IR 05000482/2023002
| ML23192A287 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/11/2023 |
| From: | Greg Werner NRC/RGN-IV/DORS/PBB |
| To: | Reasoner C Wolf Creek |
| Werner G | |
| References | |
| IR 2023002 | |
| Download: ML23192A287 (38) | |
Text
July 11, 2023
SUBJECT:
WOLF CREEK GENERATING STATION - INTEGRATED INSPECTION REPORT 05000482/2023002
Dear Cleve Reasoner:
On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On July 6, 2023, the NRC inspectors discussed the results of this inspection with Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
Two findings of very low safety significance (Green) are documented in this report. Both findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Wolf Creek Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Gregory E. Werner, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number:
05000482
License Number:
Report Number:
Enterprise Identifier:
I-2023-002-0005
Licensee:
Wolf Creek Nuclear Operating Corporation
Facility:
Wolf Creek Generating Station
Location:
Burlington, KS
Inspection Dates:
April 1 to June 30, 2023
Inspectors:
B. Baca, Health Physicist
C. Henderson, Senior Resident Inspector
R. Kopriva, Senior Reactor Inspector
J. Melfi, Project Engineer
E. Simpson, Nuclear Systems Scientist
J. Vera, Resident Inspector
Approved By:
Gregory E. Werner, Chief
Reactor Projects Branch B
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Maintain Fire Protection Compensatory Measures During Control Room Ventilation Isolation Signal Actuation Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2023002-01 Open/Closed None (NPP)71111.05 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.d, for the licensees failure that written procedures shall be maintained covering fire protection program implementation. Specifically, the licensee failed to maintain Procedure AP 10-103, Fire Protection Impairment Control, revision 39, which required a fire compensatory measure to maintain engineered safety feature switchgear rooms A and B halon system functional during a control room ventilation isolation actuation.
Failure to Implement Emergency Exhaust System Surveillance Testing Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000482/2023002-02 Open/Closed
[H.5] - Work Management 71111.13 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.e., for the licensees failure that written procedures shall be implemented for Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). Specifically, the licensee failed to properly implement surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.
Additional Tracking Items
None.
PLANT STATUS
Wolf Creek Generating Station began the inspection period at full power. On June 2, 2023, the licensee reduced power to 62 percent at the request of the transmission operator to facilitate planned maintenance of the 345 kV Waverly/LaCygne line and scheduled surveillance testing of the main turbine valves, and the unit was return to full power the same day. On two occasions during the quarter the licensee reduced power to 70 percent for flexible power operations (based on daily market demand) and returned to full power after each occasion.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of summer readiness for the following systems:
diesel generator rooms and switchyard on June 8, 2023
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)train A control room emergency ventilation system on April 8, 2023 (2)energizing non-safety-related 13.8 kV PA02 bus using emergency diesel generator A/B on April 27, 2023 (3)train A control room air conditioning system on May 11, 2023 (4)emergency diesel generator A exhaust system and silencer on May 25, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)engineered safety feature switchgear rooms A and B fire impairment during control ventilation isolation signal lineup surveillance testing, fire areas C-9 and C-10, on April 8, 2023 (2)train B control room air conditioning room, fire area A-21, on April 16, 2023 (3)engineered safety feature switchgear rooms fire response and halon actuation, fire areas C-9 and C-10, on April 20, 2023 (4)train A control room air conditioning room, fire area A-22, on April 24, 2023 (5)control room envelope habitability testing fire impairments, fire areas A-21, A-22, C-10, C-15, C-16, and C-35, on May 19, 2023 (6)emergency diesel generator A planned 14-day outage allowance hourly fire watch requirements, fire area CC-1, on May 23, 2023 (7)steam tunnel emergency access hatch failure to latch and temporary closing device modification fire impairment, fire areas A-6 and A-23, on May 30, 2023
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) train A control room air conditioning system heat exchanger on May 25, 2023
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during flexible power operations (based on daily market demand) on April 5, 2023.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated the licensed operator simulator evaluation scenarios on April 24, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)control room air conditioning and emergency ventilation system maintenance effectiveness on April 26, 2023 (2)auxiliary building heating, ventilation, and air conditioning system degraded airflow (a)(1) actions on May 9, 2023
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
(1)load shedder and emergency load sequencer card failures on June 14, 2023
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)train B centrifugal charging system technical equipment outage on April 4, 2023 (2)train B class 1E air conditioning system extended technical specification equipment outage due to not being able to obtain the required vacuum on the refrigeration system on April 27, 2023 (3)train A control room air conditioning technical equipment outage on May 9, 2023 (4)train A emergency exhaust system failed charcoal adsorber in-place leakage surveillance testing emergent work on May 16, 2023 (5)emergency diesel generator A 7-day technical specification equipment outage on May 24, 2023 (6)train B safety injection pump breaker failure to charger emergent work on June 9, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(1)control room habitability during halon discharge in the engineered safety feature switchgear room during a control room ventilation isolation lineup operability determination on April 20, 2023 (2)train B component cooling water room cooler motor continued use operability determination on April 25, 2023 (3)bypass feed regulation valves A and B test failure operability determination on May 8, 2023 (4)train A control room air conditioning system potential degraded airflow and instrument error operability determination on May 18, 2023 (5)load shedder and emergency load sequencer actuation logic test performed by automatic test indicator potential does capture all failure modes operability determination on May 22, 2023 (6)trains A and B emergency exhaust system inoperable for failed surveillance testing and incorrect breaker operation past operability determination on June 1, 2023
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (3 Samples)
The inspectors evaluated the following temporary or permanent modifications:
(1)updated compensatory measures for engineered safety switchgear rooms A and B fire on May 15, 2023 (2)control room ventilation isolation signal system chlorine monitors spare in-place on May 22, 2023 (3)emergency diesel generator A number 5 crankcase cover gasket replacement on May 31, 2023
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (9 Samples)
