Notifies of Change to Bases for TSs Section 3/4.5, ECCS, Re
ML20205L248
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/05/1999
From: Dimmette J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205L251 List:
References
SVP-99-057, SVP-99-57, NUDOCS 9904140197
Download: ML20205L248 (3)


Text

o.mn.oo w r. int, i a~ on o,nin.m3 sfo.ed Gun (.cm f.shng Woon 2[l() 2l3b(ll A\ t IlllC Ntif tle

' o>ra.n., n n u u r .o Tri9Y)tM 2241 SVP-99-057 April 5,1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Quad Cities Nuclea; Power Station, Unit I and Unit 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-26]

Subject:

Notification of Technical Specifications Bases Change, Technical Specification Section 3/4.5, aEmergency Core Cooling Systems"

Reference:

Letter from R. M. Krich (Comed) to USNRC, " Change to a Commitment in an NRC Approved Technical Specification Change Request," dated November 25,1998.

The purpose of this letter is to notify the NRC of a change to the Bases for Technical Specifications (TS) Section 3/4.5, " Emergency Core Cooling Systems." In the referenced letter, Commonwealth Edison (Comed) Company provided the NRC with a change in commitment regarding the implementation of Footnote (c) of TS Section 3/4.5.A, " Emergency Core Cooling System - Operating." As indicated in the reterenced letter, we have concluded that the appropri te implementation of Footnote (c) following a surveillance test faihire is to enter the 14-uay allowed outage time for the High Pressure Coolant Injection (HPCI) system. This action is consistent with TS Section 3.0.A, " Applicability," and the Improved Standard Technical Specifications, NUREG-1433, Revision 1," Standard Technical Specifications General Electric Plants, BWR/4." g In order to clarify this requirement, we have completed a change to the Bases for TS t Section 3/4.5 pursuant to 10 CFR 50.59, " Changes, Tests and Experiments." The Bases change is included as an attachment to this letter.

i sod

?M*M8su P

M8388s.'

PDR qt ev = l u m o,m o.tne.m3

he USNRC 2 April 5,1999 SVP 99 -057 If there are any questions or comments concerning this letter, please refer them to Mr. Wally Beck, Acting Regulatory Assurance Manager, at (309) 654-2241, extension 3100.

Sincerely,

,p/ / .usr oel P. Dimmette, Jr.

Site Vice President Quad Cities Nuclear Power Station

Attachment:

Technical Specif'ications Bases Page B 3/4.5-2 cc: Regional Administrator-NRC Region Ill NRC Senior Resident inspector- Quad Cities Nuclear Power Station

A e

4 ATTACHMENT TECHNICAL. SPECIFICATIONS BASES PAGE B 3/4.5-2 l

l l

l