Diagram Essential SVC Water 29

System

M-12EF02 Piping & Instrumentation Diagram Essential SVC Water 42

System

M-12EF06 Piping Isometric Essential Service Water Sys. [System] Aux. 23

[Auxiliary] Bldg. [Building] A & B Train Supply & Return

Drawings

Number Title Revision

M-12EG01 Piping & Instrumentation Diagram Component Cooling 24

Water System

M-12EG02 Piping & Instrumentation Diagram Component Cooling 27

Water System

M-12EG03 Piping & Instrumentation Diagram Component Cooling 19

Water System

M18BG35A(Q) Hanger Details Small Pipes Misc. and Boric Acid Storage 2

Tanks Vents - Auxiliary Building

M-19BG35(Q) Hanger Location Drawing Small Pipe Misc. and Boric Acid 5

Storage Tanks Vents-Auxiliary Building

M-K2EF01 Piping & Instrumentation Diagram Essential Service Water 70

System

M-K2EF03 Piping & Instrumentation Diagram Essential Service Water 19

System

Condition Reports

23902 123903 123905 123906 123907

23908 124948 125201 125205 125224

25243 125361 125374 125468 125487

25552 125560 125561 125638 125641

25716

Work Orders

18-439119-000 18-440015-000 18-441039-002 18-441039-003 18-441467-000

18-441467-003 18-441467-005 18-441467-008

Miscellaneous Documents

Number Title Revision/Date

AIF 28A-100-12 Wolf Creek Generating Station - Basic Cause Evaluation: September 8,

BGLT0106 Temporary Support Usage 2018

APF 05C-004-01 Basic Engineering Disposition - Evaluation of the Use of a 0

Temporary Pipe Support for Replacement of BGLT0106,

Boric Acid Tank B Level Transmitter

APF 10-104-06 Boundary Watch Duties: Door #11274 July 22, 2018

Miscellaneous Documents

Number Title Revision/Date

CNTF-MM-300-01 Quality Inspection Checklist - Pipe Support: BG35- 3

C527/112 (Q)

CNTF-MM-300-02 Section I Generic Inspection Item Instructions 3

CNTF-MM-300-07 Section VI - Small Bore/MS 25W Supports - Pipe 2

Support: BG35-C257/112 (Q)

CNTF-MM-303-01 Temporary Supports - Pipe Support: BG35-C527/112 (Q) 1

DG-C-002 Wolf Creek Nuclear Operating Corporation - Design 1

Guide: Evaluation Criteria for Temporary Acceptance of

Flaws in Moderate Energy Class 2 or 3 Piping

NK-E-001 125 VDC [Volt Direct Current] Class 1E Battery System 4

Sizing, Voltage Drop and Short Circuit Studies

OE EF-18-003 Operability Evaluation 0

OE NK-18-005 Operability Evaluation 0

WCRE-34 Fourth 10-Year Interval Inservice Testing Basis Document 9

71111.18Plant Modifications

Work Orders

16-414781-160 16-414781-223 16-414781-351

Miscellaneous Documents

Number Title Revision

DCP 14269 50.59 Evaluation TMP 18-001 0

DCP 14269 Configuration Summary 1

DCP 14269 Design Input Data Sheet 0

DCP 14269 Design Verification Report, SGK05 Permanent 0

Compensatory Modifications

DCP 14269 Engineering Screening, SGK05 Permanent Compensatory 0

Modifications

DCP 14269 Post Modification Testing Plan 0

71111.19Post Maintenance Testing

Procedures

Number Title Revision

QCP-20-540 VT-1 Visual Examination 1

STS BG-100A Centrifugal Charging System A Train Inservice Pump Test 48

STS EG-100A Component Cooling Water Pumps A/C Inservice Pump Test 33A

SYS EG-120 Component Cooling Water System 41

Drawings

Number Title Revision

M-12EG01 Piping & Instrumentation Diagram Component Cooling 24

Water System

Condition Reports

26021 126025 126036 126037 126038

26039 126040 126041 126734

Work Orders

18-441467-000 18-441467-003

Miscellaneous Documents

Number Title Revision/Date

18-025 Section XI Program Final Work Order Completion Review July 31, 2018

Signature Sheet: Work Order Number 18-441467-003

APF 15C-002-01 Procedure Cover Sheet - Component Cooling Water 41

System

APF 16A-003-01 ASME Section XI Repair/Replacement Plan Wolf Creek July 22, 2018

Generating Station - Plan No. 2018-025

APF 22C-008-01 Qualitative Risk Screening July 22, 2018

APF 29B-003-01 Surveillance Test Routing Sheet - Component Cooling August 13,

Water Pumps A/C Inservice Pump Test 2018

APF 29B-003-01 Surveillance Test Routing Sheet - STS BG-100A Completed

September 18,

2018

Miscellaneous Documents

Number Title Revision/Date

ET 18-0026 Docket No. 50-482: Supplement to Letter Dated July 23, August 28,

2018, Inservice Inspection Program Relief Request From 2018

the Requirements of American Society of Mechanical

Engineers (ASME) Code Case N-666-1, Weld Overlay of

Class 1, 2, and 3 Socket Welded Connections,Section XI,

Division 1

71111.22Surveillance Testing

Procedures

Number Title Revision

STS BG-210 CVCS Inservice Check Valve Test 35

STS CH-019 Containment Spray Additive Tank NAOH Concentration 7A

STS EJ-100B RHR System Inservice Pump A Test 55

STS EN-005 Containment Spray Additive Tank Volume Verification 3

STS IC-459 Channel Calibration Spray Additive Tank Level Loop 6C

ENLP0015

Drawings

Number Title Revision

10466-J-110- Instrument Loop Diagram - Containment Spray System 0

149-W08 Spray Additive Tank Full Range Level (Train A)