(1)train B centrifugal charging pump post-maintenance testing on April 5, 2023 (2)train A centrifugal charging pump room cooler post-maintenance testing on April 24, 2023 (3)train B centrifugal charging pump minimum flow valve, BGHV8111, and component cooling water return isolation valve, BGV0268, post-maintenance testing on April 25, 2023 (4)train B class 1E electrical air conditioning system technical specification outage post-maintenance testing on May 11, 2023 (5)train A control room air conditioning technical specification equipment outage post-maintenance testing on May 12, 2023 (6)train A essential service water strainer trash valve failed post-maintenance testing on May 23, 2023 (7)emergency diesel generator A technical specification equipment outage post-maintenance testing on May 30, 2023 (8)emergency diesel generator A ventilation damper post-maintenance and fan functionality testing on June 15, 2023 (9)train B safety injection pump breaker failure to charge closing spring repair post-maintenance testing on June 20, 2023
Surveillance Testing (IP Section 03.01) (4 Samples)
(1)control room emergency ventilation system actuation logic testing on May 22, 2023 (2)control room and building habitability testing on May 22, 2023 (3)control room emergency ventilation system radiation monitor surveillance testing on June 20, 2023 (4)train A control room air conditioning air flow surveillance testing on June 21, 2023
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
(1)train A residual heat removal heat exchanger outlet isolation valve on April 18, 2023
Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)
(1)reactor coolant system leakage detection testing on April 16, 2023
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
- (1) FLEX diesel generator fuel oil testing and replacement requirements on June 27, 2023
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
- (1) observed licensed operator requalification drill and exercise performance on April 27,
RADIATION SAFETY
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
Walkdowns and Observations (IP Section 03.01) (4 Samples)
The inspectors evaluated the following radioactive effluent systems during walkdowns:
(1)unit vent (fuel/auxiliary building, access control areas, containment purge, condenser air discharge), GT-RE-21A and -21B (2)radwaste building vent (radwaste building, waste gas decay tank discharge),
GH-RE-10A and -10B (3)steam generator blowdown discharge monitor, BM-RE-52 (4)liquid radwaste discharge monitor, HB-RE-18
Sampling and Analysis (IP Section 03.02) (3 Samples)
Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:
(1)unit vent sampling for gas release permit U1GC2023-070 (2)steam generator blowdown sampling for liquid release permit U1LC2023-020
- (3) The NRC credits a baseline sample from the International Atomic Energy Agency (IAEA) Operational Safety Review Team (OSART) review conducted March 6 through March 23, 2023 (see memo dated July 5, 2023, ADAMS accession number ML23179A213).
Dose Calculations (IP Section 03.03) (3 Samples)
The inspectors evaluated the following dose calculations:
- (1) The doses to members of the public associated with liquid effluent release permit 2023-0203.
- (2) The doses to members of the public associated with gaseous effluent sampling and analyses for gaseous release permit 2023-070.
- (3) The NRC credits a baseline sample from the IAEA OSART review conducted March 6 through March 23, 2023.
Abnormal Discharges (IP Section 03.04) (1 Sample)
The inspectors evaluated the following abnormal discharges:
- (1) On September 9, 2020, the licensee inadvertently released approximately 510-gallons of liquid effluent from a misidentified liquid waste monitor tank. The licensee evaluated the radiological dose consequences of the release and determined that no limits had been exceeded. The release was documented in release permit U1LB2020-038.
71124.07 - Radiological Environmental Monitoring Program
Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples. A portion of the baseline sample was credited from the IAEA's OSART review conducted March 6 through March 23, 2023.
Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program. A portion of the baseline sample was credited from the IAEA's OSART review conducted March 6 through March 23, 2023.
GPI Implementation (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees implementation of the groundwater protection initiative program to identify incomplete or discontinued program elements. The licensee is implementing their groundwater protection program monitoring according to NEI 07-07, August
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===
- (1) April 1, 2022, through March 31, 2023
BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)
- (1) April 1, 2022, through March 31, 2023
MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)
- (1) April 1, 2022, through March 31, 2023
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
- (1) April 1, 2022, through March 31, 2023
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)load shedder and emergency load sequencer relay driver card age related corrective actions and extent of condition on May 31, 2023 (2)confirmatory order EA 18-165 2020 self-assessment and effectiveness review on June 20, 2023 (3)security performance improvement action plan review on June 26, 2023
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensee's corrective action program for potential adverse trends that might be indicative of a more significant safety issue associated with human performance events declining trend on June 27,
INSPECTION RESULTS
Failure to Maintain Fire Protection Compensatory Measures During Control Room Ventilation Isolation Signal Actuation Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000482/2023002-01 Open/Closed None (NPP)71111.05 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.d, for the licensees failure that written procedures shall be maintained covering fire protection program implementation. Specifically, the licensee failed to maintain Procedure AP 10-103, Fire Protection Impairment Control, revision 39, which required a fire compensatory measure to maintain engineered safety feature switchgear rooms A and B halon system functional during a control room ventilation isolation actuation.
Description:
The inspectors reviewed the licensees Updated Safety Analysis Report (USAR),normal operating procedures, and surveillance procedures for the control room ventilation isolation signal (CRVIS) and the fire protection program. Specifically, the inspectors reviewed surveillance Procedure STS GK-005A, Control Room Ventilation Isolation Response Time Test - Train A, revision 2, and Procedure AP 10-100, Fire Protection Program, revision 25, and identified the following:
The licensees fire protection program uses a defense-in-depth approach to fire protection to ensure that the plant can be safely shut down and public health and safety is maintained in the event of a fire. This protection is accomplished through automatic detection and suppression systems, trained personnel, fire emergency procedures, and administrative controls.
Procedure AP 10-100 provides the list of procedures for the licensees fire protection program. These procedures implement the fire protection program as described in the USAR which included:
o Procedure AP 10-103, Fire Protection Impairment Control, revision 39, defines the compensatory measures required for out-of-service or degraded fire protection features.
o Off normal Procedure OFN KC-016, Fire Response, revision 52, was developed to provide instructions for establishing response to, control of, and recovery from fire events.
o Alarm response Procedure ALR KC-888, Fire Protection Panel KC-008 Alarm Response, revision 33, provides control room personnel with basic instructions for responding to each alarm, instructions for clearing the alarm, and a list of the field instruments which could generate the alarm.
