05000265/LER-1996-001, Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept

From kanterella
(Redirected from 05000265/LER-1996-001)
Jump to navigation Jump to search
Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept
ML20113C463
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 06/19/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20113C464 List:
References
LW-96-050, LW-96-50, NUDOCS 9607010251
Download: ML20113C463 (2)


LER-2096-001, Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept
Event date:
Report date:
2652096001R00 - NRC Website

text

r ,

comnu>nu calth Edwin Compan)

Quad Citics Generating Station

, 22'10 2cith Avenue North Cordos a. 11.61242-9'40 retw>s4-22 u LWP-96-050 l

l l

June 19, 1996 U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station l Docket Number 50-265, DPR-3h Unit Two Enclosed is Licensee Event Report (LER)96-001, Revision 00, for Quad Cities Nuclear Power Station.

j This report is submitted in accordance with the requirements of the Code l of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(D). The licensee ,

i shall report any event or condition that alone rould have prevented the l

fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

The following commitments are being made by this letter:

1. This event will be included as part of continuing training for both the licensed operators and the engineering departments. This training will be completed by September 30, 1996.

! 2. Operator training lesson plans will be revised to clearly state i

that the HPCI system is inoperable with the turbine exhaust line vacuum breakers isolated. This will be completed by August 31, 1996.

! 3. The modification process will be reviewed and changed as necessary I

to ensure that all recommendations contained in the mod approval letter are either implemented or dispositioned by the appropriate department. This review will be completed and any necessary changes implemented by December 31, 1996. -

4. Installed Modifications will be sampled to determine if all appropriate recommendations from the modification approval letters have been implemented. The review will be completed by December 31, 1996.

0100T7 .

STMGRW5096.LWP 9607010251 960619 PDR ADOCK 05000265

  1. L- hb < ( '

8 PDR A t nicom company

~

LWP-96-050 '

June 19, 1996 Page 2 If there are any questions or comments concerning this letter, please refer them to Nick Chrissotimos, Regulatory Assurance Supervisor at 309-654-2241, ext. 3100.

Respectfully, COMMONWEALTH EDISON COMPANY QUAD CITIES NU LE POWER STATION 05 i k$ '

y L. W. Pearce Station Manager LWP/NC/plm Enclosure cc: P. Piet C. Miller, Senior Resident Inspector, Quad Cities INP0 Records Center H.J. Miller, Regional Administrator, Region III R.J.' Singer, Mid American Energy Company D.C. Tubbs, Mid American Energy Company R.M. Pulsifer, Project Manager, NRR  ;

i 1

l STMGIOO5096.LWP l