IR 05000482/2023002

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000482/2023002
ML23192A287
Person / Time
Site: Wolf Creek 
Issue date: 07/11/2023
From: Greg Werner
NRC/RGN-IV/DORS/PBB
To: Reasoner C
Wolf Creek
Werner G
References
IR 2023002
Download: ML23192A287 (38)


Text

July 11, 2023

SUBJECT:

WOLF CREEK GENERATING STATION - INTEGRATED INSPECTION REPORT 05000482/2023002

Dear Cleve Reasoner:

On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On July 6, 2023, the NRC inspectors discussed the results of this inspection with Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. Both findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Wolf Creek Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gregory E. Werner, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2023002

Enterprise Identifier:

I-2023-002-0005

Licensee:

Wolf Creek Nuclear Operating Corporation

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

April 1 to June 30, 2023

Inspectors:

B. Baca, Health Physicist

C. Henderson, Senior Resident Inspector

R. Kopriva, Senior Reactor Inspector

J. Melfi, Project Engineer

E. Simpson, Nuclear Systems Scientist

J. Vera, Resident Inspector

Approved By:

Gregory E. Werner, Chief

Reactor Projects Branch B

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Maintain Fire Protection Compensatory Measures During Control Room Ventilation Isolation Signal Actuation Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2023002-01 Open/Closed None (NPP)71111.05 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.d, for the licensees failure that written procedures shall be maintained covering fire protection program implementation. Specifically, the licensee failed to maintain Procedure AP 10-103, Fire Protection Impairment Control, revision 39, which required a fire compensatory measure to maintain engineered safety feature switchgear rooms A and B halon system functional during a control room ventilation isolation actuation.

Failure to Implement Emergency Exhaust System Surveillance Testing Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000482/2023002-02 Open/Closed

[H.5] - Work Management 71111.13 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.e., for the licensees failure that written procedures shall be implemented for Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). Specifically, the licensee failed to properly implement surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.

Additional Tracking Items

None.

PLANT STATUS

Wolf Creek Generating Station began the inspection period at full power. On June 2, 2023, the licensee reduced power to 62 percent at the request of the transmission operator to facilitate planned maintenance of the 345 kV Waverly/LaCygne line and scheduled surveillance testing of the main turbine valves, and the unit was return to full power the same day. On two occasions during the quarter the licensee reduced power to 70 percent for flexible power operations (based on daily market demand) and returned to full power after each occasion.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of summer readiness for the following systems:

diesel generator rooms and switchyard on June 8, 2023

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)train A control room emergency ventilation system on April 8, 2023 (2)energizing non-safety-related 13.8 kV PA02 bus using emergency diesel generator A/B on April 27, 2023 (3)train A control room air conditioning system on May 11, 2023 (4)emergency diesel generator A exhaust system and silencer on May 25, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)engineered safety feature switchgear rooms A and B fire impairment during control ventilation isolation signal lineup surveillance testing, fire areas C-9 and C-10, on April 8, 2023 (2)train B control room air conditioning room, fire area A-21, on April 16, 2023 (3)engineered safety feature switchgear rooms fire response and halon actuation, fire areas C-9 and C-10, on April 20, 2023 (4)train A control room air conditioning room, fire area A-22, on April 24, 2023 (5)control room envelope habitability testing fire impairments, fire areas A-21, A-22, C-10, C-15, C-16, and C-35, on May 19, 2023 (6)emergency diesel generator A planned 14-day outage allowance hourly fire watch requirements, fire area CC-1, on May 23, 2023 (7)steam tunnel emergency access hatch failure to latch and temporary closing device modification fire impairment, fire areas A-6 and A-23, on May 30, 2023

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) train A control room air conditioning system heat exchanger on May 25, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during flexible power operations (based on daily market demand) on April 5, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the licensed operator simulator evaluation scenarios on April 24, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)control room air conditioning and emergency ventilation system maintenance effectiveness on April 26, 2023 (2)auxiliary building heating, ventilation, and air conditioning system degraded airflow (a)(1) actions on May 9, 2023

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1)load shedder and emergency load sequencer card failures on June 14, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)train B centrifugal charging system technical equipment outage on April 4, 2023 (2)train B class 1E air conditioning system extended technical specification equipment outage due to not being able to obtain the required vacuum on the refrigeration system on April 27, 2023 (3)train A control room air conditioning technical equipment outage on May 9, 2023 (4)train A emergency exhaust system failed charcoal adsorber in-place leakage surveillance testing emergent work on May 16, 2023 (5)emergency diesel generator A 7-day technical specification equipment outage on May 24, 2023 (6)train B safety injection pump breaker failure to charger emergent work on June 9, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)control room habitability during halon discharge in the engineered safety feature switchgear room during a control room ventilation isolation lineup operability determination on April 20, 2023 (2)train B component cooling water room cooler motor continued use operability determination on April 25, 2023 (3)bypass feed regulation valves A and B test failure operability determination on May 8, 2023 (4)train A control room air conditioning system potential degraded airflow and instrument error operability determination on May 18, 2023 (5)load shedder and emergency load sequencer actuation logic test performed by automatic test indicator potential does capture all failure modes operability determination on May 22, 2023 (6)trains A and B emergency exhaust system inoperable for failed surveillance testing and incorrect breaker operation past operability determination on June 1, 2023

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (3 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1)updated compensatory measures for engineered safety switchgear rooms A and B fire on May 15, 2023 (2)control room ventilation isolation signal system chlorine monitors spare in-place on May 22, 2023 (3)emergency diesel generator A number 5 crankcase cover gasket replacement on May 31, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (9 Samples)

(1)train B centrifugal charging pump post-maintenance testing on April 5, 2023 (2)train A centrifugal charging pump room cooler post-maintenance testing on April 24, 2023 (3)train B centrifugal charging pump minimum flow valve, BGHV8111, and component cooling water return isolation valve, BGV0268, post-maintenance testing on April 25, 2023 (4)train B class 1E electrical air conditioning system technical specification outage post-maintenance testing on May 11, 2023 (5)train A control room air conditioning technical specification equipment outage post-maintenance testing on May 12, 2023 (6)train A essential service water strainer trash valve failed post-maintenance testing on May 23, 2023 (7)emergency diesel generator A technical specification equipment outage post-maintenance testing on May 30, 2023 (8)emergency diesel generator A ventilation damper post-maintenance and fan functionality testing on June 15, 2023 (9)train B safety injection pump breaker failure to charge closing spring repair post-maintenance testing on June 20, 2023