Procedure STS GK-005A manually initiates train A(B) CRVIS by depressing the actuate pushbutton on SA HS-9(13), which controls building ventilation train A(B) isolation. This inserts the CRVIS signal and opens control room filtration system A(B) supply dampers. If control room filtration system supply dampers are closed with a CRVIS signal present, they will reopen once their associated close signal is removed. The only way to maintain the supply dampers closed is to reset the CRVIS signal prior to closing them or remove power from the dampers prior to removing the close signal by removing control power fuses in the control room. However, during an engineered safety feature (ESF) switchgear room fire, the control room radiation monitor lost power and both trains of CRVIS will actuate and seal in.
Therefore, the only way to ensure the control room filtration system A(B) supply dampers remain closed was to remove power to maintain the ESF switchgear room A and B halon boundary in event of the fire. This is due to one of two control radiation monitor loss of power and causing a CRVIS actuation that cannot be reset. The licensee did have guidance in their normal operating Procedure SYS GK-122, Manual CRVIS Line-Up, revision 25, to remove power from the control room filtration system supply dampers by removing fuses. However, SYS GK-122 was not referenced in procedures STS GK-005A, AP 10-103, ALR KC-888, and OFN KC-016. Additionally, SYS GK-122 was not referenced as one of the procedures that implements the licensees fire protection program in accordance with procedure AP 10-100.
The licensee would have to rely on operator knowledge during ESF switchgear room fire to identify the need to use the guidance in SYS GK-122.
From the above, the inspectors determined the compensatory measure for the ESF switchgear rooms degraded halon barrier during CRVIS in accordance with procedure AP 10-103, attachment E, was not maintained. Specifically, the licensee failed to remove power from the control room filtration system A(B) supply dampers by removing fuses prior to releasing GK HIS-83 or 160 close pushbuttons to maintain the ESF switchgear room A and B halon boundary. The inspectors informed the licensee of the issue. The licensee then entered it into their corrective action program as condition reports 10023674 and 10023797.
Corrective Actions: The licensee established required reading for maintaining the control room filtration system A(B) supply dampers closed in case of a fire in the ESF switchgear and updated procedures AP 10-103, ALR KC-888, and OFN KC-016.
Corrective Action References: Condition reports 10023674 and 10023797
Performance Assessment:
Performance Deficiency: The licensees failure to maintain procedure AP 10-103, attachment E, compensatory measure for maintaining the ESF switchgear rooms A and B halon system functional during CRVIS actuation was a performance deficiency.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to maintain compensatory measures for maintaining the ESF switchgear rooms halon boundary functional during CRVIS actuation in the event of a fire.
Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix F, Fire Protection and Post - Fire Safe Shutdown [Safety Determination Process]
SDP. The inspectors assigned the finding a fire Category 1.4.1 using Inspection Manual Chapter 0609, Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheet, dated May 2, 2018, because the finding involved fire prevention and administrative controls. The inspectors determined that the finding had very low safety significance (Green) because the finding:
- (1) did not increase the likelihood of a fire, delay detection of a fire, or resulted in a more significant fire than previously analyzed such that credited safe shutdown strategy could be adversely impacted; and
- (2) the degraded fire confinement element continued to provide adequate fire endurance to prevent fire propagation through the fire confinement element given the combustible loading and location of equipment important to safe shutdown in the fire area of concern.
Cross-Cutting Aspect: Not Present Performance. Specifically, the performance deficiency occurred in 2003 when the licensee incorporated operating experiences associated with fire occurring in the ESF switchgear rooms when performing CRVIS surveillance testing.
Enforcement:
Violation: Technical specification 5.4.1.d requires that written procedures shall be established, implemented, and maintained covering fire protection program implementation.
Procedure AP 10-103, Fire Protection Impairment Control, revision 39, attachment E defines the compensatory measures required for out-of-service or degraded fire protection features.
Contrary to the above, the licensee failed to maintain procedures covering the fire protection program implementation. Specifically, from January 2004 to May 2023, as defined in procedure AP 10-103, attachment E, the licensee failed to maintain compensatory measures to ensure control room filtration supply dampers remained closed to maintain ESF switchgear rooms A and B halon system function during CRVIS actuation.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.
Failure to Implement Emergency Exhaust System Surveillance Testing Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000482/2023002-02 Open/Closed
[H.5] - Work Management 71111.13 The inspectors identified a Green finding and associated non-cited violation of technical specification 5.4.1.e, for the licensees failure that written procedures shall be implemented for Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). Specifically, the licensee failed to properly implement surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.
Description:
On May 16, 2023, the inspectors performed a walkdown of train A emergency exhaust system to verify the licensee established surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, prerequisites.
During this walkdown, the inspectors identified the licensee failed to correctly implement surveillance procedure STS PE-006. Specifically, the licensee failed to open the train A emergency exhaust system humidity control heating coil breaker. Instead, the licensee opened the train B emergency exhaust system humidity control heating coil breaker and caused train B emergency exhaust system to become inoperable for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The licensee entered this issue into their corrective action program and performed an event review.
The inspectors perform a walkdown of train B emergency exhaust system and reviewed the event review and concluded the licensee failed to implement the work management process.
The key items that resulted in this violation included:
The licensee protected train B emergency exhaust system with the exception of the motor control center containing train B emergency exhaust systems humidity control heating coil breaker. The reason the licensee protected train B emergency exhaust system was, because on May 15, 2023, train A emergency exhaust system was declared inoperable for a failed surveillance test.
The licensee designated the incorrect steps as not applicable prior to implementing surveillance procedure STS PE-006. Specifically, the licensee designated steps to open train A emergency exhaust system humidity control breaker as not applicable, instead of train B emergency exhaust system humidity control breaker.
The licensee failed to verify job site conditions for train A emergency exhaust system prior to commencing surveillance procedure STS PE-006, as required by step 7.9.2.
Specifically, the licensee failed to verify the train A emergency exhaust system humidity control breaker was open prior to the inspectors identifying the breaker was not open. The inspectors identified the incorrect breaker was opened, because they questioned why the train A emergency exhaust system humidity control heat coiling status lights where on when power to the unit was removed in accordance with STS PE-006.
