November 19, 2020
SUBJECT:
WOLF CREEK GENERATING STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000482/2020012
Dear Mr. Reasoner:
On November 5, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On November 5, 2020, the NRC inspectors discussed the results of this inspection with Mr. J. McCoy, Site Vice-President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number:
05000482
License Number:
Report Number:
Enterprise Identifier: I-2020-012-0018
Licensee:
Wolf Creek Nuclear Operating Company
Facility:
Wolf Creek Generating Station
Location:
Burlington, Kansas
Inspection Dates:
October 19, 2020 to November 5, 2020
Inspectors:
S. Alferink, Reactor Inspector
S. Graves, Senior Reactor Inspector
J. Mateychick, Senior Reactor Inspector
Approved By:
Nicholas H. Taylor, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that the following systems credited in the approved fire protection program could perform their licensing basis function:
- (1) Auxiliary feedwater system and the steam generator power operated relief valves
- (2) Fire water system including the fire pumps and the yard loop distribution piping
- (3) Fire protection features including fire detection system and Halon suppression system in Fire Area C-10, ESF Switchgear Room (South)
- (4) Fire protection features including fire detection system and Halon suppression system in Fire Area A-18, Auxiliary Building - 2026' Elevation, Electrical Penetration Room (North)
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the following fire protection program administrative controls were implemented in accordance with the current licensing basis:
- (1) The licensees administrative controls of hot work, transient combustibles, fire impairments, control of modifications, and control of procedure revisions
- (2) The licensees fire brigade training program
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors reviewed the following changes to ensure that they did not constitute an adverse effect on the ability to safely shutdown post-fire and to verify that fire protection program documents and procedures affected by the changes were updated:
- (1) Revisions to Procedures OFN RP-17, Control Room Evacuation, and OFN RP-17A, Hot Standby to Cold Shutdown from Outside the Control Room due to Fire, including corrective actions for NCV 05000482/2017008-01, Inadequate Evaluation of Spurious Valve Operation, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17325A098)
- (2) Modification of control circuits for the pressurizer power operated relief valves isolation valves (BBHV8000A and BBHV8000B) as a corrective action for NCV 05000482/2017008-01, Inadequate Evaluation of Spurious Valve Operation, (ADAMS Accession No. ML17325A098)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 5, 2020, the inspectors presented the triennial fire protection inspection results to Mr. J. McCoy, Site Vice-President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
AN 98-023
WCGS Fire Risk Evaluation Re-Analysis
E-1F9900
Post-Fire Safe Shutdown Operator Manual Actions
E-1F9910
Post-Fire Safe Shutdown Area Analysis
E-1F9915
Design Basis Document for OFN RP-017
KC-M-0006
Water-Based Fire Protection System and Standpipe System
Hydraulic Calculation
SA-08-006
RETRAN-3D Post-Fire Safe Shutdown (PFSSD)
Consequence Evaluation for a Postulated Control Room
Fire
WCNOC-CP-002
Wolf Creek Fire Protection Transient Analysis with
RETRAN-3D
XX-E-013
Post-Fire Safe Shutdown (PFSSD) Analysis
Corrective Action
Documents
Condition
Reports
116489, 116786, 116831, 143808, 116410, 116786,
116829, 116831, 126394, 125836, 012907, 135530, 132829
Corrective Action
Documents
Resulting from
Inspection
Condition
Reports
145789, 145801, 145802, 145803, 145816
Drawings
771661
Schematic & Interconnection Diagram 2 Zone Halon
A888-M153
F
25-M-0CFF01,
Sheet 1
Site Fire Protection Yard Loop
E-1F1401
Fire Detection/Protection System - Auxiliary Building
El. 20206' - 0"
E-1F3301
Fire Detection/Protection System Control Building and
Communications Corridor - El. 2000' - 0" & El. 2016' - 0"
M-0023, Sheet 1
P&ID Fire Protection System (FP)
M-0023, Sheet 2
P&ID Fire Protection System (FP)
M-12KC01
Piping & Instrumentation Diagram Fire Protection Turbine
Building
M-12KC02
Piping & Instrumentation Diagram Fire Protection System
M-12KC04
Piping and Instrumentation Diagram Fire Protection Halon
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
System
M-12KCO7
Piping and Instrumentation Diagram Fire Protection Halon
System
M0-0023, Sheet 7 P&ID Fire Protection System (FP) Temporary Fire Pump
Installation & Operation Requirement
M650A
Standardized Nuclear Unit Power Plant System SNUPPS
WCNOC-102
OFN RP-017 Emergency Lighting Path Drawing
Level 1974'-0"
WCNOC-102A
OFN RP-017 Emergency Lighting Drawing Level 1984'-0"
and 1988'-0"
WCNOC-102B
OFN RP-017 Emergency Lighting Path Drawing
Level 2000'-0"
WCNOC-102C
OFN RP-017 Emergency Lighting Path Drawing
Level 2015'-0" and 2016'-0"
WCNOC-102D
OFN RP-017 Emergency Lighting Path Dearing Level 2026',
2032' and 2033'