Surveillance Testing (IP Section 03.01) (4 Samples)

(1)control room emergency ventilation system actuation logic testing on May 22, 2023 (2)control room and building habitability testing on May 22, 2023 (3)control room emergency ventilation system radiation monitor surveillance testing on June 20, 2023 (4)train A control room air conditioning air flow surveillance testing on June 21, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1)train A residual heat removal heat exchanger outlet isolation valve on April 18, 2023

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1)reactor coolant system leakage detection testing on April 16, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) FLEX diesel generator fuel oil testing and replacement requirements on June 27, 2023

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) observed licensed operator requalification drill and exercise performance on April 27,

RADIATION SAFETY

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1)unit vent (fuel/auxiliary building, access control areas, containment purge, condenser air discharge), GT-RE-21A and -21B (2)radwaste building vent (radwaste building, waste gas decay tank discharge),

GH-RE-10A and -10B (3)steam generator blowdown discharge monitor, BM-RE-52 (4)liquid radwaste discharge monitor, HB-RE-18

Sampling and Analysis (IP Section 03.02) (3 Samples)

Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:

(1)unit vent sampling for gas release permit U1GC2023-070 (2)steam generator blowdown sampling for liquid release permit U1LC2023-020

(3) The NRC credits a baseline sample from the International Atomic Energy Agency (IAEA) Operational Safety Review Team (OSART) review conducted March 6 through March 23, 2023 (see memo dated July 5, 2023, ADAMS accession number ML23179A213).

Dose Calculations (IP Section 03.03) (3 Samples)

The inspectors evaluated the following dose calculations:

(1) The doses to members of the public associated with liquid effluent release permit 2023-0203.
(2) The doses to members of the public associated with gaseous effluent sampling and analyses for gaseous release permit 2023-070.
(3) The NRC credits a baseline sample from the IAEA OSART review conducted March 6 through March 23, 2023.

Abnormal Discharges (IP Section 03.04) (1 Sample)

The inspectors evaluated the following abnormal discharges:

(1) On September 9, 2020, the licensee inadvertently released approximately 510-gallons of liquid effluent from a misidentified liquid waste monitor tank. The licensee evaluated the radiological dose consequences of the release and determined that no limits had been exceeded. The release was documented in release permit U1LB2020-038.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples. A portion of the baseline sample was credited from the IAEA's OSART review conducted March 6 through March 23, 2023.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program. A portion of the baseline sample was credited from the IAEA's OSART review conducted March 6 through March 23, 2023.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the groundwater protection initiative program to identify incomplete or discontinued program elements. The licensee is implementing their groundwater protection program monitoring according to NEI 07-07, August

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) April 1, 2022, through March 31, 2023

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) April 1, 2022, through March 31, 2023

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) April 1, 2022, through March 31, 2023

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) April 1, 2022, through March 31, 2023

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)load shedder and emergency load sequencer relay driver card age related corrective actions and extent of condition on May 31, 2023 (2)confirmatory order EA 18-165 2020 self-assessment and effectiveness review on June 20, 2023 (3)security performance improvement action plan review on June 26, 2023

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensee's corrective action program for potential adverse trends that might be indicative of a more significant safety issue associated with human performance events declining trend on June 27,

INSPECTION RESULTS

Failure to Maintain Fire Protection Compensatory Measures During Control Room Ventilation Isolation Signal Actuation Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2023002-01 Open/Closed None (NPP)71111.05 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.d, for the licensees failure that written procedures shall be maintained covering fire protection program implementation. Specifically, the licensee failed to maintain Procedure AP 10-103, Fire Protection Impairment Control, revision 39, which required a fire compensatory measure to maintain engineered safety feature switchgear rooms A and B halon system functional during a control room ventilation isolation actuation.

Description:

The inspectors reviewed the licensees Updated Safety Analysis Report (USAR),normal operating procedures, and surveillance procedures for the control room ventilation isolation signal (CRVIS) and the fire protection program. Specifically, the inspectors reviewed surveillance Procedure STS GK-005A, Control Room Ventilation Isolation Response Time Test - Train A, revision 2, and Procedure AP 10-100, Fire Protection Program, revision 25, and identified the following:

The licensees fire protection program uses a defense-in-depth approach to fire protection to ensure that the plant can be safely shut down and public health and safety is maintained in the event of a fire. This protection is accomplished through automatic detection and suppression systems, trained personnel, fire emergency procedures, and administrative controls.

Procedure AP 10-100 provides the list of procedures for the licensees fire protection program. These procedures implement the fire protection program as described in the USAR which included:

o Procedure AP 10-103, Fire Protection Impairment Control, revision 39, defines the compensatory measures required for out-of-service or degraded fire protection features.

o Off normal Procedure OFN KC-016, Fire Response, revision 52, was developed to provide instructions for establishing response to, control of, and recovery from fire events.

o Alarm response Procedure ALR KC-888, Fire Protection Panel KC-008 Alarm Response, revision 33, provides control room personnel with basic instructions for responding to each alarm, instructions for clearing the alarm, and a list of the field instruments which could generate the alarm.

Procedure STS GK-005A manually initiates train A(B) CRVIS by depressing the actuate pushbutton on SA HS-9(13), which controls building ventilation train A(B) isolation. This inserts the CRVIS signal and opens control room filtration system A(B) supply dampers. If control room filtration system supply dampers are closed with a CRVIS signal present, they will reopen once their associated close signal is removed. The only way to maintain the supply dampers closed is to reset the CRVIS signal prior to closing them or remove power from the dampers prior to removing the close signal by removing control power fuses in the control room. However, during an engineered safety feature (ESF) switchgear room fire, the control room radiation monitor lost power and both trains of CRVIS will actuate and seal in.

Therefore, the only way to ensure the control room filtration system A(B) supply dampers remain closed was to remove power to maintain the ESF switchgear room A and B halon boundary in event of the fire. This is due to one of two control radiation monitor loss of power and causing a CRVIS actuation that cannot be reset. The licensee did have guidance in their normal operating Procedure SYS GK-122, Manual CRVIS Line-Up, revision 25, to remove power from the control room filtration system supply dampers by removing fuses. However, SYS GK-122 was not referenced in procedures STS GK-005A, AP 10-103, ALR KC-888, and OFN KC-016. Additionally, SYS GK-122 was not referenced as one of the procedures that implements the licensees fire protection program in accordance with procedure AP 10-100.