The licensee failed to ensure the individual from the operational relief crew was fully aware of plant status associated with train A emergency exhaust system being inoperable and train B emergency exhaust system being protected.
Corrective Actions: The licensee restored train B emergency exhaust system operability by closing its humidity control heating coil breaker and performed train A emergency exhaust system past operability evaluation, and determined it was operable during the time emergency exhaust system B was inoperable.
Corrective Action References: Condition report 10024447
Performance Assessment:
Performance Deficiency: The licensees failure to open the train A emergency exhaust system humidity control heating coil breaker, and instead opened train B emergency exhaust system humidity control heating coil breaker, which caused inoperability for train B emergency exhaust system, was a performance deficiency.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the human performance attribute of the Barrier Integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the licensees failure to open the correct breaker during train A emergency exhaust system surveillance testing resulted in train B emergency exhaust system being inoperable for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using Exhibit 3, Section C, the inspectors determined the finding was of very low safety significance (Green) because it only represented a degradation of the radiological barrier function of the auxiliary and fuel buildings.
Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the licensee failed to effectively plan and execute work by incorporating risk insights, job site conditions, the need for coordination with different groups, and to ensure individuals were aware of plant status, the nuclear safety risks associated with work in the field.
Enforcement:
Violation: Technical specification 5.4.1.e. requires that written procedures shall be established, implemented, and maintained covering all programs specified in Technical Specification 5.5, which includes Technical Specification 5.5.11, Ventilation Filter Testing Program (VFTP). The licensee established surveillance Procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, to perform in-place leak testing of the auxiliary/fuel building emergency exhaust system charcoal absorber.
Contrary to the above, on May 16, 2023, the licensee failed to properly implement written procedures specified in technical specification 5.5.11. Specifically, during the performance of surveillance procedure STS PE-006, the licensee opened the incorrect breaker rendering train B emergency exhaust system inoperable.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.
Observation: Semiannual Trend Review 71152S The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation available to help identify performance trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address the identified adverse trends. The inspectors did not review any cross-cutting themes because none existed at the site.
To verify the licensee was taking corrective actions to address identified adverse trends that might indicate the existence of a more significant safety issue, the inspectors noted a trend in human performance. Specifically, the inspectors noted ten condition reports from April 5, 2023, to May 26, 2023, associated with human performance events. Examples included:
Condition report 10024172: The licensee identified, during the performance of quality assurance assessment QA-2023-0581, a trend associated with procedure adherence with information use procedures.
Condition report 10024176: The licensee identified the incorrect sample location was used for sampling the spent fuel pool. The licensee sampled from normal location instead of the alternate location for when the refueling water storage tank was aligned for recirculation. The licensee failed to verify procedure prerequisites are met rather than assuming they are met based on general plant conditions.
Condition report 10024432: The licensee identified an individual verified the incorrect breaker during clearance order verification. The licensee failed to perform an adequate pre-job brief, perform a thorough review of the work site, human error reduction tool usage.
Condition report 10024447 and NCV 2023002-02: The inspectors identified the licensee failed to properly implement surveillance procedure STS PE-006, Charcoal Adsorber In-Place Leak Test Safety Related Units, revision 17, when establishing the prerequisites for performing train A emergency exhaust system in-place leak testing of the charcoal absorber causing train B emergency exhaust system to become inoperable when an operator opened the wrong breaker.
Condition report 10024456: The licensee identified train A essential service water pump missed surveillance. The train A essential service water pump was placed on an increased frequency (every 45 days) to perform vibration measures due to being in the alert range in accordance with the ASME OM Code. However, the licensed failed to perform the surveillance at 45 days due to not having a consistent process for changing surveillance frequency in accordance with the ASME OM Code.
Condition report 10024699: The licensee tripped emergency diesel generator A during post-maintenance testing due to not nulling the voltage regulatory prior to placing it into manual. The licensee failed to use human error reduction tools and the latent condition contained with the procedure where multiply actions are contained in one step.
Condition report 10024701: The licensee identified the failure to declare the train A offsite circuit inoperable and missed surveillance requirement 3.8.1.1 when the emergency diesel generator A was paralleled with the offsite circuit and safety feature transformer A load tap changer was in automate. This occurred during post-maintenance testing of emergency diesel generator A. The procedure did not discuss the technical specification requirements associated with the safety-related transformer load tap changer in automatic and the impact on the offsite circuit.
Condition reports 10024329, 10024630, and 10023626: The inspectors identified three examples of the licensee failure to implement procedure AI 22C-013, Protected Equipment, revision 3. Specifically, two examples associated with not protecting equipment required by AI 22C-013 (H.8 Procedure Adherence) and one example of not determining if additional equipment was needed to be protected during technical specification equipment outages due to change in which work group performs the step.
In response to the above trend, the licensee issued site-wide communications, individual corrective actions, and performed a trend analysis documented in condition report
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On June 8, 2023, the inspectors presented the radioactive effluent and environmental monitoring inspection results to J. McCoy, Site Vice President, and other members of the licensee staff.