M-105B-0005 A6 ODX13Y-8 LG Contain Spray Additive Tank 11

M-105B-00018 Details-Containment Spray Additive Tank 4

Condition Reports

24979 125017 126396

Miscellaneous Documents

Number Title Revision/Date

APF 05-002-05 Engineering Disposition: Use of EN-LG-22 for Tech Spec 0

Surveillance

APF 28A-001-01 Performance Improvement Request: PIR 2006-0425 Initiated

February 19,

2006

Miscellaneous Documents

Number Title Revision/Date

APF 29B-003-01 Surveillance Test Routing Sheet - STS BG-210 Completed

September 20,

2018

APF 29B-003-01 Surveillance Test Routing Sheet - STS CH-019 Completed

July 18, 2018

APF 29B-003-01 Surveillance Test Routing Sheet - STS EN-005 Completed

July 18, 2018

APF 05-002-05 Engineering Disposition: PIR 2000-0394 - Use of EN-LG-22 0

for Tech Spec Surveillance

APF 05-004-01 Design Specification for Shop Fabricated Tanks (ASME III): 15

M-105B

LER 2000-001-00 Surveillance Method Results in Low NaOH Level in the March 13,

Spray Additive Tank 2000

STS CH-019 Containment Spray Additive Tank NAOH Concentration Completed

July 18, 2018

STS EN-005 Containment Spray Additive Tank Volume Verification Completed

July 18, 2018

71114.02 - Alert and Notification System Testing

Procedures

Number Title Revision

EPP 06-019 Alert and Notification System Sirens, March 26, 2003 3

EPP 06-019 Alert and Notification System Sirens, October 2, 2016 9A

EPP 06-022 Tone Alert Radio Maintenance/Compensating Measures, 5A

April 4, 2014

Work Orders

16-411700 16-416603 17-422188 17-430259

Miscellaneous Documents

Number Title Date

Letter, Mr. Ronald

L. McCabe, RAC Chair, FEMA May 7, 2008

Region VII to Mr. Richard Flannigan, Manager, Regulatory

Affairs, Wolf Creek Nuclear Operating Corporation;