The licensee would have to rely on operator knowledge during ESF switchgear room fire to identify the need to use the guidance in SYS GK-122.

From the above, the inspectors determined the compensatory measure for the ESF switchgear rooms degraded halon barrier during CRVIS in accordance with procedure AP 10-103, attachment E, was not maintained. Specifically, the licensee failed to remove power from the control room filtration system A(B) supply dampers by removing fuses prior to releasing GK HIS-83 or 160 close pushbuttons to maintain the ESF switchgear room A and B halon boundary. The inspectors informed the licensee of the issue. The licensee then entered it into their corrective action program as condition reports 10023674 and 10023797.

Corrective Actions: The licensee established required reading for maintaining the control room filtration system A(B) supply dampers closed in case of a fire in the ESF switchgear and updated procedures AP 10-103, ALR KC-888, and OFN KC-016.

Corrective Action References: Condition reports 10023674 and 10023797

Performance Assessment:

Performance Deficiency: The licensees failure to maintain procedure AP 10-103, attachment E, compensatory measure for maintaining the ESF switchgear rooms A and B halon system functional during CRVIS actuation was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to maintain compensatory measures for maintaining the ESF switchgear rooms halon boundary functional during CRVIS actuation in the event of a fire.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix F, Fire Protection and Post - Fire Safe Shutdown [Safety Determination Process]

SDP. The inspectors assigned the finding a fire Category 1.4.1 using Inspection Manual Chapter 0609, Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheet, dated May 2, 2018, because the finding involved fire prevention and administrative controls. The inspectors determined that the finding had very low safety significance (Green) because the finding:

(1) did not increase the likelihood of a fire, delay detection of a fire, or resulted in a more significant fire than previously analyzed such that credited safe shutdown strategy could be adversely impacted; and
(2) the degraded fire confinement element continued to provide adequate fire endurance to prevent fire propagation through the fire confinement element given the combustible loading and location of equipment important to safe shutdown in the fire area of concern.

Cross-Cutting Aspect: Not Present Performance. Specifically, the performance deficiency occurred in 2003 when the licensee incorporated operating experiences associated with fire occurring in the ESF switchgear rooms when performing CRVIS surveillance testing.

Enforcement:

Violation: Technical specification 5.4.1.d requires that written procedures shall be established, implemented, and maintained covering fire protection program implementation.

Procedure AP 10-103, Fire Protection Impairment Control, revision 39, attachment E defines the compensatory measures required for out-of-service or degraded fire protection features.

Contrary to the above, the licensee failed to maintain procedures covering the fire protection program implementation. Specifically, from January 2004 to May 2023, as defined in procedure AP 10-103, attachment E, the licensee failed to maintain compensatory measures to ensure control room filtration supply dampers remained closed to maintain ESF switchgear rooms A and B halon system function during CRVIS actuation.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.

Failure to Implement Emergency Exhaust System Surveillance Testing Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000482/2023002-02 Open/Closed

[H.5] - Work Management 71111.13 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.e, for the licensees failure that written procedures shall be implemented for Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). Specifically, the licensee failed to properly implement surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.

Description:

On May 16, 2023, the inspectors performed a walkdown of train A emergency exhaust system to verify the licensee established surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, prerequisites.

During this walkdown, the inspectors identified the licensee failed to correctly implement surveillance procedure STS PE-006. Specifically, the licensee failed to open the train A emergency exhaust system humidity control heating coil breaker. Instead, the licensee opened the train B emergency exhaust system humidity control heating coil breaker and caused train B emergency exhaust system to become inoperable for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The licensee entered this issue into their corrective action program and performed an event review.

The inspectors perform a walkdown of train B emergency exhaust system and reviewed the event review and concluded the licensee failed to implement the work management process.

The key items that resulted in this violation included:

The licensee protected train B emergency exhaust system with the exception of the motor control center containing train B emergency exhaust systems humidity control heating coil breaker. The reason the licensee protected train B emergency exhaust system was, because on May 15, 2023, train A emergency exhaust system was declared inoperable for a failed surveillance test.

The licensee designated the incorrect steps as not applicable prior to implementing surveillance procedure STS PE-006. Specifically, the licensee designated steps to open train A emergency exhaust system humidity control breaker as not applicable, instead of train B emergency exhaust system humidity control breaker.

The licensee failed to verify job site conditions for train A emergency exhaust system prior to commencing surveillance procedure STS PE-006, as required by step 7.9.2.

Specifically, the licensee failed to verify the train A emergency exhaust system humidity control breaker was open prior to the inspectors identifying the breaker was not open. The inspectors identified the incorrect breaker was opened, because they questioned why the train A emergency exhaust system humidity control heat coiling status lights where on when power to the unit was removed in accordance with STS PE-006.

The licensee failed to ensure the individual from the operational relief crew was fully aware of plant status associated with train A emergency exhaust system being inoperable and train B emergency exhaust system being protected.

Corrective Actions: The licensee restored train B emergency exhaust system operability by closing its humidity control heating coil breaker and performed train A emergency exhaust system past operability evaluation, and determined it was operable during the time emergency exhaust system B was inoperable.

Corrective Action References: Condition report 10024447

Performance Assessment:

Performance Deficiency: The licensees failure to open the train A emergency exhaust system humidity control heating coil breaker, and instead opened train B emergency exhaust system humidity control heating coil breaker, which caused inoperability for train B emergency exhaust system, was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the human performance attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the licensees failure to open the correct breaker during train A emergency exhaust system surveillance testing resulted in train B emergency exhaust system being inoperable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using Exhibit 3, Section C, the inspectors determined the finding was of very low safety significance (Green) because it only represented a degradation of the radiological barrier function of the auxiliary and fuel buildings.

Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the licensee failed to effectively plan and execute work by incorporating risk insights, job site conditions, the need for coordination with different groups, and to ensure individuals were aware of plant status, the nuclear safety risks associated with work in the field.

Enforcement:

Violation: Technical specification 5.4.1.e. requires that written procedures shall be established, implemented, and maintained covering all programs specified in Technical Specification 5.5, which includes Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). The licensee established surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, to perform in-place leak testing of the auxiliary/fuel building emergency exhaust system charcoal absorber.

Contrary to the above, on May 16, 2023, the licensee failed to properly implement written procedures specified in technical specification 5.5.11. Specifically, during the performance of surveillance procedure STS PE-006, the licensee opened the incorrect breaker rendering train B emergency exhaust system inoperable.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.