On July 6, 2023, the inspectors presented the integrated inspection results to J. McCoy, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports
10023597, 10020532
Procedures
SYS EA-121
Service Water Flow Adjustment
Procedures
SYS-OPS-009
Hot Weather Operations
Calculations
NE-E-002
Analysis of Diesel Generator with A Concurrent Loss of ESW
Corrective Action
Documents
Condition Reports
10022595, 10024618
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
10024377, 10024594
Drawings
M-12GK01
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK02
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK03
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK04
Piping and Instrumentation Diagram Control Building HVAC
Engineering
Changes
EER 88-GK-14
GK Control Room Ventilation
Miscellaneous
ED 95-0134
Operational Procedures Required to Address the Scenario of a
Loss of Essential Service Water Coincident with a Loss of
Offsite Power
01/09/1995
Miscellaneous
M-018
Design Specification for Standby Diesel Generators for Wolf
Creek Generating Station
Miscellaneous
WCNOC-PSA-
20
Human Reliability Analysis
Miscellaneous
WCRE-01
Total Plant Setpoint Document
116
Procedures
ALR 00-055A
11A
Procedures
ALR 00-055B
2A
Procedures
ALR 00-055C
Procedures
EMG E-0
Reactor Trip or Safety Injection
Procedures
OFN EF-033
Loss of Essential Service Water
Procedures
SYS GK-122
Manual CRVIS Line-Up
Work Orders
23-487314-000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports
10024714, 10024716
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
10023674, 10023797
Drawings
E-13GK10A
Schematic Diagram Control Room Pressurization Fan and
Supply Dampers
Drawings
E-13GK19
Schematic Diagram Air Return Dampers to Control Room
Filter Adsorber units
Drawings
M-12GK03
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK04
Piping and Instrumentation Diagram Control Building HVAC
Miscellaneous
BAP-23-0155
Breach Authorization Permit
05/27/2023
Miscellaneous
E-1F9904
Fire Hazard Analysis
Miscellaneous
E-1F9910
Post-Fire Safe Shutdown Area Analysis
Miscellaneous
FPIP-21-0011
Fire Protection Impairment Control Permit
01/11/2021
Miscellaneous
FPIP-23-0076
Fire Protection Impairment Permit
05/23/2023
Miscellaneous
WCRE-35
Boundary Matrix
Procedures
ALR KC-888
Fire Protection Panel KC-008 Alarm Response
Procedures
AP 10-103
Fire Protection Impairment Control
Procedures
AP 10-104
Breach Authorization
39A
Procedures
On-Line Nuclear Safety and Generation Risk Assessment
Procedures
BAP-23-0137
Breach Authorization Permit
05/18/2023
Procedures
FPIP-23-0074
Fire Protection Impairment Permit
05/18/2023
Procedures
M-12GK01
Piping and Instrumentation Diagram Control Building HVAC
Procedures
OFN KC-016
Fire Response
Procedures
STS GK-003
Manual CRIVS Actuation Operability Test
Procedures
STS GK-005B
Control Room Ventilation Isolation Response Time Test -
Train B
Procedures
STS PE-061
Control Room/Control Building Habitability Test
Procedures
SYS GK-121
Control Building HVAC Valve Checklist
Procedures
SYS GK-122
Manual CRVIS Line-Up
Calculations
GK-M-001
Cooling and Heating Load Calculation for Control Room HVAC 4
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
System Capabilities During Normal Plant Operation and
Accident Conditions - (SGK04A/B)
Calculations
GK-M-001 Rev. 4
Sequence CN002
Cooling and Heating Load Calculation for Control Room HVAC
System Capabilities During Normal Plant Operation and
Accident Conditions - (SGK04A/B)
Calculations
GK-M-009
Tube Plugging Criteria for Control Room A/C Unit SGK04A/B
Condensers and ESF Switchgear Rooms A/C Unit SGK05A/B
Condensers.
Calculations
GK-M-010
Tube Pitting Criteria for Control Room SGK04A/B and
Electrical Switch Gear Rooms SGK05A/B Condensing Units.
Corrective Action
Documents
Condition Report
10024426
Drawings
M-1HX001
Heat Exchanger Tube Sheet Map Document Index & General
Notes.
Drawings
N1387-637B-A1
SGK04A & SGK04B Air Conditioner Refrigeration Schematic.
Miscellaneous
M-622.1A-00089
Instruction Manual for SGK04A, SGK04B, SGK05A & SGK05B
Air Conditioning Condensers.
W18
Miscellaneous
M-622.1A-VDS-
1.02
SGK04A/B Condenser Vendor Data Sheet
04/11/2005
Procedures
Heat Exchanger Program
Procedures
MPE GK-003
Control Room and Class 1E A/C Units Preventive
Maintenance Activity.
Procedures
MPE GK-004
GK Unit Preparation for Work
Procedures
QCP-20-518
Visual Examination of Heat Exchangers and Piping
Components.
Procedures
STS MT-072
SGK04A Heat Exchanger Inspection.
Procedures
STS MT-073
SGK04B Heat Exchanger Inspection
Work Orders
17-430780-000, 19-453962-000, 19-454117-000,
20-457760-000, 20-463375-000, 20-465267-000,
21-470597-000, 21-473007-000, 22-478969-000,
2-48-497-000
Procedures
EGM FR-H1
Response to Loss of Secondary Heat Sink
Corrective Action
Documents
Condition Reports
119268, 10011933, 10017443, 10017549, 10017590,
10017591, 10018051, 10019604, 10020190, 10020251,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
10021252, 10021303, 10021305, 10021612, 10021662,
10021867, 10022090, 10022347, 10023775, 10024005,
10024102, 10024153
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
10024045, 10024353
Drawings
M-12GK01
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-1H3411
Sheet 1
Heating Ventilating and Air Cond. Control Building El. 2016-
Engineering
Changes
CCP 014515
SGK04A/B Control Room A/C Fan Sheaves
Engineering
Changes
DECP 012327
Approval of Remanufactured ESFAS and LSELS Circuit
Boards
Miscellaneous
M-10GK
Control Building Ventilation System
Miscellaneous
PMR 04773
Instrument Loop GKAI-2/3 Spared in Place
Procedures
ALR 00-063A
CRVIS
18A
Procedures
Post Maintenance Testing Development
21A
Procedures
EDI 23M-020
Engineering Desktop Instruction Determining the Safety