Response to the Final Siren Test Report Review, from

American Signal Corporation for WCNOC

Miscellaneous Documents

Number Title Date

Memorandum, American Signal Corporation; Validation of

Outdoor Siren Propagation Model through Acoustic Testing

and Measurement of the Wolf Creek ANS Sy

REP-10 Design Review Report, Wolf Creek Nuclear May 7, 2008

Operating Company

Tone Alert Radio Audit Plan December 5,

2017

Tone Alert Radio Audit Plan December 8,

2016

71114.03 - Emergency Response Organization Staffing and Augmentation System

Procedures

Number Title Revision

EPP 06-015 Emergency Response Organization Callout, September 30, 14

2015

Condition Reports

115983 124451

Miscellaneous Documents

Number Title Date

16-Q3 Quarterly Callout Test Conducted September 12, September 13,

2016 2016

16-Q4 Quarterly Callout Test Conducted December 8, December 8,

2016 2016

17-Q1 Quarterly Callout Test Conducted March 28, 2017 March 30,

2017

17-Q2 Quarterly Callout Test Conducted June 27, 2017 June 29, 2017

17-Q3 Quarterly Callout Test Conducted September 6, September 20,

2017 2017

17-Q4 Quarterly Callout Test Conducted November 27, November 29,

2017 2017

18-Q1 Quarterly Callout Test Conducted March 14, 2018 March 14,

2018

18- Q2 Quarterly Callout Test Conducted June 18, 2018 June 21, 2018

71114.05 - Maintenance of Emergency Preparedness

Procedures

Number Title Revision/Date

AP 06-002 Radiological Emergency Response Plan, August 7, 2018 18B

AP 06-004 Equipment Important to Emergency Response, January 18, 8

2018

AP 17C-024 Emergency Planning Responsibilities, September 30, 2015 13

AP 17C-028 Emergency Response Duties and Responsibilities, 15

September 24, 2015

AP 21A-002 Diverse and Flexible Coping Mitigation Strategies Program 3

APF 06-002-01 Emergency Action Levels 17B

EPP 06-009 Drill and Exercise Requirements, January 24, 2017 11

EPP 06-018 Maintenance of Emergency Facilities and Communications 13

Checks, November 29, 2016

EPP 06-021 Training Programs, November 28, 2017 12

EPP 06-023 Emergency Response Facility Functionality, December 16, 3

2015

Tool Kit 010 Dosimeter Annual Calibration (RDDs and PICs) April 13, 2017

Condition Reports

109918 111604 111626 112435 113322

113710 114405 115932 116368 116717

117040 117446 119507 119903 120017

20356 123795 123980 124428 124498

25031 125976

Work Orders

2-352615-000 15-408018-000

Miscellaneous

Number Title Revision/Date

CFR 50.54Q Screenings/Evaluations for AP 06-004, October 16,

Equipment Important to Emergency Preparedness, R7 2017

CFR 50.54Q Screenings/Evaluations for EPP 06-001, July 30, 2018

Control Room Operations, R10

Miscellaneous

Number Title Revision/Date

CFR 50.54Q Screenings/Evaluations for EPP 06-003, October 16,

Emergency Operations Facility Operations, R13 2017

CFR 50.54Q Screenings/Evaluations for EPP 06-007, October 16,

Emergency Notifications, R16 2017

CFR 50.54Q Screenings/Evaluations for EPF 06-018- August 2, 2017

09, Offsite Monitoring Inventory Checklist, R29

CFR 50.54Q Screenings/Evaluations for EPF 06-018- August 2, 2017

2, Emergency Operations Facility Checklist, R30

CFR 50.54Q Screenings/Evaluations for EPP 06-021, November 16,

Training Programs, R19 2017

Annual PMP Checks November 16,

2017

Control Room Inventory Checklist March 13, 2018

Control Room Inventory Checklist October 5, 2017

Emergency Planning Monthly Communications Checklist December 5,

2016

Emergency Planning Monthly Communications Checklist March 21, 2017

Emergency Planning Quarterly Communications February 27,

Checklist 2017

Emergency Planning Quarterly Communications February 28,

Checklist 2018

Emergency Response Facility Functionality Evaluation October 11,

2017

Offsite Medical Emergency Supplies Inventory Checklist December 14,

2016

Offsite Medical Emergency Supplies Inventory Checklist April 23, 2018

Offsite Monitoring Inventory Checklist December 15,

2016

Offsite Monitoring Inventory Checklist March 13, 2018

Offsite Monitoring Inventory Checklist, Post-Exercise March 1, 2018

Technical Support Center Inventory Checklist September 8,

2016

Technical Support Center Inventory Checklist July 21, 2017

Technical Support Center Inventory Checklist October 5, 2017

Miscellaneous

Number Title Revision/Date

Technical Support Center Inventory Checklist, Post- September 25,

Exercise 2017

Topeka Joint Information Clearinghouse Inventory February 16,

Checklist 2017

Topeka Joint Information Clearinghouse Inventory February 28,

Checklist 2018

Topeka Joint Information Clearinghouse Inventory March 30, 2017

Checklist, Post-Exercise

Wolf Creek Joint Information Clearinghouse Inventory March 30, 2017

Checklist

Wolf Creek Joint Information Clearinghouse Inventory February 28,

Checklist 2018

16-SA-02 Evaluation Report for the Exercise Conducted December 14,

December 7, 2016 2016

17-04-EP Quality Assurance Audit Report June 8, 2017

17-EVAL Evaluation Report for the Exercise Conducted December 12,

November 14, 2017 2017

17-PRE-01 Evaluation Report for the Exercise Conducted September 25,

September 19, 2017 2017

17-PRE-02 Evaluation Report for the Exercise Conducted December 12,

October 24, 2017 2017

17-SA-01 Evaluation Report for the Exercise conducted February March 13, 2017

14, 2017

17-SA-01 Evaluation Report for the Exercise Conducted February February 20,

13, 2018 2018

17-SA-02 Evaluation Report for the Exercise Conducted March 14, April 3, 2017

2017

17-SA-02 Evaluation Report for the Exercise Conducted April 18, August 15, 2017

2017

17-SA-02 Evaluation Report for the Exercise Conducted July 18, August 15, 2017

2017

18-05-EP Quality Assurance Audit Report June 20, 2018

18-SA-01 Evaluation Report for the Exercise Conducted

February 27, 2018

CE1235610 Lesson Plan: Offsite Dose Projection using EDCP, 13A

August 14, 2018

Miscellaneous

Number Title Revision/Date

QH-2016-1348 NRC Emergency Preparedness Cornerstone Assessment

QH-2016-1357 ERO Membership Review by Organization October 5, 2016

QH-2017-1426 Monticello 50.54(q) Review March 8, 2017

QH-2017-1427 Monticello ERO Team Change Briefing March 8, 2017

QH-2017-1438 Assessment of Chemistry and RP use within the On Shift March 8, 2017

Staffing Assessment

QH-2017-1464 INPO Drill and Exercise Scenario Seminar Trip Report April 24, 2017

QH-2017-1558 Emergency Planning NRC Inspection Readiness October 5, 2017

QH-2018-1681 Emergency Response Personnel Training Self- June 26, 2018

Assessment

71114.06Drill Evaluation

Procedures

Number Title Revision

EPP 06-006 Protective Action Recommendations 9A

Condition Reports

26171 126183 126184 126185 126186

26189 126190 126192 126193 126195

26197 126198 126199 126200 126201

26202 126203 126204 126205 126206

26207 126208 126210 126212 126213

Miscellaneous Documents

Number Title Revision/Date

18-SA-02 Wolf Creek Generating Station - Emergency Planning Drill August 28,

2018

APF 06-002-01 Emergency Action Levels 17B

APF 22C-003-01 On-Line Nuclear Safety and Generation Risk Assessment: August 27 to