Observation: Semiannual Trend Review 71152S The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation available to help identify performance trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address the identified adverse trends. The inspectors did not review any cross-cutting themes because none existed at the site.

To verify the licensee was taking corrective actions to address identified adverse trends that might indicate the existence of a more significant safety issue, the inspectors noted a trend in human performance. Specifically, the inspectors noted ten condition reports from April 5, 2023, to May 26, 2023, associated with human performance events. Examples included:

Condition report 10024172: The licensee identified, during the performance of quality assurance assessment QA-2023-0581, a trend associated with procedure adherence with information use procedures.

Condition report 10024176: The licensee identified the incorrect sample location was used for sampling the spent fuel pool. The licensee sampled from normal location instead of the alternate location for when the refueling water storage tank was aligned for recirculation. The licensee failed to verify procedure prerequisites are met rather than assuming they are met based on general plant conditions.

Condition report 10024432: The licensee identified an individual verified the incorrect breaker during clearance order verification. The licensee failed to perform an adequate pre-job brief, perform a thorough review of the work site, human error reduction tool usage.

Condition report 10024447 and NCV 2023002-02: The inspectors identified the licensee failed to properly implement surveillance procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.

Condition report 10024456: The licensee identified train A essential service water pump missed surveillance. The train A essential service water pump was placed on an increased frequency (every 45 days) to perform vibration measures due to being in the alert range in accordance with the ASME OM Code. However, the licensed failed to perform the surveillance at 45 days due to not having a consistent process for changing surveillance frequency in accordance with the ASME OM Code.

Condition report 10024699: The licensee tripped emergency diesel generator A during post-maintenance testing due to not nulling the voltage regulatory prior to placing it into manual. The licensee failed to use human error reduction tools and the latent condition contained with the procedure where multiply actions are contained in one step.

Condition report 10024701: The licensee identified the failure to declare the train A offsite circuit inoperable and missed surveillance requirement 3.8.1.1 when the emergency diesel generator A was paralleled with the offsite circuit and safety feature transformer A load tap changer was in automate. This occurred during post-maintenance testing of emergency diesel generator A. The procedure did not discuss the technical specification requirements associated with the safety-related transformer load tap changer in automatic and the impact on the offsite circuit.

Condition reports 10024329, 10024630, and 10023626: The inspectors identified three examples of the licensee failure to implement procedure AI 22C-013, Protected Equipment, revision 3. Specifically, two examples associated with not protecting equipment required by AI 22C-013 (H.8 Procedure Adherence) and one example of not determining if additional equipment was needed to be protected during technical specification equipment outages due to change in which work group performs the step.

In response to the above trend, the licensee issued site-wide communications, individual corrective actions, and performed a trend analysis documented in condition report

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 8, 2023, the inspectors presented the radioactive effluent and environmental monitoring inspection results to J. McCoy, Site Vice President, and other members of the licensee staff.

On July 6, 2023, the inspectors presented the integrated inspection results to J. McCoy, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

Condition Reports

10023597, 10020532

71111.01

Procedures

SYS EA-121

Service Water Flow Adjustment

71111.01

Procedures

SYS-OPS-009

Hot Weather Operations

71111.04

Calculations

NE-E-002

Analysis of Diesel Generator with A Concurrent Loss of ESW

71111.04

Corrective Action

Documents

Condition Reports

10022595, 10024618

71111.04

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

10024377, 10024594

71111.04

Drawings

M-12GK01

Piping and Instrumentation Diagram Control Building HVAC

71111.04

Drawings

M-12GK02

Piping and Instrumentation Diagram Control Building HVAC

71111.04

Drawings

M-12GK03

Piping and Instrumentation Diagram Control Building HVAC

71111.04

Drawings

M-12GK04

Piping and Instrumentation Diagram Control Building HVAC

71111.04

Engineering

Changes

EER 88-GK-14

GK Control Room Ventilation

71111.04

Miscellaneous

ED 95-0134

Operational Procedures Required to Address the Scenario of a

Loss of Essential Service Water Coincident with a Loss of

Offsite Power

01/09/1995

71111.04

Miscellaneous

M-018

Design Specification for Standby Diesel Generators for Wolf

Creek Generating Station

71111.04

Miscellaneous

WCNOC-PSA-

20

Human Reliability Analysis

71111.04

Miscellaneous

WCRE-01

Total Plant Setpoint Document

116

71111.04

Procedures

ALR 00-055A

ESW PMP A Press LO

11A

71111.04

Procedures

ALR 00-055B

ESW PMP B Press LO

2A

71111.04

Procedures

ALR 00-055C

ESW PMP Trouble

71111.04

Procedures

EMG E-0

Reactor Trip or Safety Injection

71111.04

Procedures

OFN EF-033

Loss of Essential Service Water

71111.04

Procedures

SYS GK-122

Manual CRVIS Line-Up

71111.04

Work Orders

WO

23-487314-000

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Corrective Action

Documents

Condition Reports

10024714, 10024716

71111.05

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

10023674, 10023797

71111.05

Drawings

E-13GK10A

Schematic Diagram Control Room Pressurization Fan and

Supply Dampers

71111.05

Drawings

E-13GK19

Schematic Diagram Air Return Dampers to Control Room

Filter Adsorber units

71111.05

Drawings

M-12GK03

Piping and Instrumentation Diagram Control Building HVAC

71111.05

Drawings

M-12GK04

Piping and Instrumentation Diagram Control Building HVAC

71111.05

Miscellaneous

BAP-23-0155

Breach Authorization Permit

05/27/2023

71111.05

Miscellaneous

E-1F9904

Fire Hazard Analysis

71111.05

Miscellaneous

E-1F9910

Post-Fire Safe Shutdown Area Analysis

71111.05

Miscellaneous

FPIP-21-0011

Fire Protection Impairment Control Permit

01/11/2021

71111.05

Miscellaneous

FPIP-23-0076

Fire Protection Impairment Permit

05/23/2023

71111.05

Miscellaneous

WCRE-35

Boundary Matrix

71111.05

Procedures

ALR KC-888

Fire Protection Panel KC-008 Alarm Response

71111.05

Procedures

AP 10-103

Fire Protection Impairment Control

71111.05

Procedures

AP 10-104

Breach Authorization

39A

71111.05

Procedures

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

71111.05

Procedures

BAP-23-0137

Breach Authorization Permit

05/18/2023

71111.05

Procedures

FPIP-23-0074

Fire Protection Impairment Permit

05/18/2023

71111.05

Procedures

M-12GK01

Piping and Instrumentation Diagram Control Building HVAC

71111.05

Procedures

OFN KC-016

Fire Response

71111.05

Procedures

STS GK-003

Manual CRIVS Actuation Operability Test

71111.05

Procedures

STS GK-005B

Control Room Ventilation Isolation Response Time Test -

Train B

71111.05

Procedures

STS PE-061

Control Room/Control Building Habitability Test

71111.05

Procedures

SYS GK-121

Control Building HVAC Valve Checklist

71111.05

Procedures

SYS GK-122

Manual CRVIS Line-Up

71111.07A

Calculations

GK-M-001

Cooling and Heating Load Calculation for Control Room HVAC 4

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

System Capabilities During Normal Plant Operation and

Accident Conditions - (SGK04A/B)