Significance of Structures, Systems and Components within
the Scope of the Maintenance Rule
Procedures
MPE VD-001
M627A Ventilation Damper Maintenance
Procedures
STS GK-001A
Control Room Emergency Vent System Train A Operability
Test
Procedures
STS IC-208A
4KV Loss of Voltage and Degraded Voltage TADOT NB01 Bus
- SEP GRP 1
Procedures
STS IC-255A
Channel Operational Test Control Room Air Intake Radiation
Monitor GK RE-005
16A
Procedures
STS KJ-001A
Integrated D/G and Safeguards Actuation Test - Train A
Procedures
STS KJ-001B
Integrated D/G and Safeguards Actuation Test - Train B
Procedures
SYS GK-122
Manual CRVIS Line-Up
Work Orders
07-292179-000, 07-292179-001, 07-292179-002,
13-381415-000, 21-469804-000, 21-472949-000,
2-478817-000, 22-480496-000, 22-480496-001,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2-480251-000, 22-480355-000, 22-480355-001,
2-480537-000, 22-481525-000, 22-481525-001,
2-483406-000, 23-483725-001, 23-484594-000
Corrective Action
Documents
Condition Reports
115848, 10011604, 10011805, 10024434, 10024600
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
10023595, 10023622, 10023626, 10024329, 10024447,
10024468, 10024469, 10024545, 10024630, 10025138
Drawings
M-12BG03
Piping and Instrumentation Diagram Chemical and Volume
Control System
Drawings
M-12GG01
Piping and Instrumentation Diagram Fuel Building HVAC
Procedures
AI 22C-013
Protected Equipment Program
Procedures
On-Line Nuclear Safety and Generation Risk Assessment
Procedures
Risk Management and contingency Planning
Procedures
OFN RP-017
Control Room Evacuation
Procedures
STS PE-003
Emergency Exhaust System Flow Rate and Combined
Pressure Drop Test
Procedures
STS PE-006
Charcoal Adsorber In-Place Leak Test Safety Related Units
Procedures
STS PE-009
Control Rom Ventilation System Flow Rate and Combined
Pressure Drop Test
8B
Procedures
SYS GK-201
Mitigating Actions for Inoperable SGK05 Train
Work Orders
2-479602-009, 22-481572-000, 22-481604-000, 23-488892-
000
Calculations
AN-07-009
GOTHIC Model for CCW Pump Room Temperature
Calculations
GL-M-007
Calculate Cooling Load in SR Pump Rooms Post LOCA: 1107,
1108, 1109, 1110, 1111, 1112, 1113, 1114, 1401 and 1406
Corrective Action
Documents
Condition Reports
137333, 137389, 10012721, 10012959, 10020153, 10022090,
10022115, 10022124, 10022347, 10022888, 10023674,
10024145, 10024434, 10024447, 10024483, 10024499
Corrective Action
Documents
Resulting from
Inspection
Condition Report
10024625
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
M-12GG01
Piping and Instrumentation Diagram Fuel Building HVAC
Drawings
M-12GK01
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK02
Piping and Instrumentation Diagram Control Building HVAC
Drawings
M-12GK03
Piping and instrumentation Diagram Control Building HVAC
Drawings
M-12GK04
Piping and Instrumentation Diagram Control Building HVAC
Procedures
Post Maintenance Testing Development
21A
Procedures
AP 23-009
Control Room Envelope Habitability Program
3A
Procedures
Heat Exchanger Program
Procedures
Operability Determination and Functionality Assessments
Procedures
MGE EOOP-05
Insulation Resistance Testing
28A
Procedures
MPE RC-001
Room Cooler Maintenance
Procedures
STN PE-036
Safety Related Room Cooler Heat Transfer Verification and
Performance Trending
Procedures
STS AE-209B
Main Feed Reg Valve Bypass valve Inservice Test Train B
Procedures
STS IC-208A
4KV Loss of Voltage and Degraded Voltage TADOT NB01 Bus
- SEP GRP 1
Procedures
STS PE-004
Aux Building and Control Room Pressure Test
Procedures
STS PE-006
Charcoal Adsorber In-Place Leak Test Safety Related Units
Procedures
STS PE-010
Control Room A/C System Flow Rate Verification A Train
4A, 4B
Work Orders
07-292179-000, 07-292179-001, 07-292179-002,
2-362198-003, 16-411901-000, 16-413357-000,
17-434100-000, 18-445253-000, 19-449804-000,
20-466782-000, 20-467125-000, 21-468729-000,
21-476761-000, 22-480251-000, 22-480994-000,
2-480994-001, 22-483479-000
Corrective Action
Documents
Condition Reports
2004-0917, 10004345, 10020925, 10021128, 10022158,
10022470, 10023456, 10023593, 10023594, 10023708,
10024096, 10024141, 10024459, 10024460, 10024472,
10024481, 10024531, 10024590, 10024599, 10024642,
10024646, 10024649, 10024653, 10024654, 10024663,
10024666, 10024699, 10024698, 10024699, 10024700,
10024703, 10024710
Corrective Action
Documents
Condition Reports
10023674, 10023797
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
E-13GK19
Schematic Diagram Air Return Dampers to Control Room
Filter Absorber Units
Drawings
Wiring Diagram PR-068
W15
Drawings
Wiring Diagram RP-068
W16
Drawings
M-12GK01
Piping and Instrumentation Diagram Control Building HVAC
Engineering
Changes
DECP 020700
Miscellaneous
2010-005
USAR Change Request
01/11/2010
Miscellaneous95-033
USAR Change Request
2/15/1995
Miscellaneous97-053
USAR Change Request
2/05/1997
Miscellaneous
FPIP-23-0068
Fire Protection Impairment
Miscellaneous
M-018
Design Specification for Standby Diesel Generators for Wolf
Creek Generating Station
Miscellaneous
M-018-00309
Instruction Manual for Emergency Diesel Generator System
W141
Miscellaneous
PMR 04773
Instrument Loop GKAI-2/3 Spared in Place
Miscellaneous
SCA-92-0583
Safety Classification Analysis
Procedures
ALR 00-063A
CRVIS
18A
Procedures
ALR KC-888
Fire Protection Panel KC-008 Alarm Response
Procedures
AP 05-007
Determination of Safety Classification
15A
Procedures
Chemical Control Program
Procedures
AP 23-009
Control Room Envelope Habitability Program
3A
Procedures
OFN KC-016
Fire Response
Procedures
OFN KJ-032
Local Emergency Diesel Startup
Procedures
OFN PR-013
Control Room Not Habitable
Procedures
SYS GK-122
Manual CRVIS Line-up
Calculations
EG-M-046
Hydraulic Analysis of the Component Cooling Water System
for Break Flow Determination and Orifice Sizing
