| Start date | Site | Title | Topic |
---|
ML24221A015 | 4 November 2024 | 05200050 | Sdaa FSER - Chapter 8 - Electric Power | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Tornado Missile Probabilistic Risk Assessment Emergency Lighting Open Phase Condition Exemption Request Earthquake Maintenance Rule Program |
ML24239A538 | 20 September 2024 | Seabrook | Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation | Safe Shutdown Anticipated operational occurrence FLEX Large early release frequency Offsite Circuit |
05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps | 19 September 2024 | South Texas | Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps | Shutdown Margin Large early release frequency Offsite Circuit |
ML24179A077 | 20 August 2024 | Comanche Peak | Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Offsite Circuit |
L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit | 15 August 2024 | Seabrook | Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be | FLEX Offsite Circuit |
L-24-189, License Renewal Application for Revision O - Supplement 1 | 7 August 2024 | Perry | License Renewal Application for Revision O - Supplement 1 | Aging Management License Renewal Earthquake Power Uprate Thermography |
IR 05000333/2024002 | 7 August 2024 | FitzPatrick | Integrated Inspection Report 05000333/2024002 | Enforcement Discretion Functionality Assessment FLEX Operability Determination Fire Protection Program Power change Downpower |
IR 05000237/2020001 | 6 August 2024 | Dresden | Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 | Packing leak Ultimate heat sink Fire Barrier Past operability Enforcement Discretion Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Scaffolding Power change Inadvertent Siren Activation Unidentified leakage Siren Power Uprate Eddy Current Test |
NLS2024053, Licensee Guarantees of Payment of Deferred Premiums | 30 July 2024 | Cooper | Licensee Guarantees of Payment of Deferred Premiums | High winds Cyber Security Decommissioning Funding Plan License Renewal Uranium Hexafluoride |
IR 05000298/2024002 | 25 July 2024 | Cooper | Integrated Inspection Report 05000298/2024002 | Mission time Internal Flooding Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Through-Wall Leak Through-Wall Leakage Fire Protection Program Failure to Scram Skill of the craft |