Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed
ML20198T164
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/16/1998
From: Cook D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198T167 List:
References
SM-98-003, SM-98-3, NUDOCS 9801260483
Download: ML20198T164 (2)


LER-2097-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed
Event date:
Report date:
2542097027R00 - NRC Website

text

"

o nn m on m .m h u ....n . , m

, 4 /tlJil ( IllO 4 4 ltt't.it 'mf 's ..: n o e 22* N .'m th e 4 m s irth 4 ord ou u o ; d ' ,.i m om,u ;; o SM-98-003 January 16, 1998 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-97, Unit One Enclosed is Licensee Event Report (LER)97-027, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(D). The licensee shall report any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

The follow:ng commitments are being made by this letter:

1. The three failed TD2 relays from the EDGs have been sent to the Materials Engineering Group (MEG) for failure analysis. A new T0 relay has been procured for MEG to perform testing under simulated operating conditions to determine if environmental factors can alter how the timing mechanism functions. The results of these analyses as well as any associated corrective actions will be initiated by 030698.
2. Revise the Electronic Work Control System (EWCS) predefine by 020698 for QCEPM 0700-18 to have the EDG time delay relays, TD1 and TD2, calibrated based on frequency determined in # 3. If the results of testing determine the EDG TD1 and TD2 relays are operating satisfactorily this periodicity may be changed.

<$f4'7

/,

3. Revise QCEPH 0700-18 by 041098 to: 1) Calibrate / check the EDG TD1 and TD2 relays monthly under actual starting ,I conditions, and 2) To perform this calibration / check g\

concurrent with performance of QCOS 6600-01, " Diesel n, Generator Monthly Load Test." If the results of testing

~ ;' U U determine the EDG TD1 and TD2 relays are operating satisfactorily this periodicity may be changed.

9301260483 900116 PDR ADOCK 05000254 STMoR\98i98003 t A rnimm Canmpany 1

4 4

-l USNRC SM-98-003 2 January 16, 1998 i l

4. Implement changes to QCOS 6600-01, " Diesel Generator ,

Monthly Load Test", by 041098 to include steps to perforu actions outlined in corrective action #3 above.

5. Initiate an evaluation by 022798 of the EDG start-logic to determine the basis for the setpoint tolerance and if an alternate part or setpoint adjustment for TDI and TD2 is  ;

required.

6. When the corrective actions are complete, the system engineer will conduct an effectiveness review to determine if they prevented recurrence. This review should be completed by 121598. This date is to allow for data collection based on the revisions of QCEPM 0700-18 and QC05 6600-01, .and the TD relay evaluation.

If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, COMONWEALTH EDISON QUAD CITIES NUCLEAR POWER STATION 0b D. R. Cook St-+ ion Manager DBC/CP/pim Enclosure cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer. Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities

W. D. Leech, MidAmerican Energy Company'

'D. C. Tubbs, MidAmerican Energy Company M.-E. Wagner, licensing, Comed F. A. Spangenberg,. Regulatory Affairs Manager, Dresden INPO Records Center stuaawswomu

, .- .- . . . . . . _