IR 05000482/2020012
ML20324A078 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 11/19/2020 |
From: | Nick Taylor NRC/RGN-IV/DRS/EB-2 |
To: | Reasoner C Wolf Creek |
References | |
IR 2020012 | |
Download: ML20324A078 (11) | |
Text
November 19, 2020
SUBJECT:
WOLF CREEK GENERATING STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000482/2020012
Dear Mr. Reasoner:
On November 5, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On November 5, 2020, the NRC inspectors discussed the results of this inspection with Mr. J. McCoy, Site Vice-President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Nicholas Digitally signed by Nicholas H. Taylor H. Taylor Date: 2020.11.19 12:17:46 -06'00'
Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number: 05000482 License Number: NPF-42 Report Number: 05000482/2020012 Enterprise Identifier: I-2020-012-0018 Licensee: Wolf Creek Nuclear Operating Company Facility: Wolf Creek Generating Station Location: Burlington, Kansas Inspection Dates: October 19, 2020 to November 5, 2020 Inspectors: S. Alferink, Reactor Inspector S. Graves, Senior Reactor Inspector J. Mateychick, Senior Reactor Inspector Approved By: Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that the following systems credited in the approved fire protection program could perform their licensing basis function:
- (1) Auxiliary feedwater system and the steam generator power operated relief valves
- (2) Fire water system including the fire pumps and the yard loop distribution piping
- (3) Fire protection features including fire detection system and Halon suppression system in Fire Area C-10, ESF Switchgear Room (South)
- (4) Fire protection features including fire detection system and Halon suppression system in Fire Area A-18, Auxiliary Building - 2026' Elevation, Electrical Penetration Room (North)
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the following fire protection program administrative controls were implemented in accordance with the current licensing basis:
- (1) The licensees administrative controls of hot work, transient combustibles, fire impairments, control of modifications, and control of procedure revisions
- (2) The licensees fire brigade training program
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors reviewed the following changes to ensure that they did not constitute an adverse effect on the ability to safely shutdown post-fire and to verify that fire protection program documents and procedures affected by the changes were updated:
- (1) Revisions to Procedures OFN RP-17, Control Room Evacuation, and OFN RP-17A, Hot Standby to Cold Shutdown from Outside the Control Room due to Fire, including corrective actions for NCV 05000482/2017008-01, Inadequate Evaluation of Spurious Valve Operation, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17325A098)
- (2) Modification of control circuits for the pressurizer power operated relief valves isolation valves (BBHV8000A and BBHV8000B) as a corrective action for NCV 05000482/2017008-01, Inadequate Evaluation of Spurious Valve Operation, (ADAMS Accession No. ML17325A098)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 5, 2020, the inspectors presented the triennial fire protection inspection results to Mr. J. McCoy, Site Vice-President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.05 Calculations AN 98-023 WCGS Fire Risk Evaluation Re-Analysis 0
E-1F9900 Post-Fire Safe Shutdown Operator Manual Actions 9
E-1F9910 Post-Fire Safe Shutdown Area Analysis 16
E-1F9915 Design Basis Document for OFN RP-017 14
KC-M-0006 Water-Based Fire Protection System and Standpipe System 1