Calculations
GK-M-001
Cooling and Heating Load Calculation for Control Room HVAC
System Capabilities during Normal Plant Operation and
Accident Conditions- (SGK04A/B)
Corrective Action
Documents
Condition Reports
10021799, 10021800, 10021801, 10022090, 10024604,
10025080, 10025468
Corrective Action
Condition Reports
10023591, 10024378, 10025467
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Resulting from
Inspection
Drawings
E-13EJ12
Schematic Diagram Instrumentation
Drawings
M-12EG02
Piping and Instrumentation Diagram Component Cooling
Water
Drawings
M-12EJ01
Piping and Instrumentation Diagram Residual Heat Removal
System
Miscellaneous
BAP-23-0136
Breach Authorization Permit
05/18/2023
Miscellaneous
E-025-00007
Sheet 137
W16
Miscellaneous
WCRE-34
Fourth 10-Year Interval Inservice Testing Basis Document
Miscellaneous
WCRE-38
Surveillance Frequency Control Program Test Interval List
Procedures
ALR 00-063A
CRVIS
18As
Procedures
Post Maintenance Testing Development
21A
Procedures
Diverse and Flexible Coping Mitigation Strategies (FLEX)
Program
3A
Procedures
Control of Locked Component Status
78C
Procedures
AP 23-009
Control Room Envelope Habitability Program
3A
Procedures
Motor Operated Valve Program
4A
Procedures
RCS Unidentified Leak Rate Monitoring Program
Procedures
CKL ZL-001
Auxiliary Building Reading Sheets
117
Procedures
HVAC-001
NH91 Hydramotor Damper Actuator Changeout
Procedures
MGE LT-008
Routine Electrical Limitorque Operator Maintenance
8B
Procedures
MGE LT-100
Limitorque Valve Operator General Notes & Details
Procedures
MPE GK-004
GK Unit Preparation for Work
Procedures
MPM LT-001
Limitorque Operator Minor Maintenance, Lubrication, and
Inspection
15A
Procedures
STN BG-202
Chemical & Volume Control System Valve Test
3A
Procedures
STN EF-201
ESW System Valve Test
Procedures
STS BB-006
RCS Water Inventory Balance Using NPIS Computer
Procedures
STS BG-100A
Centrifugal Charging System A Train Inservice Pump Test
Procedures
STS BG-100B
Centrifugal Charging System B Train Inservice Pump Test
56A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
STS EJ-209A
Train A RHR System Inservice Valve Test
Procedures
STS GK-002A
Control Room A/C Unit Operability Test
Procedures
STS GK-003
Manual CRVIS Actuation Operability Test
Procedures
STS IC-263
STS IC-263, Channel Calibration Containment Normal Sump
Level Loops LF LPL-0089 and LF LPL-0094
Procedures
STS IC-455B
Channel Calibration Control Room Air Intake Radiation
Monitor GK RE-004
18A
Procedures
STS ML-001
Monthly Surveillance Log
50A
Procedures
STS PE-004
Aux Building and Control Room Pressure Test
Procedures
STS PE-010A
Control Room A/C System Flow Rate Verification A Train
4B
Procedures
STS PE-061
Control Room/Control Building Habitability Test
Procedures
SYS BG-201
Shifting Charging Pumps
Procedures
SYS GK-122
Manual CRVIS Line-Up
Procedures
SYS GK-123
Control Building A/C Units Startup and Shutdown
Procedures
SYS KJ-121
Diesel Generator NE01 and NE02 Lineup for Automatic
Operation
Procedures
SYS KJ-123
Post Maintenance Run of Emergency Diesel Generator A
Procedures
SYS KJ-124
Post Maintenance Run of Emergency Diesel Generator B
Work Orders
WO 6006, 12-362198-003, 11-337724-000, 14-383081-000,
16-411901-000, 16-413357-000, 17-421829-000,
17-428577-000, 17-434100-000, 18-444324-000,
18-444324-005, 18-444324-006, 19-447730-000,
19-447821-000, 19-449804-000, 20-461790-000,
20-462103-000, 20-466517-000, 20-466782-000,
21-472265-000, 21-473302-000, 21-473916-000,
21-474115-000, 22-477193-000, 22-477646-000,
2-478271-000, 22-480251-000, 22-481222-000,
2-481236-000, 22-481236-001, 22-481377-002,
2-481572-000, 22-481572-001, 22-481604-000,
2-482165-000, 22-482165-001, 22-482194-000,
2-482194-001, 22-482755-000, 22-482755-001,
2-482755-002, 22-483329-000, 22-483384-000,
2-483467-000, 23-484974-000, 23-488896-000,
23-488896-001, 23-489078-000, 23-489078-001,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports
00144908, 10002788, 10003795, 10004226, 10004227,
10007158, 10015888, 10015954, 10024303, 10024323,
10024357, 10024376, 10024434, 10024499
Procedures
AP 02-007
Abnormal Conditions Guidelines
Procedures
AP 06-002
Radiological Emergency Response Plan
Procedures
APF 06-002-02
Emergency Action Levels Technical Bases
Procedures
CHS AX-G01
Unit vent Sampling and/or Exchange of Filters
Procedures
CHS SJ-144A
SJ-144 Sampling Instructions
Procedures
STN SP-021A
Channel Operational Test Unit Vent Radiation Monitor GT RE-
21A
5C
Procedures
STN SP-021B
Analog Channel Operational Test Unit Ventilation System
Radiation Monitor GT RE-0021B
14C
Procedures
STN SP-045
Channel Operational Test Secondary Liquid Waste System
Radiation Monitor HF RE-0045
Procedures
STN SP-052
Channel Operational Test Monitor BM RE-0052
Procedures
STN SP-110A
Channel Calibration Radwaste Building Vent Radiation Monitor
GH RE-001A
8B
Procedures
STN SP-195
Channel Calibration Hi/Lo TDS Discharge to Wastewater
Treatment Radiation Monitor HF RE-0095
Procedures
STS PE-006
Charcoal Adsorber In-Place Leak Test
Corrective Action
Documents
Condition Report
(CR)
103228, 10002277, 10005766, 10009759, 10011103,
10011229, 10011368, 10011380, 10012983, 10024434,
10024499
Corrective Action
Documents
Resulting from
Inspection
Condition Report
(CR)
10024452, 10024683, 10024800, 10024809, 10024880,
10024891, 10024893, 10025025, 10025027, 10025028
Miscellaneous
22 Meteorological Data Report
03/27/2023
Miscellaneous
21 Annual Radiological Environmental Operating Report
04/26/2022
Miscellaneous
22 Annual Radiological Environmental Operating Report -
Report 46
04/27/2023
Miscellaneous
20 Annual Radiological Environmental Operating Report
04/28/2021
Miscellaneous
NUPIC Audit
- 2022-SA-003
F & J Specialty Products, Inc.