WCNOC-102E
OFN RP-017 Emergency Lighting Path Drawing
Level 2047'-6"
Engineering
Changes
20035
PORV Block Valve and Other Procedural Changes for
20191
BBHV8000A-B PFSSD Modification to Address IN 92-18
Engineering
Evaluations
20178
Fire Protection Underground Pipe Coating Requirements
20416
MOV Pressure Boundary Extent of Condition Evaluation for
PFSSD Control Room Fire (Ref. CD 116831)
E-1F9905
Fire Hazards Analysis
Miscellaneous
Fire Protection Program Regulatory Bases
Fire Protection Program Health Report
08/25/2020
Fire Brigade Training Drill Performance Log 2017 - 2020
Summary of Drill Performance Issues
10/19/2020
Fire Protection Impairment Approved/Posted Permits
10/19/2020
IRIS Operating Experience List
10/19/2020
Fire Protection Program Health Report
01/27/2020
AIF 10-001-01
Fire Brigade Equipment Inventory and Inspection
09/23/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AIF 10-001-02
SCBA Inspection
08/31/2020
APF 10-105-02
Fire Drill Scenario and Critique Report
08/05/2020
APF 10-105-02
Fire Drill Scenario and Critique Report
07/24/2020
APF 28D-001-02
NA
FB 1231400
Initial Fire Brigade Training Manual
M-10KC
System Description Fire Protection Systems (KC & FP)
TCMP-20-0030
Transient Combustible Materials Permit
08/12/2020
TCMP-20-0033
Transient Combustible Materials Permit
08/21/2020
TISP-20-0067
Transient Ignition Source Permit
09/16/2020
TISP-20-0070
Transient Ignition Source Permit
09/28/2020
Updated Safety
Analysis Report,
Section 9.5.1
Fire Protection Systems
WCLR-14
Fire Water System B2.1.13 NUREG-1891 Program XI.M27
Aging Management Program
WCLR-15
Fire Protection B2.1.12 NUREG-1801 Program XI.M26
Aging Management Program
WCLR-34
Buried Piping and Tanks Inspection B2.1.18 NUREG 18-1
Program XI.M34 Aging Management Program
WCLR-35
Selective Leaching of Materials B2.1.17 NUREG 1801
Program XI.M33 Aging Management Program
Procedures
AI 10-001
Fire Brigade Equipment Inventory, Maintenance And
Cleaning
13A
AI 10-001
Fire Brigade Equipment Inventory, Maintenance And
Cleaning
13A
AI 21-017
Timed Fire Protection Actions Validation
AP 05-005
Design, Implementation, and Configuration Control of
Modifications
AP 05-008
Fire Protection Review
AP 10-002
Fire Protection Quality Program Requirements
9A
AP 10-100
AP 10-101
Control of Transient Ignition Sources
AP 10-102
Control of Combustible Materials
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AP 10-103
Fire Protection Impairment Control
AP 10-104
Breach Authorization
AP 10-106
Fire Preplans
AP 10-109
Fire Protection Inspections
Preparation, Review and Approval of Procedures,
Instructions and Forms
53A
On-Line Nuclear Safety and Generation Risk Assessment
License Renewal Implementation
0A
FB 1231400
Initial Fire Brigade Training Manual
FB1231421
Fire Brigade Orientation, Fire Prevention Policies, Thermal
Protective Clothing and Fire Behavior
01/22/2020
INC AL-0010
Turbine Driven Auxiliary Feedwater Pump to Steam
Generator B Flow Loop AL LPF-0010
IP-ENG-001
Standard Design Process
MGE LT-008
Routine Electrical Limitorque Operator Maintenance
8A
MPM LT-001
Limitorque Operator Minor Maintenance, Lubrication, and
Inspection
OFN KC-016
Fire Response
OFN RP-17
Control Room Evacuation
OFN RP-17A
Hot Standby to Cold Shutdown from Outside the Control
Room Due to Fire
STN FP-202
Yard Loop & Hydrant Flush & Hydrant Inspection
STN FP-204
Fire Protection System C-Factor Test
STN FP-209
Fire Pump Performance and Sequential Start Test
31, 33
STN FP-211
Diesel Fire Pump 1FP01PB Monthly Operation and Fuel
Level Check
STN FP-212
Electric Motor Driven Fire Pump 1FP01PA Monthly
Operation
STN FP-401B
Halon System/ESF Switchgear Room 2 (KC-222)
5, 6
STN FP-404A
Halon Main Bank Tank Weight and Pressure Checks
11A
STN FP-404B
Halon Reserve Bank Tank Weight and Pressure Checks
11A
STN FP-405A
Halon System North Electrical Penetration Room (KC-224)
0A
STN FP-450
Fire Damper Inspection and Drop Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
STN FP-452
Fire Barrier Penetration Seals Inspection
STN FP-817A
Trip Act. Device Oper. Test for Bechtel Zones 100, 103,
104, 105, 106, 107, 112, 113 and114
11B
STN FP-817F
Trip Act. Device Oper. Test for Bechtel Zones 306, 307, and
314-317
8B
STS IC-507C
Steam Generator Steam Line Pressure Balance of Plant
Channel Calibration
STS IC-565
Auxiliary Feedwater Pump Suction Pressure Indication for
Remote Shutdown Pressure Channel Calibration
Work Orders
03-248394-000, 10-323339-011, 10-323339-014, 10-
27878-000, 10-327887-000, 10-327888-000, 10-327899-
000, 15-396705-000, 15-396706-000, 15-396709-000, 15-
396748-000, 15-396749-000, 15-396753-000, 16-414781-
144, 17-422881-000, 17-427606-000, 18-435133-000, 18-
435653-000, 18-442172-000, 18-443690-084, 18-444963-
000, 18-445340-000, 18-446390-083, 18-446395-000, 18-
447279-000, 19-448738-000, 19-448843-000, 19-448878-
000, 19-448879-000, 19-448882-000, 19-450628-000, 19-
2962-000, 19-453068-000, 19-454695-000, 19-454737-
000, 19-454807-000, 19-454812-000, 20-457462-000, 20-
457796-000, 20-458199-000, 20-458286-000