2018-309 September 2,

2018

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification - August 28,

Message #: CR-001 2018

Miscellaneous Documents

Number Title Revision/Date

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification - August 28,

Message #: EOF-002 2018

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification - August 28,

Message #: EOF-003 2018

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification - August 28,

Message #: EOF-004 2018

EPF 06-007-01 Wolf Creek Generating Station Emergency Notification - August 28,

Message #: TSC-001 2018

Scenario 16-06 Requalification Exam 1

71124.05Radiation Monitoring Instrumentation

Procedures

Number Title Revision

AI 02E-009 Instructions for Intrinsic Germanium Detector Energy 13A

Calibration

AI 02E-010 Instructions for IG Detector Efficiency Calibration 7A

AI 03-008 Control Chart Development, Use and Review Using Lab 6

Stats

AP 02-008 Verification of Analytical Performance 14

AP 02E-001 Chemistry Calibration Program 36

AP 23-006 System Engineering Program 27A

AP 25A-001 Radiation Protection Manual 18

RPP 01-405 HP Instrument Program 34

RPP 03-407 Testing of Portal Monitors as Passive Whole Body Counters 1A

RPP 05-306 PM12 Operation 6

RPP 05-707 Operation of Whole Body Counters 9

RPP 06-103 Ludlum 9-4 Calibration 0

RPP 06-113 MGP Telepole Calibration 3

RPP 06-222 Escort Elf Calibration 2

RPP 06-306 PM12 Calibration 9

RPP 06-315 Eberline PCM-1B Calibration 10

RPP 06-317 Eberline PCM-2 Calibration 5

Procedures

Number Title Revision

RPP 06-319 SAM11 Calibration 1

RPP 06-707 Calibration of WBC Detectors Using Ortec Renaissance 4

Software

RPP 06-715 Whole Body Counter Quality Control 9

RPP 06-825 J. L. Shephard Multi-Source Calibration System Operation 8A

STS IC-452B Channel Calibration New Fuel Storage Facility Criticality 4A

Monitor SDRE-0035

STS IC-454B Channel Calibration Spent Fuel Pool Criticality Monitor Area 11

Radiation Monitor SDRE-0038

STS SP-292 Channel Calibration of Condenser Air Discharge Monitor GE 3

RE-0092

Audits, Self-Assessments, and Surveillances

Number Title Date

18-01-RP/PC Quality Assurance Audit Report: Radiation Protection and February 15,

Process Control (RP & PC) 2018

QA-2017-0387 Quality Assessment: Radiation Protection (RP) Equipment December 29,

