February 06, 2023
SUBJECT:
WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2023402
Dear Cleave Reasoner:
On January 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mr. Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number:
05000482
License Number:
Report Number:
Enterprise Identifier:
I-2023-402-0017
Licensee:
Wolf Creek Nuclear Operating Corporation
Facility:
Wolf Creek Generating Station
Location:
Burlington, KS
Inspection Dates:
January 23, 2023 to January 27, 2023
Inspectors:
R. Lanfear, Physical Security Specialist
A. Meyen, Physical Security Inspector
Approved By:
Ray L. Kellar, P.E., Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
- (1) Tier I: All requirements
Tier II: All requirements
Tier III: All requirements
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
- (1) Tier I: All Requirements
Tier II: All Requirements
Tier III: All Requirement
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) U) The inspectors evaluated the security plan changes through completion of the following procedure elements:
(U) Since the last NRC inspection of this program area, Wolf Creek Nuclear Generating Station Security Plan Revision 16 was implemented based on the licensee's determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) October 01, 2021 - December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On January 26, 2023, the inspectors presented the security baseline inspection results to Mr. Jaime McCoy, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10015833,
0015498,
10006777,
10014494,
10011073
Access
Authorization
Records
Various
Miscellaneous
Approved
contractor audit
AI-01-001
Access Authorization Procedure
AI-01-007
Reviewing Official
AI-01-008
Denial Process
AP 01-001
Access Authorization Program
21A
AP-01-002
Personal Access Data System (PADS)
Procedures
AP-01A-002
Behavior Observation Program
Corrective Action
Documents
CR
10018350, 10016315
10019338, 10018862
10016637, 10015741
Corrective Action
Documents
Resulting from
Inspection
CR
10021960
Miscellaneous
Access Denied List
07/22 -
01/23
AP-27-004
Controlling Safeguards Information
AP-27-005A
Cargo Search
SEC-01-202A
Personnel Access to the Protected Area
8A
SEC-01-203A
Personnel Access to the Vital Areas
1B
SEC-1-206A
Lock and Key Control
Procedures
SEC-1-207
Vehicle Access Control
Miscellaneous
Protective
Security Plan Changes, Revisions 15 to 16.
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Strategy
71151
Miscellaneous
Performance Indicator Data
10/01/21 to
2/31/22