05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings

From kanterella
Jump to navigation Jump to search
Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
ML20140D033
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/30/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140D038 List:
References
LWP-97-060, LWP-97-60, NUDOCS 9706100210
Download: ML20140D033 (1)


LER-2097-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
Event date:
Report date:
2652097004R00 - NRC Website

text

( ontmoon ulth i dis..n ( ump.im Q1 Lit l ( lilt'% ( st'Ilt'f.it H114 %lJlle HI 22 10 2mih mnot %rt h j

( ordou ll of 2 of o el I

.. , id MnMi 22it f~~)

LWP-97-060 May 30, 1997 l i

United States Nuclear Regulatory Commission l Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station l Docket Number 50-265, DPR-30, Unit Two j Enclosed is Licensee Event Report (LER)97-004, Revision 00, for Quad I Cities Nuclear Power Station. J l

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(H)(B). The licensee shall report any event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded, or that resulted in the nuclear plant being in a condition that was outside the design basis of the pl ant.

The following commitment is being made by this letter: The Unit One (3 DWEDS and DWFDS will be examined to verify the video tape V determination during the next refueling shutdown to ensure the covers on that unit are installed per the applicable design drawings (System Engineering). This will be completed during refueling outage QlRIS.

If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, COMM W ALTH SON C IES LEAR POWER STATION

. Pearce

  • h1 L.)

Sta tion Manager g

{ ,

LWP/CP/pim hi Enclosure cc: A. 8. Beach, Regional Administrator, Region III l R. M. Pulsifer, Project Manager, NRR l C. G. Miller, Senior Resident Inspector, Quad Cities l q W. D. Leech, MidAmerican Energy Company (j D. C. Tubbs, MidAmerican Energy Company M. E. Wagner, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INP0 Records Center i 1' 97o610o21o 970sao MQE,l@l%$

PDR ADOCK 05000265 s PDR