Calibration Controls 2017

Condition Reports

107189 107190 107191 107193 113038

113556 116717 118252 118867 120567

20963 121150

Miscellaneous Documents

Number Title Revision/Date

System Health Report: Radiation Monitoring January 1,

2018, through

June 30, 2018

10066 WBC Calibration Certificate GI Detector

10066 WBC Calibration Certificate Lung Detector

10066 WBC Calibration Certificate Thyroid Detector

10178 Telepole

242 PCM-2

Miscellaneous Documents

Number Title Revision/Date

256 ASP-1

257 ASP-1

11005 SAM 11

11075 Shepherd Calibrator

11377 PCM-1B

11451 Radeco H809V-1

13027 WBC Calibration Certificate Lower Detectors

13027 WBC Calibration Certificate Upper/Lower Detectors

217 Ludlum 9-4

219 Ludlum 9-4

2160566 Liquid Scintillator

Chapter 11 Updated Safety Analysis Report: Radioactive Waste 29

Management

WO 16-427623- Minor Maintenance Containment Atmospheric Radiation November 15,

001 Monitor GTRE0032 2016

WO 16-427623- Routine Maintenance Containment Purge Exhaust November 15,

003 Radiation Monitor GTRE0033 2016

WO 18-42244 Channel Calibration High Range Area Radiation Monitor

GTRE60

WO 18-422785 Channel Calibration High Range Area Monitor GTRE-0059

WO 18-422892 Channel Calibration High Range Area Radiation Monitor

GTRE59

WO 18-422893 Channel Calibration High Range Area Radiation Monitor

GTRE60

WO 18-434709 Channel Calibration of Condenser Air Discharge Monitor

GE RE-0092

71124.06Radioactive Gaseous and Liquid Effluent Treatment

Procedures

Number Title Revision

AP 02E-001 Chemistry Calibration Program 38

AP 07B-003 Offsite Dose Calculation Manual 9

CHS AC-001 Accident Sampling 4C

Procedures

Number Title Revision

CHS AX-G01 Unit Vent Sampling and/or Exchange of Filters 10

STN BM-054 Steam Generator Blowdown System Surge Tank Discharge 7C

Flow to Lake Channel Calibration

STN CH-021 Calibration of the Particulate Detector for Radiation Monitors 5

GTRE21A and GHRE10A

STN CH-022 Calibration of the Iodine Detector for Radiation Monitors 2

GTRE21A and GHRE10A

STN HB-1085 Liquid Radwaste System Discharge Line Flow Rate 5

Calibration

STN SP-118 Channel Calibration Liquid Radwaste Discharge Radiation 9

Monitor HB RE-0018

STN SP-195 Channel Calibration Hi/Lo TDS Discharge to Waste Water 7

Treatment Radiation Monitor HF RE-0095

STS CH-014 Calibration of Monitors GT RE-21B and GH RE-10B 13

STS PE-002 Charcoal Adsorbent Sampling for Nuclear Safety Related 15

Units

STS PE-006 Charcoal Adsorber In-Place Leak Test Safety Related Units 16

Audits and Self-Assessments

Number Title Date

18-03-ENV QA Audit: Environmental Management April 17, 2018

Condition Reports

107421 107983 108892 111266 112928

113578 113944 116717 118486 123726

26072

Effluent Release Permits

Permit Number Type Release System Date

U1GB2018-111 Gas Containment Purge August 12, 2018

U1GC2018-110 Gas Radwaste Vent August 9, 2018

U1LB2018-067 Liquid THF04A July 14, 2018

U1LC2018-065 Liquid Steam Generator Blowdown July 3, 2018

Calibrations and Surveillances

Work Order System Date

GH-RE-10A March 20, 2018

GH-RE-10B December 13,

2016

GT-RE-21A February 19,

2018

GT-RE-21B October 3, 2017

16-418841-000 BM-054 March 2, 2017

17-421198-000 HF RE-0095 June 26, 2017

17-423608-000 HB-RE-0018 July 18, 2017

17-431311-000 FGG02B January 9, 2018

17-433703-000 FGG02A June 18, 2018

18-435515-000 HB-1085 August 13, 2018

Miscellaneous Documents

Number Title Date

15-CHL-008 Certificate of Calibration- Standard Reference Source July 1, 2015

101145

Simulated Gas in 130G GA-MA Gas Beaker

16-CHL-005 Certificate of Calibration- Standard Reference Source January 1, 2016

2600

47mm Diameter Simulated Filter in Snap Falcon Petri

2016 Annual Radioactive Effluent Release Report April 25, 2017

2017 Annual Radioactive Effluent Release Report April 25, 2018

71124.07Radiological Environmental Monitoring Program

Procedures

Number Title Revision

AI 07-007 Onsite Groundwater Protection Program Monitoring 17

AI 07B-002 Review of Radiological Environmental Lab Analysis 12

AI 07B-009 Collection, Prep, and Shipment of Sediment 10

AI 07B-011 Collection, Prep, and Ship of Water 17

AI 07B-015 Land Use Census 12

Procedures

Number Title Revision

AI 07B-034 Radiological Environmental Monitoring Program Air 15

Sampling

AI 07B-035 REMP OSL Dosimeters 8

AP 07B-005 Ground Water Protection Program 4

STS IC-890A Wind Speed Meteorological Instrumentation Channel 18

Calibration

STS IC-890D Sonic Wind-Direction-Deviation Meteorological 3

Instrumentation Channel Calibration

Audits, Self-Assessments, and Surveillances

Number Title Date

28 Evaluation Report (NUPIC) of ATI Environmental, Inc. June 16, 2017

4059 Evaluation Report (NUPIC) of Landauer (4059) June 16, 2017

Audit 18-03 Quality Assurance Audit Report, Environmental March 29,

Management: K15-002 2018

QH-2017-1456 AI 07B-034, Radiological Environmental Monitoring March 30,

Program Air Sampling 2018

QH-2017-1456 Radiological Environmental Monitoring Program (REMP) April 24, 2017

contracted services per AI 07B-005, Section 6.12

QH-2018-1391 Review of the KDHE REMP Report December 6,

2016

QH-2018-1684 REMP Review of 2015 through 2017 Wind Directions June 7, 2018

Condition Reports

101560 106475 115681 118440

Calibrations and Surveillances

Number Title Date

3302 Digital Venturi Calibrator March 7, 2017

3302 Digital Venturi Calibrator March 13,

