Pages that link to "05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings"
Jump to navigation
Jump to search
The following pages link to 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings:
Displayed 3 items.
- ML20140D033 (redirect page) (← links)
- ML20140D038 (← links)
- 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 Dweds & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings (redirect page) (← links)
- 05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr (← links)
- 05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr (← links)
- 05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted (← links)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments (← links)
- 05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 (← links)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes (← links)
- 05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER (← links)
- 05000265/LER-1997-008, Forwards LER 97-008-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000265/LER-1997-001, Forwards LER 97-001-01 for Quad Cities Nuclear Power Station,Iaw 10CFR50.73(a)(2)(v)(D).Commitments Made by Util, Listed (← links)
- 05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed (← links)
- 05000265/LER-1997-002, Forwards LER 97-002-01 Which Identifies Addl Discrepancy in LER 97-002-00.Quad Cities Nuclear Power Station Unit 2 Shutdown 022897 Also Required Because of Loss of Primary Containment Integrity (← links)
- 05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed (← links)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed (← links)
- 05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed (← links)
- 05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (← links)
- 05000265/LER-1997-003, Forwards LER 97-003-01 Re Core Spray Room Cooler 2B That Fouled Due to Hydrolyzing Debris.Commitment Listed (← links)
- 05000265/LER-1997-005, Forwards LER 97-005-01 Re Unit 2 Reactor Placed in Mode 2 W/O Required Number of Emergency Diesel Generators Operable. Commitment Listed (← links)
- 05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 (← links)
- 05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided (← links)
- 05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed (← links)
- 05000265/LER-1997-012, Informs of Change of Committed Due Date Re Rev to Procedure Contained in LER 97-012,dtd 971218.Due Date Is Now 980828 Due to Work Prioritization & Backlog for Resources for Completion of Engineering Request (← links)
- 05000265/LER-1997-010, Forwards LER 97-010-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).No Commitments Made (← links)
- 05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented (← links)
- 05000265/LER-1997-015, Informs NRC of Change to Committed Due Date Contained in Ltr Re LER 97-015 (← links)
- 05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed (← links)
- 05000265/LER-1997-004 (redirect page) (← links)