03/14/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
NUPIC Audit
Report #25197
ATI Environmental Inc.
01/10/2023
Miscellaneous
NUPIC Audit
Report #25286
Augmented quality audit report of Landauer, Inc.
2/06/2021
Miscellaneous
QH-2021-2214
REMP Review of 2018 through 2020 Wind Directions
06/28/2021
Miscellaneous
QH-2023-2510
REMP Review of 2019 through 2021 Wind Directions
04/26/2023
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-01
01/01/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-15
01/15/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-16
01/16/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-17
01/17/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-25
01/25/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-01-29
01/29/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-02-17
2/17/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-03-14
03/14/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-04-04
04/04/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-08-04
08/04/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-09-12
09/12/2022
Miscellaneous
STS CR-001
Shift Log for Modes 1, 2, 3: 2022-12-11
2/11/2022
Procedures
AI 07B-002
Review of Radiological Environmental Laboratory Analysis
Results
Procedures
AI 07B-005
Radiological Environmental Monitoring Program
Implementation
Procedures
AI 07B-009
Collection, Preparation and Shipment of Sediment and Soil
Samples
Procedures
AI 07B-011
Collection, Preparation and Shipment of Water Samples
Procedures
AI 07B-012
Collection, Preparation and Shipment of Crop, Vegetable, Fruit
and Pasturage Samples
Procedures
AI 07B-015
Land Use Census
Procedures
AI 07B-033
Annual Radiological Environmental Operating Report
Generation
Procedures
AI 07B-034
Radiological Environmental Monitoring Program Air Sampling
Procedures
AI 230-001
Functional Importance Determination
7A
Procedures
AI 28A-010
Screening Condition Reports
28A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
AP 06-004
Equipment Important to Emergency Response
10A
Procedures
Offsite Dose Calculation Manual
Procedures
Offsite Dose Calculation Manual (Radiological Environmental
Monitoring Program)
Procedures
Validation of Meteorological Data
Procedures
Screening, Prioritization and Pre-Approval
24A
Procedures
STS CR-001
Shift Log for Modes 1, 2, & 3
115A
Procedures
STS IC-890A
Wind Speed Meteorological Instrumentation Channel
Calibration
Procedures
STS IC-890B
Wind Direction/Deviation Meteorological Instrumentation
Channel Calibration
18A
Procedures
STS IC-890C
10M/60M Ambient and Differential Temperature
Instrumentation Channel Calibration
23A
Procedures
STS IC-890D
Sonic Wind Speed/Direction/Deviation Meteorological
Instrumentation Channel Calibration
Work Orders
478299-000
STS IC-890C: 10M/60M Ambient and Differential Temperature
Instrumentation Channel Calibration
09/14/2022
Work Orders
WO 22-477168-
000
Troubleshoot Met Tower Instrumentation
04/26/2022
Work Orders
WO 22-477168-
001
Replace Met Tower Data Logger
04/26/2022
Work Orders
WO 22-481397-
000
STS IC-890A: Perform STS IC-890A Channel Calibration of
Wind Speed Meteorological Instrumentation
03/23/2023
Work Orders
WO 22-481410-
000
STS IC-890B: Channel Calibration of Wind Direction
Meteorological Instrumentation
03/23/2023
Work Orders
WO 22-481425-
000
STS IC-890D: Perform STS IC-890D Channel Calibration of
Sonic Wind Speed/Direction/Deviation
03/23/2023
71151
Miscellaneous
WCNOC-163
Mitigating System Performance Index (MSPI) Basis Document
71151
Procedures
AI 26A-008
NRC/INPO/WANO Performance Indicator and MOR Reporting
71151
Procedures
NRC Performance Indicators
Corrective Action
Documents
Condition Reports
119268, 131147, 143363, 2002-2250, 2003-2449, 10013374,
10019604, 10012170, 10012929, 10020190, 10020251,
10021053, 10021055, 10022347, 10023975, 10024331,
10024340
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Industry Operating Experience Program
31A
Miscellaneous
QH-2016-171
2018 Maintenance Rule Periodic Assessment
Miscellaneous
QH-2020-2054
20 Maintenance Rule Periodic Assessment
Miscellaneous
QH-2022-2346
22 Maintenance Rule Periodic Assessment
Miscellaneous
SA-2022-0179
Confirmatory Order Item P - Perform an Annual Effectiveness
Review of the Corrective Actions Associated with NRC CO
Miscellaneous
WCRE-35
Boundary Matrix
Procedures
AP 18-001
Emerging Concerns
Procedures
Industry Operating Experience Program
31A
Corrective Action
Documents
Condition Reports
10023626, 10024172, 10024173, 10024176, 10024329,
10024432, 10024447, 10024456, 10024630, 10024699,
10024701, 10024702, 10024753
Miscellaneous
WCQPM
Wolf Creek Quality Program Manual
Procedures
Procedure Writers Guide
33A
Procedures
Procedure Use and Adherence
Procedures
Clearance Orders
Procedures
STS Ch-021
Spent Fuel Boron Concentration Determination
9A
Procedures
SYS KJ-123
Post Maintenance Run of Emergency Diesel Generator A
Procedures
SYS KJ-124
Post Maintenance Run of Emergency Diesel Generator B
75