2018

W0 17-432379 Channel Calibration Sonic Wind Speed April 20, 2018

W0 17-432382 Channel Calibration Wind Direction March 26,

2018

Calibrations and Surveillances

Number Title Date

W0 17-432417 Channel Calibration Wind Speed Meteorological March 26,

Instrumentation 2018

Miscellaneous Documents

Number Title Revision/Date

Environmental Resources Management: Risk Assessment August 20,

for Systems, Structures, and Components, Groundwater 2008

Protection Initiative, Wolf Creek

Review of Radiological Environmental Lab Analysis 12

Results

Technical Requirements Manual 25

Wolf Creek Generating Station Power Block - Ground

Water Monitoring Network

2008 Preliminary Hydrology Study, Wolf Creek Generating December 18,

Station, Environmental Resources Management 2007

2009 Coffey County Lake - Ground Water Monitoring Network October 9,

Documentation Report, Delta Consultants 2009

2016 Annual Radioactive Effluent Release Report April 25, 2017

2016 Annual Radiological Environmental Operating Report April 24, 2017

2017 Annual Radioactive Effluent Release Report April 25, 2018

2017 Annual Radiological Environmental Operating Report April 25, 2018

2018 Digital Flow Meter Calibration Verification, AIF 07B-034-01 1

71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation

Procedures

Number Title Revision

AP 31A-100 Solid Radwaste Process Control Program 8

HW1215801 Regulations and Requirements 12A

HW1215802 Regulatory Awareness for Hazardous Material Handlers 0

HW8115901 Wolf Creek Hazardous Material Transportation Security 4

Plan

RPP 07-110 Solid Radwaste Packaging 10

Procedures

Number Title Revision

RPP 07-112 Processing Cartridge Filters 5

RPP 07-123 Preparation and Shipment of Radioactive Waste and 8

Material

RPP 07-131 Bead Resin/Activated Carbon Dewatering Procedure For 5

Energy Solutions14-215 or Smaller Liners, Utilizing

Energy Solutions Self-Engaging Dewatering System

Audits and Self-Assessments

Number Title Date

18-01-RP/PC Quality Assurance Audit Report: Radiation Protection and February 15,

Process Control (RP & PC) 2018

Condition Reports

2184 97750 97752 110270 113038

114455 119333 119745 119751 119765

119766 120567

Radioactive Material and Waste Shipments

Number Type Title Date

16R02 Dry Active UN2912, Radioactive Material, LSA-I, 7, A(U) February 9, 2016

Waste

16R15 Resins UN3321, Radioactive Material, LSA-II, 7, A(U) May 18, 2016

16R16 Filters; UN3321, Radioactive Material, LSA-II, 7, C June 1, 2016

Resin

16R32 Dry Active UN3321, Radioactive Material, LSA-II, 7, A(U) September 15,

Waste 2016

16R59 Resin UN3321, Radioactive Material, LSA-II, 7, RQ, B October 14, 2016

16R64 Resin UN3321, Radioactive Material, LSA-II, 7, A(U) October 23, 2016

17R04 Dry Active UN2912, Radioactive Material, LSA-I, 7, A(U) February 16, 2017

Waste

17R14 Dry Active UN3321, Radioactive Material, LSA-II, 7, A(U) May 24, 2017

Waste

17R15 Resin UN3321, Radioactive Material, LSA-II, 7, A(U) June 22, 2017

Radioactive Material and Waste Shipments

Number Type Title Date

17R17 Dry Active UN2912, Radioactive Material, LSA-I, 7, A(U) July 12, 2017

Waste

17R31 Dry Active UN3321, Radioactive Material, LSA-II, 7, A(U) September 18,

Waste; 2017

Resin

Waste Stream Analysis - Nuclide Distribution Reports

Number Title Date

29898001 Cation Resin July 17, 2017

29998002 BTRS Resin August 2, 2017

446223001 RCS Filters March 1, 2018

446223002 SFP Filters February 28, 2018

446223003 Dry Active Waste March 12, 2018

447547001 CVCS Resins March 27, 2018

447769002 Drum Dryer Waste Tank March 31, 2018

Radiological Surveys

Number Title Date

M-20180321-11 High Level Radwaste Storage March 21, 2018

M-20180326-10 Low Level Radwaste Storage March 26, 2018

M-20180523-9 RCA Yard May 23, 2018

M-20180611-3 Owens Corning June 11, 2018

M-20180721-1 New Radwaste Building July 21, 2018

M-20180728-7 RCA Yard July 28, 2018

Miscellaneous Documents

Number Title Revision/Date

2016 Annual Radioactive Effluent Release Report April 25, 2017

2017 Annual Radioactive Effluent Release Report April 25, 2018

Spent Fuel Pool Inventory: Tri-Nuke Filters August 23, 2018

Miscellaneous Documents

Number Title Revision/Date

Wolf Creek Updated Safety Analysis Report - Chapter 30

11.4 and Chapter 12.2.1

RPF 07-123-01 Radioactive Shipment Log: 2016, 2017, 2018

71151Performance Indicator Verification

Procedures

Number Title Revision

AI 26A-004 Emergency Planning Performance Indicators, May 2, 2016 8

AP 26A-001 Reportable Events, Evaluation and Documentation, July 24, 20

2014

AP 34-003 Performance Indicator Program, August 17, 2010 0

EPP 06-005 Emergency Classification, February 23, 2016 8

EPP 06-006 Protective Action Recommendations, December 14, 2017 9A

EPP 06-007 Emergency Notifications, October 18, 2017 25

EPP 06-019 Alert and Notification System Sirens, October 2, 2016 9A

Condition Reports

110999 116997 118425 119906 120323

26201 127496 127526

Miscellaneous Documents

Number Title Revision/Date

MSPI Derivation Report - MSPI System: MSPI Cooling August 2018

Water System; MSPI Element: Performance Limit Exceeded

(PLE)

MSPI Derivation Report - MSPI System: MSPI Cooling August 2018

Water System; MSPI Element: Unavailability Index (UAI)

MSPI Derivation Report - MSPI System: MSPI Cooling August 2018

Water System; MSPI Element: Unreliability Index (URI)

