Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- _ _ _ _ _ _ _ _ _ _ _ .
d e
Joseph M. Farley Nuclear Plant Unit 1
- Narrative Summary of Operations February 1995 At 0624 on February 16,1995, with the Unit in mode 1 and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced. J The unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.
The unit was returned to 100 percent reactor power at 1757 on February 16,1995.
There was no major safety related maintenance performed during the month.
l l 9503160109 95o3o9 PDR ADOCK 05000348 R PDR
I e
1
. OPERATING DATA REPORT DOCKET NO. 50-348 DATE March 6,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 DEERATINGSTAIUS
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period: February 1995 1) Cumulative data sincel2-01-77,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
' 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 929
- 6. Maximum Dependable Capacity (Gross MWe): 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812 i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Tnrough 7) Since Last Report, Give Reasons: N/A
- 9. Power level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 672.0 1,416.0 151,176.0
- 12. Number Ofliours Reactor Was Critical 672.0 1,325.7 120,582.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 672.0 1,305.9 11h,759.8
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,772,517.2 3,441,156.4 305,576.973.4
- 17. Gross Electrical Energy Generated (MWil) 584,115.0 1,133,102.0 98,546,807.0
- 18. Net Electrical Energy Generated (MWH) 555,371.0 1,072,826.0 93,072.815.0
- 19. Unit Service Factor 100.0 92.2 711.6
- 20. Unit Availability Factor 100.0 92.2 78.6
- 21. Unit Capacity Factor (Using MDC Net) 101.8 93.3 93.3
- 22. Unit Capacity Factor (Using DER Net) 99.7 91.4 74.3
- 23. Unit Forced Outage Rate 0.0 7.8 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77
~
DOCKET NO. 50-348
. UNIT _ 1 DATE March 6,1995 COMPLETED Bi R. D. Ilill TELEPilOP E' (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 833 17 822 2 831 18 829 3 830 19 831 4 833 20 831 5 834 21 832 6 836 22 835 7 833 23 834 8 835 24 831 9 835 25 836 10 831 23 833 11 829 27 830 l 12 834 28 830 13 835 29 N/A 14 833 30 N/A 15 827 31 N/A 16 _
681 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SIIUTDOWNS AND POWER REDUCTIONS .
DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE _ March 6,1995 l
COMPLETED BY R. D. Ilill REPORT MONT11 February TELEP110NE (334) 899-5156 MET 110D OF LICENSEE CAUSE AND CORRECTIVE DURADON SiRrEHNG EVENT SYS M t COMPONENT ACUON TO NO. . DATE TYPEjl) IlOURS REASON _12) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RI'CURRL'NCE E002 950216 F 0 A 4 N/A EL XFMR At 0624 on February 16,1995, with the Unit in mode I and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced.1 he unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.
The unit was returned to 100 percent reactor power at 1757 on February 16,1995.
I: 2: 3: 4: 5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I- Same Source S: Scheduled A - Equipment Failure (Explain; I - Manual Preparations of Daic Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NT.TREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & License Examination F- Administrative G - Operational Error (Explain) 11 - Other (Explain)
. _ . - - . . - _ . . _ . - . _ _ _ . . _ . - . _ _ _ ______.___a
elm alf.il/1W1.%EEf I
Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations February 1995 There were no unit shutdowns or major power reductions during the month.
There was no major safety related maintenance performed during the month.
t l
=
~
. OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 6,1995 COMPLETED BY R. D. Ilill TELEPilONE (334) 899-5156 OPERATING 3IATUS
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes
- 2. Reporting Period: February 1995 1) Cumulative data since 07-30-81,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 863.6
- 7. Maximum Dependable Capacity (Net MWe): 822
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 672.0 1,416.0 119,089.0
- 12. Number OfIlours Reactor Was Critical 672.0 1,338.4 102,996.1
- 13. Reactor Reserve Shotdown 11ours 0.0 0.0 138.0
- 14. Ilours Generator On-line 672.0 1,326.8 101,549.4
- 15. Uni: Reserve Shutdown llours 0.0 0.0 0.0 i 16. Gross Thermal Energy Generated (MWII) 1,742,523.1 3,470.548.5 259,810,254.2
! 17. Gross Electrical Energy Generated (MWil) 579,256.0 1,150,948.0 85,205,490.0 I 18. Net Electrical Energy Generated (MWII) 551,934.0 1,094.568.0 80,816,866.0
- 19. Unit Service Factor 100.0 93.7 85.3 l 20. Unit Availability Factor 100.0 93.7 85.3 l 21. Unit Capacity Factor (Using MDC Net) 99.9 94.0 94.0 l 22. Unit Capacity Factor (Using DER Net) 99.1 93.2 81.9 l 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
pfi,eling/ Maintenance outage, March 10,1995 Approximately 39 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Strtus (Prior To Commercial Operation): Forecast Achieved initial Criticality 05/06/81 05/08/81 I Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 _
07/30/81
DOCKET NO. 50-364 UNIT 2 DATE March 6,1995 COMPLETED BY R D. Hill TELEPilONE (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) ' (MWe-Net) 1 636 17 833 2 818 18 839 3 _
832 19 841 4 837 20 840 5 838 21 837 6 840 22 828 7 839 23 817 8 844 24 812 9 845 25 801 _
10 839 26 795 _
11 836 27 783 12 845 28 779 13 _
845 29 N/A 14 841 30 N/A 15 834 31 _
N/A 16 830 INSTRUCTIONS
} On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
- l. ,, .. .
UNIT SIIUTDOWNS AND POWER REDUCTIONS ;
DOCKET NO. 50-3M UNIT NAh!E J. ht. Farley - Unit 2 DATE Afarch 6,1995 g COhtPLETED BY R. D. Hill REPORT h10NTil February TELEPHONE (334) 899-5156 -
e I MET 110D OF LICENSEE CAUSE ANDCORRECTIVE DURATION SIIUTTING EVLNr SYSTEM COMPONENT ACTION TO NO. DATE TYPE (1) Ilot,'R$ REASON (2) IX)WN REACTOR 0) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE nhere_weremo_shutdownsar_pmvetreductions_duringlheanonth. /
! i l
l '
l R
1: 2: 3: 4: $;
F: Forced Reason Method Exhibit G-Instructions for Exhibit I- Same Source 5: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Enuy B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatcry Restriction 4 - Other (Explain) ,
E -Operator Training & License Examination I F - Administrative G - Operational Error (Explain)
II-Other (Explain)
/
.