71111.07A

Calculations

GK-M-001 Rev. 4

Sequence CN002

Cooling and Heating Load Calculation for Control Room HVAC

System Capabilities During Normal Plant Operation and

Accident Conditions - (SGK04A/B)

71111.07A

Calculations

GK-M-009

Tube Plugging Criteria for Control Room A/C Unit SGK04A/B

Condensers and ESF Switchgear Rooms A/C Unit SGK05A/B

Condensers.

71111.07A

Calculations

GK-M-010

Tube Pitting Criteria for Control Room SGK04A/B and

Electrical Switch Gear Rooms SGK05A/B Condensing Units.

71111.07A

Corrective Action

Documents

Condition Report

10024426

71111.07A

Drawings

M-1HX001

Heat Exchanger Tube Sheet Map Document Index & General

Notes.

71111.07A

Drawings

N1387-637B-A1

SGK04A & SGK04B Air Conditioner Refrigeration Schematic.

71111.07A

Miscellaneous

M-622.1A-00089

Instruction Manual for SGK04A, SGK04B, SGK05A & SGK05B

Air Conditioning Condensers.

W18

71111.07A

Miscellaneous

M-622.1A-VDS-

1.02

SGK04A/B Condenser Vendor Data Sheet

04/11/2005

71111.07A

Procedures

AP 23L-002

Heat Exchanger Program

71111.07A

Procedures

MPE GK-003

Control Room and Class 1E A/C Units Preventive

Maintenance Activity.

71111.07A

Procedures

MPE GK-004

GK Unit Preparation for Work

71111.07A

Procedures

QCP-20-518

Visual Examination of Heat Exchangers and Piping

Components.

71111.07A

Procedures

STS MT-072

SGK04A Heat Exchanger Inspection.

71111.07A

Procedures

STS MT-073

SGK04B Heat Exchanger Inspection

71111.07A

Work Orders

WO

17-430780-000, 19-453962-000, 19-454117-000,

20-457760-000, 20-463375-000, 20-465267-000,

21-470597-000, 21-473007-000, 22-478969-000,

2-48-497-000

71111.11Q

Procedures

EGM FR-H1

Response to Loss of Secondary Heat Sink

71111.12

Corrective Action

Documents

Condition Reports

119268, 10011933, 10017443, 10017549, 10017590,

10017591, 10018051, 10019604, 10020190, 10020251,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

10021252, 10021303, 10021305, 10021612, 10021662,

10021867, 10022090, 10022347, 10023775, 10024005,

10024102, 10024153

71111.12

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

10024045, 10024353

71111.12

Drawings

M-12GK01

Piping and Instrumentation Diagram Control Building HVAC

71111.12

Drawings

M-1H3411

Sheet 1

Heating Ventilating and Air Cond. Control Building El. 2016-

71111.12

Engineering

Changes

CCP 014515

SGK04A/B Control Room A/C Fan Sheaves

71111.12

Engineering

Changes

DECP 012327

Approval of Remanufactured ESFAS and LSELS Circuit

Boards

71111.12

Miscellaneous

M-10GK

Control Building Ventilation System

71111.12

Miscellaneous

PMR 04773

Instrument Loop GKAI-2/3 Spared in Place

71111.12

Procedures

ALR 00-063A

CRVIS

18A

71111.12

Procedures

AP 16E-002

Post Maintenance Testing Development

21A

71111.12

Procedures

EDI 23M-020

Engineering Desktop Instruction Determining the Safety

Significance of Structures, Systems and Components within

the Scope of the Maintenance Rule

71111.12

Procedures

MPE VD-001

M627A Ventilation Damper Maintenance

71111.12

Procedures

STS GK-001A

Control Room Emergency Vent System Train A Operability

Test

71111.12

Procedures

STS IC-208A

4KV Loss of Voltage and Degraded Voltage TADOT NB01 Bus

- SEP GRP 1

71111.12

Procedures

STS IC-255A

Channel Operational Test Control Room Air Intake Radiation

Monitor GK RE-005

16A

71111.12

Procedures

STS KJ-001A

Integrated D/G and Safeguards Actuation Test - Train A

71111.12

Procedures

STS KJ-001B

Integrated D/G and Safeguards Actuation Test - Train B

71111.12

Procedures

SYS GK-122

Manual CRVIS Line-Up

71111.12

Work Orders

WO

07-292179-000, 07-292179-001, 07-292179-002,

13-381415-000, 21-469804-000, 21-472949-000,

2-478817-000, 22-480496-000, 22-480496-001,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-480251-000, 22-480355-000, 22-480355-001,