MSPI Derivation Report - MSPI System: MSPI Emergency August 2018

AC Power System; MSPI Element: Performance Limit

Exceeded (PLE)

MSPI Derivation Report - MSPI System: MSPI Emergency August 2018

AC Power System; MSPI Element: Unavailability Index

(UAI)

Miscellaneous Documents

Number Title Revision/Date

MSPI Derivation Report - MSPI System: MSPI Emergency August 2018

AC Power System; MSPI Element: Unreliability Index (URI)

MSPI Derivation Report - MSPI System: MSPI High August 2018

Pressure Injection System; MSPI Element: Performance

Limit Exceeded (PLE)

MSPI Derivation Report - MSPI System: MSPI High August 2018

Pressure Injection System; MSPI Element: Unavailability

Index (UAI)

MSPI Derivation Report - MSPI System: MSPI High August 2018

Pressure Injection System; MSPI Element: Unreliability

Index (URI)

MSPI Unavailability for Chemical & Volume Control System Printed

BG-07A September 11,

2018

MSPI Unavailability for Chemical & Volume Control System Printed

BG-07B September 11,

2018

MSPI Unavailability for Component Cooling Water System Printed

EG-01A September 11,

2018

MSPI Unavailability for Component Cooling Water System Printed

EG-01B September 11,

2018

MSPI Unavailability for Essential Service Water EF-01A Printed

September 11,

2018

MSPI Unavailability for Essential Service Water EF-01B Printed

September 11,

2018

MSPI Unavailability for High Pressure Coolant Injection Printed

System EM-01A September 11,

2018

MSPI Unavailability for High Pressure Coolant Injection Printed

System EM-01B September 11,

2018

MSPI Unavailability for Standby Diesel Engine System KJ- Printed

01A September 11,

2018

Miscellaneous Documents

Number Title Revision/Date

MSPI Unavailability for Standby Diesel Engine System KJ- Printed

01B September 11,

2018

Unavailability Data July 2017

through June

2018

Unreliability Data July 2017

through June

2018

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to May 17, 2017

Criteria and Goals - System: BG - 112594

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to February 12,

Criteria and Goals - System: BG - CR 118860 2018

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to May 3, 2018

Criteria and Goals - System: BG - CR 121938

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to May 16, 2018

Criteria and Goals - System: BG - CR 122610

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to August 9,

Criteria and Goals - System: EF - CR 125201 2018

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to December 5,

Criteria and Goals - System: EG - CR 120591 2017

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to May 17, 2017

Criteria and Goals - System: EM - CR 112588

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to May 17, 2017

Criteria and Goals - System: EM - CR 112594

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to April 27, 2017

Criteria and Goals - System: KJ - CR 112131

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to October 1,

Criteria and Goals - System: KJ - CR 115725 2017

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to December 5,

Criteria and Goals - System: KJ - CR 117441 2017

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to September 5,

Criteria and Goals - System: NB - CR 126025 2018

EDI 23M-050 Engineering Desktop Instruction Monitoring Performance to October 1,

Criteria and Goals - System: NG - CR 115725 2017

WCNOC-163 NEI 99-02 Reactor Oversight Process Performance 12

Indicators - Mitigating System Performance Index (MSPI)

Basis Document

Miscellaneous Documents

Number Title Revision/Date

WCRE-34 Fourth Ten Year Interval Inservice Testing Bases Document 3

71152Problem Identification and Resolution

Procedures

Number Title Revision

AP 10-104 Breach Authorization 35

AP 10-104 Breach Authorization 37A

AP 15C-002 Procedure Use and Adherence 43

AP 23-009 Control Room Envelope Habitability Program 2

STS PE-004 Aux Building and Control Room Pressure Test 16

SYS AE-150 Main Feedwater Pump Reset 2

SYS AE-150 Main Feedwater Pump Reset 3

SYS GK-122 Manual CRVIS Line-Up 24

Drawings

Number Title Revision

M-12GG01 Piping & Instrumentation Diagram Fuel Building HVAC 8

M-12GL02 Piping & Instrumentation Diagram Auxiliary Building HVAC 17

M-12GT01 Piping & Instrumentation Diagram Containment Purge 29

Systems HVAC

M-1H1531 Heating Ventilating and Air Cond. Auxiliary Building El. 5

2047-6 Area-3

Condition Reports

29602 61246 90956 90975 110377

119330 120056 120151 122180 123289

Work Orders

2-355727-011 15-397077-000 17-421482-000 17-421482-001 17-423496-000

17-428518-000 17-428518-001 18-437033-006

Miscellaneous Documents

Number Title Revision/Date

U.S. Nuclear Regulatory Commission Regulatory 1

Guide 1.117: Tornado Design Classification

AIF 10-001-02 SCBA Inspection [3.2.1] Completed

March 1, 2018

AIF 28A-100-12 Wolf Creek Generating Station Basic Cause Evaluation - February 20,

CR 90975 2015

AIF 28A-100-12 Wolf Creek Generating Station Basic Cause Evaluation - April 5, 2018

CR 120056

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and Completed

Control Room Pressure Test - Train A - STS PE-004 March 15,

2018

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and Completed

Control Room Pressure Test - Train B - STS PE-004 March 7, 2018

APF 29B-003-01 Surveillance Test Routing Sheet (STRS) - Aux Building and Completed

