ML20140D038

From kanterella
Jump to navigation Jump to search
Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 Dweds & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
Date released: 06/02/2020 Download: ML20140D038


:on 970509,drywell Equipment Drain Sump & Floor Drain Sump Covers Were Not Constructed IAW Design Drawings, Due to Original Construction Error.Design Change Package Has Been Completed
ML20140D073
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/29/1997
From: Peterson C
COMMONWEALTH EDISON CO.
To:
References
Download: ML20140D073 (5)
Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 Dweds & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
ML20140D033
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/30/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20140D033 (1)