2-480537-000, 22-481525-000, 22-481525-001,

2-483406-000, 23-483725-001, 23-484594-000

71111.13

Corrective Action

Documents

Condition Reports

115848, 10011604, 10011805, 10024434, 10024600

71111.13

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

10023595, 10023622, 10023626, 10024329, 10024447,

10024468, 10024469, 10024545, 10024630, 10025138

71111.13

Drawings

M-12BG03

Piping and Instrumentation Diagram Chemical and Volume

Control System

71111.13

Drawings

M-12GG01

Piping and Instrumentation Diagram Fuel Building HVAC

71111.13

Procedures

AI 22C-013

Protected Equipment Program

71111.13

Procedures

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

71111.13

Procedures

AP 22C-007

Risk Management and contingency Planning

71111.13

Procedures

OFN RP-017

Control Room Evacuation

71111.13

Procedures

STS PE-003

Emergency Exhaust System Flow Rate and Combined

Pressure Drop Test

71111.13

Procedures

STS PE-006

Charcoal Adsorber In-Place Leak Test Safety Related Units

71111.13

Procedures

STS PE-009

Control Rom Ventilation System Flow Rate and Combined

Pressure Drop Test

8B

71111.13

Procedures

SYS GK-201

Mitigating Actions for Inoperable SGK05 Train

71111.13

Work Orders

WO

2-479602-009, 22-481572-000, 22-481604-000, 23-488892-

000

71111.15

Calculations

AN-07-009

GOTHIC Model for CCW Pump Room Temperature

71111.15

Calculations

GL-M-007

Calculate Cooling Load in SR Pump Rooms Post LOCA: 1107,

1108, 1109, 1110, 1111, 1112, 1113, 1114, 1401 and 1406

71111.15

Corrective Action

Documents

Condition Reports

137333, 137389, 10012721, 10012959, 10020153, 10022090,

10022115, 10022124, 10022347, 10022888, 10023674,

10024145, 10024434, 10024447, 10024483, 10024499

71111.15

Corrective Action

Documents

Resulting from

Inspection

Condition Report

10024625

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Drawings

M-12GG01

Piping and Instrumentation Diagram Fuel Building HVAC

71111.15

Drawings

M-12GK01

Piping and Instrumentation Diagram Control Building HVAC

71111.15

Drawings

M-12GK02

Piping and Instrumentation Diagram Control Building HVAC

71111.15

Drawings

M-12GK03

Piping and instrumentation Diagram Control Building HVAC

71111.15

Drawings

M-12GK04

Piping and Instrumentation Diagram Control Building HVAC

71111.15

Procedures

AP 16E-002

Post Maintenance Testing Development

21A

71111.15

Procedures

AP 23-009

Control Room Envelope Habitability Program

3A

71111.15

Procedures

AP 23L-002

Heat Exchanger Program

71111.15

Procedures

AP 26C-004

Operability Determination and Functionality Assessments

71111.15

Procedures

MGE EOOP-05

Insulation Resistance Testing

28A

71111.15

Procedures

MPE RC-001

Room Cooler Maintenance

71111.15

Procedures

STN PE-036

Safety Related Room Cooler Heat Transfer Verification and

Performance Trending

71111.15

Procedures

STS AE-209B

Main Feed Reg Valve Bypass valve Inservice Test Train B

71111.15

Procedures

STS IC-208A

4KV Loss of Voltage and Degraded Voltage TADOT NB01 Bus

- SEP GRP 1

71111.15

Procedures

STS PE-004

Aux Building and Control Room Pressure Test

71111.15

Procedures

STS PE-006

Charcoal Adsorber In-Place Leak Test Safety Related Units

71111.15

Procedures

STS PE-010

Control Room A/C System Flow Rate Verification A Train

4A, 4B

71111.15

Work Orders

WO

07-292179-000, 07-292179-001, 07-292179-002,

2-362198-003, 16-411901-000, 16-413357-000,

17-434100-000, 18-445253-000, 19-449804-000,

20-466782-000, 20-467125-000, 21-468729-000,

21-476761-000, 22-480251-000, 22-480994-000,

2-480994-001, 22-483479-000

71111.18

Corrective Action

Documents

Condition Reports

2004-0917, 10004345, 10020925, 10021128, 10022158,

10022470, 10023456, 10023593, 10023594, 10023708,

10024096, 10024141, 10024459, 10024460, 10024472,

10024481, 10024531, 10024590, 10024599, 10024642,

10024646, 10024649, 10024653, 10024654, 10024663,

10024666, 10024699, 10024698, 10024699, 10024700,

10024703, 10024710

71111.18

Corrective Action

Documents

Condition Reports

10023674, 10023797

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.18

Drawings

E-13GK19

Schematic Diagram Air Return Dampers to Control Room

Filter Absorber Units

71111.18

Drawings

J-201-00133

Wiring Diagram PR-068

W15

71111.18

Drawings

J-201-00139

Wiring Diagram RP-068

W16

71111.18

Drawings

M-12GK01

Piping and Instrumentation Diagram Control Building HVAC

71111.18

Engineering

Changes

DECP 020700

EDG Crankcase Cover Gasket

71111.18

Miscellaneous

2010-005

USAR Change Request

01/11/2010

71111.18

Miscellaneous95-033

USAR Change Request

2/15/1995

71111.18

Miscellaneous97-053

USAR Change Request

2/05/1997

71111.18

Miscellaneous

FPIP-23-0068

Fire Protection Impairment

71111.18

Miscellaneous

M-018

Design Specification for Standby Diesel Generators for Wolf

Creek Generating Station

71111.18

Miscellaneous

M-018-00309

Instruction Manual for Emergency Diesel Generator System

W141

71111.18

Miscellaneous

PMR 04773

Instrument Loop GKAI-2/3 Spared in Place

71111.18

Miscellaneous

SCA-92-0583

Safety Classification Analysis

71111.18

Procedures

ALR 00-063A

CRVIS

18A

71111.18

Procedures

ALR KC-888

Fire Protection Panel KC-008 Alarm Response

71111.18

Procedures

AP 05-007

Determination of Safety Classification

15A

71111.18

Procedures

AP 14B-001

Chemical Control Program

71111.18

Procedures

AP 23-009

Control Room Envelope Habitability Program

3A

71111.18

Procedures

OFN KC-016

Fire Response

71111.18

Procedures

OFN KJ-032

Local Emergency Diesel Startup

71111.18

Procedures

OFN PR-013

Control Room Not Habitable

71111.18

Procedures

SYS GK-122

Manual CRVIS Line-up

71111.24

Calculations

EG-M-046

Hydraulic Analysis of the Component Cooling Water System

for Break Flow Determination and Orifice Sizing

71111.24

Calculations

GK-M-001

Cooling and Heating Load Calculation for Control Room HVAC

System Capabilities during Normal Plant Operation and

Accident Conditions- (SGK04A/B)

71111.24

Corrective Action

Documents

Condition Reports

10021799, 10021800, 10021801, 10022090, 10024604,

10025080, 10025468

71111.24

Corrective Action

Condition Reports

10023591, 10024378, 10025467

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Resulting from

Inspection

71111.24

Drawings

E-13EJ12

Schematic Diagram Instrumentation

71111.24

Drawings

M-12EG02

Piping and Instrumentation Diagram Component Cooling

Water

71111.24

Drawings

M-12EJ01

Piping and Instrumentation Diagram Residual Heat Removal

System

71111.24

Miscellaneous

BAP-23-0136

Breach Authorization Permit

05/18/2023

71111.24

Miscellaneous

E-025-00007

Sheet 137

CCP B Miniflow ISO

W16

71111.24

Miscellaneous

WCRE-34

Fourth 10-Year Interval Inservice Testing Basis Document

71111.24

Miscellaneous

WCRE-38

Surveillance Frequency Control Program Test Interval List

71111.24

Procedures

ALR 00-063A

CRVIS

18As

71111.24

Procedures

AP 16E-002

Post Maintenance Testing Development

21A

71111.24

Procedures

AP 21A-002

Diverse and Flexible Coping Mitigation Strategies (FLEX)