Hydraulic Calculation
SA-08-006 RETRAN-3D Post-Fire Safe Shutdown (PFSSD) 3
Consequence Evaluation for a Postulated Control Room
Fire
WCNOC-CP-002 Wolf Creek Fire Protection Transient Analysis with 1
RETRAN-3D
XX-E-013 Post-Fire Safe Shutdown (PFSSD) Analysis 4
Corrective Action Condition 116489, 116786, 116831, 143808, 116410, 116786,
Documents Reports 116829, 116831, 126394, 125836, 012907, 135530, 132829
Corrective Action Condition 145789, 145801, 145802, 145803, 145816
Documents Reports
Resulting from
Inspection
Drawings 771661 Schematic & Interconnection Diagram 2 Zone Halon F
A888-M153
25-M-0CFF01, Site Fire Protection Yard Loop 10
Sheet 1
E-1F1401 Fire Detection/Protection System - Auxiliary Building 5
El. 20206' - 0"
E-1F3301 Fire Detection/Protection System Control Building and 7
Communications Corridor - El. 2000' - 0" & El. 2016' - 0"
M-0023, Sheet 1 P&ID Fire Protection System (FP) 73
M-0023, Sheet 2 P&ID Fire Protection System (FP) 31
M-12KC01 Piping & Instrumentation Diagram Fire Protection Turbine 20
Building
M-12KC02 Piping & Instrumentation Diagram Fire Protection System 25
M-12KC04 Piping and Instrumentation Diagram Fire Protection Halon 4
Inspection Type Designation Description or Title Revision or
Procedure Date
System
M-12KCO7 Piping and Instrumentation Diagram Fire Protection Halon 3
System
M0-0023, Sheet 7 P&ID Fire Protection System (FP) Temporary Fire Pump 1
Installation & Operation Requirement
M650A Standardized Nuclear Unit Power Plant System SNUPPS 34
WCNOC-102 OFN RP-017 Emergency Lighting Path Drawing 0
Level 1974'-0"
WCNOC-102A OFN RP-017 Emergency Lighting Drawing Level 1984'-0" 1
and 1988'-0"
WCNOC-102B OFN RP-017 Emergency Lighting Path Drawing 1
Level 2000'-0"
WCNOC-102C OFN RP-017 Emergency Lighting Path Drawing 1
Level 2015'-0" and 2016'-0"
WCNOC-102D OFN RP-017 Emergency Lighting Path Dearing Level 2026', 1
2032' and 2033'
WCNOC-102E OFN RP-017 Emergency Lighting Path Drawing 1
Level 2047'-6"
Engineering 020035 PORV Block Valve and Other Procedural Changes for 0
Changes PFSSD
20191 BBHV8000A-B PFSSD Modification to Address IN 92-18 0
Engineering 020178 Fire Protection Underground Pipe Coating Requirements 0
Evaluations 020416 MOV Pressure Boundary Extent of Condition Evaluation for 0
PFSSD Control Room Fire (Ref. CD 116831)
E-1F9905 Fire Hazards Analysis 10
Miscellaneous Fire Protection Program Regulatory Bases 4
Fire Protection Program Health Report 08/25/2020
Fire Brigade Training Drill Performance Log 2017 - 2020
Summary of Drill Performance Issues 10/19/2020
Fire Protection Impairment Approved/Posted Permits 10/19/2020
IRIS Operating Experience List 10/19/2020
Fire Protection Program Health Report 01/27/2020
AIF 10-001-01 Fire Brigade Equipment Inventory and Inspection 09/23/2020
Inspection Type Designation Description or Title Revision or
Procedure Date
AIF 10-001-02 SCBA Inspection 08/31/2020
APF 10-105-02 Fire Drill Scenario and Critique Report 08/05/2020
APF 10-105-02 Fire Drill Scenario and Critique Report 07/24/2020
APF 28D-001-02 WCNOC Committed NFPA Codes NA
FB 1231400 Initial Fire Brigade Training Manual 14
M-10KC System Description Fire Protection Systems (KC & FP) 10
TCMP-20-0030 Transient Combustible Materials Permit 08/12/2020
TCMP-20-0033 Transient Combustible Materials Permit 08/21/2020
TISP-20-0067 Transient Ignition Source Permit 09/16/2020
TISP-20-0070 Transient Ignition Source Permit 09/28/2020
Updated Safety Fire Protection Systems 33
Analysis Report,
Section 9.5.1
WCLR-14 Fire Water System B2.1.13 NUREG-1891 Program XI.M27 2
Aging Management Program