Control Room Pressure Test - Train B - STS PE-004 March 15,

2018

CR 120056 Evidence and Action Matrix B CRVIS Pressure Issue March 5, 2018

K01-048 03146 Material Safety Data Sheet: Ventilation Smoke Tube - P/N

458480

WCRE Boundary Matrix 0

WCRE-35 Boundary Matrix 3

The following items are requested for the

Public Radiation Safety Inspection

at Wolf Creek

Dates of Inspection: August 20, 2018 to August 23, 2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before August 6, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled

5- A, applicable organization charts in file/folder 5- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

Louis.Carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

5. Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection: May 23, 2016

A. List of contacts and telephone numbers for the following areas:

1. Effluent monitor calibration

2. Radiation protection instrument calibration

3. Installed instrument calibrations

4. Count room and Laboratory instrument calibrations

B. Applicable organization charts

C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support and

LERs, performed since the date of the last inspection related to:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

or whole body counters

2. Installed radiation monitors

D. Procedure index for:

1. Calibration, use, and operation of continuous air monitors, criticality monitors,

portable survey instruments, temporary area radiation monitors, electronic

dosimeters, teledosimetry, personnel contamination monitors, and whole body

counters.

2. Calibration of installed radiation monitors

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure index.

1. Calibration of portable ion chambers

2. Whole body counter calibration

3. Laboratory instrumentation quality control

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Area radiation monitors, continuous air monitors, criticality monitors, portable survey

instruments, electronic dosimeters, teledosimetry, personnel contamination monitors,

whole body counters

2. Installed radiation monitors

3. Count room radiation instruments

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. Most recent calibration data for the whole body counters.

H. Radiation Monitoring System health report for the previous 12 months

6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection: May 23, 2016

A. List of contacts and telephone numbers for the following areas:

1. Radiological effluent control

2. Engineered safety feature air cleaning systems

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

D. Procedure indexes for the following areas

1. Radioactive effluents

2. Engineered Safety Feature Air cleaning systems

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Laboratory instrumentation quality control

5. In-place testing of HEPA filters and charcoal adsorbers

F. List of corrective action documents (including corporate and sub-tiered systems) written

since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors

3. Engineered Safety Feature Air cleaning systems

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. Annual Radioactive Effluent Release Reports for calendar years 2016 and 2017, or the

two most recent reports.

H. Current revision of the Offsite Dose Calculation Manual

I. The 2016 and 2017 inter-laboratory comparison results for laboratory quality control

performance of effluent sample analysis, or the two most recent results.

J. Effluent sampling schedule for the week of the inspection

K. New entries into 10 CFR 50.75(g) files since the date of the last inspection

L. Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service

M. Listing or log of liquid and gaseous release permits since the date of the last inspection

N. A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances

O. System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s).

P. A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

Q. A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

7. Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection: May 23, 2016

A. List of contacts and telephone numbers for the following areas:

1. Radiological environmental monitoring

2. Meteorological monitoring

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D. Procedure index for the following areas:

1. Radiological environmental monitoring program

2. Meteorological monitoring program

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to the following programs:

1. Radiological environmental monitoring

2. Meteorological monitoring

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. Copies of the two most recent calibration packages for the meteorological tower

instruments

H. Copies of the 2016 and 2017 Annual Radiological Environmental Operating Reports and

Land Use Census, and current revision of the Offsite Dose Calculation Manual.

I. Copy of the environmental laboratorys inter-laboratory comparison program results for

2016 and 2017, or the two most recent results, if not included in the annual radiological

environmental operating report

J. Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

K. Quality Assurance audits (e.g., NUPIC) for contracted services

L. Current NEI Groundwater Initiative Plan and status

M. Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

N. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection.

8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection: May 23, 2016

A. List of contacts and telephone numbers for the following areas:

1. Solid Radioactive waste processing

2. Transportation of radioactive material/waste

B. Applicable organization charts (and list of personnel involved in solid radwaste

processing, transferring, and transportation of radioactive waste/materials)

C. Copies of audits, department self-assessments, and LERs written since the date of the

last inspection related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D. Procedure index for the following areas:

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Process control program

2. Solid and liquid radioactive waste processing

3. Radioactive material/waste shipping

4. Waste stream sampling and analysis

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. Copies of training lesson plans for 49 CFR 172 subpart H, for radwaste processing,

packaging, and shipping.

H. A summary of radioactive material and radioactive waste shipments made from the date

of the last inspection, to present

I. Waste stream sample analysis results and resulting scaling factors for 2016 and 2017,

or the two most recent results.

J. A listing of onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility.

ML18311A384

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NHT Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DRP/B RI: DRP/B C:DRS/OB C:DRS/PSB2 C:DRS/EB1 C:DRS/EB2

NAME DDodson FThomas VGaddy HGepford TFarnholtz GWerner

SIGNATURE DED FDT vgg hjg TRF GEW

DATE 10/31/18 10/30/18 10/22/18 10/22/18 10/22/2018 10/22/2018

OFFICE BC:DRP/B

NAME NTaylor

SIGNATURE NHT

DATE 11/7/2018