Program

3A

71111.24

Procedures

AP 21G-001

Control of Locked Component Status

78C

71111.24

Procedures

AP 23-009

Control Room Envelope Habitability Program

3A

71111.24

Procedures

AP 23D-001

Motor Operated Valve Program

4A

71111.24

Procedures

AP 29G-001

RCS Unidentified Leak Rate Monitoring Program

71111.24

Procedures

CKL ZL-001

Auxiliary Building Reading Sheets

117

71111.24

Procedures

HVAC-001

NH91 Hydramotor Damper Actuator Changeout

71111.24

Procedures

MGE LT-008

Routine Electrical Limitorque Operator Maintenance

8B

71111.24

Procedures

MGE LT-100

Limitorque Valve Operator General Notes & Details

71111.24

Procedures

MPE GK-004

GK Unit Preparation for Work

71111.24

Procedures

MPM LT-001

Limitorque Operator Minor Maintenance, Lubrication, and

Inspection

15A

71111.24

Procedures

STN BG-202

Chemical & Volume Control System Valve Test

3A

71111.24

Procedures

STN EF-201

ESW System Valve Test

71111.24

Procedures

STS BB-006

RCS Water Inventory Balance Using NPIS Computer

71111.24

Procedures

STS BG-100A

Centrifugal Charging System A Train Inservice Pump Test

71111.24

Procedures

STS BG-100B

Centrifugal Charging System B Train Inservice Pump Test

56A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

STS EJ-209A

Train A RHR System Inservice Valve Test

71111.24

Procedures

STS GK-002A

Control Room A/C Unit Operability Test

71111.24

Procedures

STS GK-003

Manual CRVIS Actuation Operability Test

71111.24

Procedures

STS IC-263

STS IC-263, Channel Calibration Containment Normal Sump

Level Loops LF LPL-0089 and LF LPL-0094

71111.24

Procedures

STS IC-455B

Channel Calibration Control Room Air Intake Radiation

Monitor GK RE-004

18A

71111.24

Procedures

STS ML-001

Monthly Surveillance Log

50A

71111.24

Procedures

STS PE-004

Aux Building and Control Room Pressure Test

71111.24

Procedures

STS PE-010A

Control Room A/C System Flow Rate Verification A Train

4B

71111.24

Procedures

STS PE-061

Control Room/Control Building Habitability Test

71111.24

Procedures

SYS BG-201

Shifting Charging Pumps

71111.24

Procedures

SYS GK-122

Manual CRVIS Line-Up

71111.24

Procedures

SYS GK-123

Control Building A/C Units Startup and Shutdown

71111.24

Procedures

SYS KJ-121

Diesel Generator NE01 and NE02 Lineup for Automatic

Operation

71111.24

Procedures

SYS KJ-123

Post Maintenance Run of Emergency Diesel Generator A

71111.24

Procedures

SYS KJ-124

Post Maintenance Run of Emergency Diesel Generator B

71111.24

Work Orders

WO 6006, 12-362198-003, 11-337724-000, 14-383081-000,

16-411901-000, 16-413357-000, 17-421829-000,

17-428577-000, 17-434100-000, 18-444324-000,

18-444324-005, 18-444324-006, 19-447730-000,

19-447821-000, 19-449804-000, 20-461790-000,

20-462103-000, 20-466517-000, 20-466782-000,

21-472265-000, 21-473302-000, 21-473916-000,

21-474115-000, 22-477193-000, 22-477646-000,

2-478271-000, 22-480251-000, 22-481222-000,

2-481236-000, 22-481236-001, 22-481377-002,

2-481572-000, 22-481572-001, 22-481604-000,

2-482165-000, 22-482165-001, 22-482194-000,

2-482194-001, 22-482755-000, 22-482755-001,

2-482755-002, 22-483329-000, 22-483384-000,

2-483467-000, 23-484974-000, 23-488896-000,

23-488896-001, 23-489078-000, 23-489078-001,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.06

Corrective Action

Documents

Condition Reports

00144908, 10002788, 10003795, 10004226, 10004227,

10007158, 10015888, 10015954, 10024303, 10024323,

10024357, 10024376, 10024434, 10024499

71124.06

Procedures

AP 02-007

Abnormal Conditions Guidelines

71124.06

Procedures

AP 06-002

Radiological Emergency Response Plan

71124.06

Procedures

APF 06-002-02

Emergency Action Levels Technical Bases

71124.06

Procedures

CHS AX-G01

Unit vent Sampling and/or Exchange of Filters

71124.06

Procedures

CHS SJ-144A

SJ-144 Sampling Instructions

71124.06

Procedures

STN SP-021A

Channel Operational Test Unit Vent Radiation Monitor GT RE-

21A

5C

71124.06

Procedures

STN SP-021B

Analog Channel Operational Test Unit Ventilation System

Radiation Monitor GT RE-0021B

14C

71124.06

Procedures

STN SP-045

Channel Operational Test Secondary Liquid Waste System

Radiation Monitor HF RE-0045

71124.06

Procedures

STN SP-052

Channel Operational Test Monitor BM RE-0052

71124.06

Procedures

STN SP-110A

Channel Calibration Radwaste Building Vent Radiation Monitor

GH RE-001A

8B

71124.06

Procedures

STN SP-195

Channel Calibration Hi/Lo TDS Discharge to Wastewater

Treatment Radiation Monitor HF RE-0095

71124.06

Procedures

STS PE-006

Charcoal Adsorber In-Place Leak Test

71124.07

Corrective Action

Documents

Condition Report

(CR)

103228, 10002277, 10005766, 10009759, 10011103,

10011229, 10011368, 10011380, 10012983, 10024434,

10024499

71124.07

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR)

10024452, 10024683, 10024800, 10024809, 10024880,

10024891, 10024893, 10025025, 10025027, 10025028

71124.07

Miscellaneous

22 Meteorological Data Report

03/27/2023

71124.07

Miscellaneous

21 Annual Radiological Environmental Operating Report

04/26/2022

71124.07

Miscellaneous

22 Annual Radiological Environmental Operating Report -

Report 46

04/27/2023

71124.07

Miscellaneous

20 Annual Radiological Environmental Operating Report

04/28/2021

71124.07

Miscellaneous

NUPIC Audit

  1. 2022-SA-003

F & J Specialty Products, Inc.