WCLR-15 Fire Protection B2.1.12 NUREG-1801 Program XI.M26 1
Aging Management Program
WCLR-34 Buried Piping and Tanks Inspection B2.1.18 NUREG 18-1 1
Program XI.M34 Aging Management Program
WCLR-35 Selective Leaching of Materials B2.1.17 NUREG 1801 3
Program XI.M33 Aging Management Program
Procedures AI 10-001 Fire Brigade Equipment Inventory, Maintenance And 13A
Cleaning
AI 10-001 Fire Brigade Equipment Inventory, Maintenance And 13A
Cleaning
AI 21-017 Timed Fire Protection Actions Validation 8
AP 05-005 Design, Implementation, and Configuration Control of 26
Modifications
AP 05-008 Fire Protection Review 6
AP 10-002 Fire Protection Quality Program Requirements 9A
AP 10-100 Fire Protection Program 23
AP 10-101 Control of Transient Ignition Sources 25
AP 10-102 Control of Combustible Materials 22
Inspection Type Designation Description or Title Revision or
Procedure Date
AP 10-103 Fire Protection Impairment Control 35
AP 10-104 Breach Authorization 38
AP 10-106 Fire Preplans 19
AP 10-109 Fire Protection Inspections 8
AP 15C-004 Preparation, Review and Approval of Procedures, 53A
Instructions and Forms
AP 22C-003 On-Line Nuclear Safety and Generation Risk Assessment 23
AP 23I-003 License Renewal Implementation 0A
FB 1231400 Initial Fire Brigade Training Manual 14
FB1231421 Fire Brigade Orientation, Fire Prevention Policies, Thermal 01/22/2020
Protective Clothing and Fire Behavior
INC AL-0010 Turbine Driven Auxiliary Feedwater Pump to Steam 1
Generator B Flow Loop AL LPF-0010
IP-ENG-001 Standard Design Process 0
MGE LT-008 Routine Electrical Limitorque Operator Maintenance 8A
MPM LT-001 Limitorque Operator Minor Maintenance, Lubrication, and 15
Inspection
OFN KC-016 Fire Response 50
OFN RP-17 Control Room Evacuation 54
OFN RP-17A Hot Standby to Cold Shutdown from Outside the Control 12
Room Due to Fire
STN FP-202 Yard Loop & Hydrant Flush & Hydrant Inspection 16
STN FP-204 Fire Protection System C-Factor Test 31
STN FP-209 Fire Pump Performance and Sequential Start Test 31, 33
STN FP-211 Diesel Fire Pump 1FP01PB Monthly Operation and Fuel 45
Level Check
STN FP-212 Electric Motor Driven Fire Pump 1FP01PA Monthly 21
Operation
STN FP-401B Halon System/ESF Switchgear Room 2 (KC-222) 5, 6
STN FP-404A Halon Main Bank Tank Weight and Pressure Checks 11A
STN FP-404B Halon Reserve Bank Tank Weight and Pressure Checks 11A
STN FP-405A Halon System North Electrical Penetration Room (KC-224) 0A
STN FP-450 Fire Damper Inspection and Drop Test 17
Inspection Type Designation Description or Title Revision or
Procedure Date
STN FP-452 Fire Barrier Penetration Seals Inspection 6
STN FP-817A Trip Act. Device Oper. Test for Bechtel Zones 100, 103, 11B
104, 105, 106, 107, 112, 113 and114
STN FP-817F Trip Act. Device Oper. Test for Bechtel Zones 306, 307, and 8B
314-317
STS IC-507C Steam Generator Steam Line Pressure Balance of Plant 11
Channel Calibration
STS IC-565 Auxiliary Feedwater Pump Suction Pressure Indication for 6
Remote Shutdown Pressure Channel Calibration
Work Orders 03-248394-000, 10-323339-011, 10-323339-014, 10-
27878-000, 10-327887-000, 10-327888-000, 10-327899-
000, 15-396705-000, 15-396706-000, 15-396709-000, 15-
396748-000, 15-396749-000, 15-396753-000, 16-414781-
144, 17-422881-000, 17-427606-000, 18-435133-000, 18-
435653-000, 18-442172-000, 18-443690-084, 18-444963-
000, 18-445340-000, 18-446390-083, 18-446395-000, 18-
447279-000, 19-448738-000, 19-448843-000, 19-448878-
000, 19-448879-000, 19-448882-000, 19-450628-000, 19-
2962-000, 19-453068-000, 19-454695-000, 19-454737-
000, 19-454807-000, 19-454812-000, 20-457462-000, 20-
457796-000, 20-458199-000, 20-458286-000
9