05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments

From kanterella
Jump to navigation Jump to search
Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments
ML20140D002
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/15/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140D006 List:
References
LWP-97-038, LWP-97-38, NUDOCS 9704220062
Download: ML20140D002 (2)


LER-2097-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments
Event date:
Report date:
2542097005R00 - NRC Website

text

5 n,mnmnw cann hi~,n o,mp.ms 27

, Qu.id Qt ses ( eencrating St.ition 22~10 2(Meth A\rnur North

'/ omi.na. n (,12 mr.o

. w .um,s ,22 \

LWP-97-038 l

April 15, 1997 l 1

United State., Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk'

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)97-005, Revision 00, for Quad  !

Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the i Code of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(D). The '

licensee shall report any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

The following commitments are being made by this letter:

1. Update the plant design documents to reflect the status of this abandoned cable. This will be completed by 080197.
2. Label this cable as abandoned at all accessible locations along its route. This will be completed by 081597.
3. QCAP 0460-06, Abandoned Equipment Procedure, will be reviewed to ensure that the proper requirements are in place to ensure drawing updates, cable numbering updates and lateling of abandoned cables. This will be completed by 080197.

If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at ,

309-654-2241, ext. 3609, i

oq0020 g}d i 9704220062 970415 PDR ADOCK 05000254 S PDR

!$ll}lll!!fk!klbII A I'mcom Comp.m3

l LWP-97-038 2 April 15, 1997 Respectfully, .

COMMONWEALTH EDISON COMPANY i QUAD'CITIg5) NUCLEAR POWER STATION

./ /

l

)

! N (L{L L? W. earce Station Manager LWP/CP/pim Enclosure cc: A. B. Beach, Regional Administrator, Region III l

R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quaf. cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company l P. L. Piet, Licensing, Comed l F. A. Spangenberg, Regulatory Affairs Manager, Dresden ,

INPO Records Center l

l l

I l

l l

(

9 STMORW3897.LWP I

l l-