03/14/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Miscellaneous

NUPIC Audit

Report #25197

ATI Environmental Inc.

01/10/2023

71124.07

Miscellaneous

NUPIC Audit

Report #25286

Augmented quality audit report of Landauer, Inc.

2/06/2021

71124.07

Miscellaneous

QH-2021-2214

REMP Review of 2018 through 2020 Wind Directions

06/28/2021

71124.07

Miscellaneous

QH-2023-2510

REMP Review of 2019 through 2021 Wind Directions

04/26/2023

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-01

01/01/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-15

01/15/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-16

01/16/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-17

01/17/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-25

01/25/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-01-29

01/29/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-02-17

2/17/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-03-14

03/14/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-04-04

04/04/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-08-04

08/04/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-09-12

09/12/2022

71124.07

Miscellaneous

STS CR-001

Shift Log for Modes 1, 2, 3: 2022-12-11

2/11/2022

71124.07

Procedures

AI 07B-002

Review of Radiological Environmental Laboratory Analysis

Results

71124.07

Procedures

AI 07B-005

Radiological Environmental Monitoring Program

Implementation

71124.07

Procedures

AI 07B-009

Collection, Preparation and Shipment of Sediment and Soil

Samples

71124.07

Procedures

AI 07B-011

Collection, Preparation and Shipment of Water Samples

71124.07

Procedures

AI 07B-012

Collection, Preparation and Shipment of Crop, Vegetable, Fruit

and Pasturage Samples

71124.07

Procedures

AI 07B-015

Land Use Census

71124.07

Procedures

AI 07B-033

Annual Radiological Environmental Operating Report

Generation

71124.07

Procedures

AI 07B-034

Radiological Environmental Monitoring Program Air Sampling

71124.07

Procedures

AI 230-001

Functional Importance Determination

7A

71124.07

Procedures

AI 28A-010

Screening Condition Reports

28A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.07

Procedures

AP 06-004

Equipment Important to Emergency Response

10A

71124.07

Procedures

AP 07B-003

Offsite Dose Calculation Manual

71124.07

Procedures

AP 07B-004

Offsite Dose Calculation Manual (Radiological Environmental

Monitoring Program)

71124.07

Procedures

AP 07E-001

Validation of Meteorological Data

71124.07

Procedures

AP 22A-001

Screening, Prioritization and Pre-Approval

24A

71124.07

Procedures

STS CR-001

Shift Log for Modes 1, 2, & 3

115A

71124.07

Procedures

STS IC-890A

Wind Speed Meteorological Instrumentation Channel

Calibration

71124.07

Procedures

STS IC-890B

Wind Direction/Deviation Meteorological Instrumentation

Channel Calibration

18A

71124.07

Procedures

STS IC-890C

10M/60M Ambient and Differential Temperature

Instrumentation Channel Calibration

23A

71124.07

Procedures

STS IC-890D

Sonic Wind Speed/Direction/Deviation Meteorological

Instrumentation Channel Calibration

71124.07

Work Orders

WO 2022-

478299-000

STS IC-890C: 10M/60M Ambient and Differential Temperature

Instrumentation Channel Calibration

09/14/2022

71124.07

Work Orders

WO 22-477168-

000

Troubleshoot Met Tower Instrumentation

04/26/2022

71124.07

Work Orders

WO 22-477168-

001

Replace Met Tower Data Logger

04/26/2022

71124.07

Work Orders

WO 22-481397-

000

STS IC-890A: Perform STS IC-890A Channel Calibration of

Wind Speed Meteorological Instrumentation

03/23/2023

71124.07

Work Orders

WO 22-481410-

000

STS IC-890B: Channel Calibration of Wind Direction

Meteorological Instrumentation

03/23/2023

71124.07

Work Orders

WO 22-481425-

000

STS IC-890D: Perform STS IC-890D Channel Calibration of

Sonic Wind Speed/Direction/Deviation

03/23/2023

71151

Miscellaneous

WCNOC-163

Mitigating System Performance Index (MSPI) Basis Document

71151

Procedures

AI 26A-008

NRC/INPO/WANO Performance Indicator and MOR Reporting

71151

Procedures

AP 26A-007

NRC Performance Indicators

71152A

Corrective Action

Documents

Condition Reports

119268, 131147, 143363, 2002-2250, 2003-2449, 10013374,

10019604, 10012170, 10012929, 10020190, 10020251,

10021053, 10021055, 10022347, 10023975, 10024331,

10024340

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152A

Miscellaneous

AP 20E-001

Industry Operating Experience Program

31A

71152A

Miscellaneous

QH-2016-171

2018 Maintenance Rule Periodic Assessment

71152A

Miscellaneous

QH-2020-2054

20 Maintenance Rule Periodic Assessment

71152A

Miscellaneous

QH-2022-2346

22 Maintenance Rule Periodic Assessment

71152A

Miscellaneous

SA-2022-0179

Confirmatory Order Item P - Perform an Annual Effectiveness

Review of the Corrective Actions Associated with NRC CO

71152A

Miscellaneous

WCRE-35

Boundary Matrix

71152A

Procedures

AP 18-001

Emerging Concerns

71152A

Procedures

AP 20E-001

Industry Operating Experience Program

31A

71152S

Corrective Action

Documents

Condition Reports

10023626, 10024172, 10024173, 10024176, 10024329,

10024432, 10024447, 10024456, 10024630, 10024699,

10024701, 10024702, 10024753

71152S

Miscellaneous

WCQPM

Wolf Creek Quality Program Manual

71152S

Procedures

AP 15C-001

Procedure Writers Guide

33A

71152S

Procedures

AP 15C-002

Procedure Use and Adherence

71152S

Procedures

AP 21E-001

Clearance Orders

71152S

Procedures

STS Ch-021

Spent Fuel Boron Concentration Determination

9A

71152S

Procedures

SYS KJ-123

Post Maintenance Run of Emergency Diesel Generator A

71152S

Procedures

SYS KJ-124

Post Maintenance Run of Emergency Diesel Generator B

75