Monthly Operating Rept for Feb 1995 for Jm Farley Nuclear Plant
ML20081B263
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/1995
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20081B260 List:
References
NUDOCS 9503160109
Download: ML20081B263 (8)


Text

- _ _ _ _ _ _ _ _ _ _ _ .

d e

Joseph M. Farley Nuclear Plant Unit 1

- Narrative Summary of Operations February 1995 At 0624 on February 16,1995, with the Unit in mode 1 and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced. J The unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.

The unit was returned to 100 percent reactor power at 1757 on February 16,1995.

There was no major safety related maintenance performed during the month.

l l 9503160109 95o3o9 PDR ADOCK 05000348 R PDR

I e

1

. OPERATING DATA REPORT DOCKET NO. 50-348 DATE March 6,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 DEERATINGSTAIUS

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: February 1995 1) Cumulative data sincel2-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.

' 4. Nameplate Rating (Gross MWe): 860

5. Design Electrical Rating (Net MWe): 929
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812 i
8. If Changes Occur in Capacity Ratings (Items Number 3 Tnrough 7) Since Last Report, Give Reasons: N/A
9. Power level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
11. Ilours in Reporting Period 672.0 1,416.0 151,176.0
12. Number Ofliours Reactor Was Critical 672.0 1,325.7 120,582.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Ilours Generator On-line 672.0 1,305.9 11h,759.8
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,772,517.2 3,441,156.4 305,576.973.4
17. Gross Electrical Energy Generated (MWil) 584,115.0 1,133,102.0 98,546,807.0
18. Net Electrical Energy Generated (MWH) 555,371.0 1,072,826.0 93,072.815.0
19. Unit Service Factor 100.0 92.2 711.6
20. Unit Availability Factor 100.0 92.2 78.6
21. Unit Capacity Factor (Using MDC Net) 101.8 93.3 93.3
22. Unit Capacity Factor (Using DER Net) 99.7 91.4 74.3
23. Unit Forced Outage Rate 0.0 7.8 6.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

~

DOCKET NO. 50-348

. UNIT _ 1 DATE March 6,1995 COMPLETED Bi R. D. Ilill TELEPilOP E' (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 833 17 822 2 831 18 829 3 830 19 831 4 833 20 831 5 834 21 832 6 836 22 835 7 833 23 834 8 835 24 831 9 835 25 836 10 831 23 833 11 829 27 830 l 12 834 28 830 13 835 29 N/A 14 833 30 N/A 15 827 31 N/A 16 _

681 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE _ March 6,1995 l

COMPLETED BY R. D. Ilill REPORT MONT11 February TELEP110NE (334) 899-5156 MET 110D OF LICENSEE CAUSE AND CORRECTIVE DURADON SiRrEHNG EVENT SYS M t COMPONENT ACUON TO NO. . DATE TYPEjl) IlOURS REASON _12) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RI'CURRL'NCE E002 950216 F 0 A 4 N/A EL XFMR At 0624 on February 16,1995, with the Unit in mode I and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced.1 he unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.

The unit was returned to 100 percent reactor power at 1757 on February 16,1995.

I: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G-Instructions for Exhibit I- Same Source S: Scheduled A - Equipment Failure (Explain; I - Manual Preparations of Daic Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NT.TREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination F- Administrative G - Operational Error (Explain) 11 - Other (Explain)

. _ . - - . . - _ . . _ . - . _ _ _ . . _ . - . _ _ _ ______.___a

elm alf.il/1W1.%EEf I

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations February 1995 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance performed during the month.

t l

=

~

. OPERATING DATA REPORT DOCKET NO. 50-364 DATE March 6,1995 COMPLETED BY R. D. Ilill TELEPilONE (334) 899-5156 OPERATING 3IATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: February 1995 1) Cumulative data since 07-30-81,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
11. Ilours in Reporting Period 672.0 1,416.0 119,089.0
12. Number OfIlours Reactor Was Critical 672.0 1,338.4 102,996.1
13. Reactor Reserve Shotdown 11ours 0.0 0.0 138.0
14. Ilours Generator On-line 672.0 1,326.8 101,549.4
15. Uni: Reserve Shutdown llours 0.0 0.0 0.0 i 16. Gross Thermal Energy Generated (MWII) 1,742,523.1 3,470.548.5 259,810,254.2

! 17. Gross Electrical Energy Generated (MWil) 579,256.0 1,150,948.0 85,205,490.0 I 18. Net Electrical Energy Generated (MWII) 551,934.0 1,094.568.0 80,816,866.0

19. Unit Service Factor 100.0 93.7 85.3 l 20. Unit Availability Factor 100.0 93.7 85.3 l 21. Unit Capacity Factor (Using MDC Net) 99.9 94.0 94.0 l 22. Unit Capacity Factor (Using DER Net) 99.1 93.2 81.9 l 23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

pfi,eling/ Maintenance outage, March 10,1995 Approximately 39 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Strtus (Prior To Commercial Operation): Forecast Achieved initial Criticality 05/06/81 05/08/81 I Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 _

07/30/81

DOCKET NO. 50-364 UNIT 2 DATE March 6,1995 COMPLETED BY R D. Hill TELEPilONE (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) ' (MWe-Net) 1 636 17 833 2 818 18 839 3 _

832 19 841 4 837 20 840 5 838 21 837 6 840 22 828 7 839 23 817 8 844 24 812 9 845 25 801 _

10 839 26 795 _

11 836 27 783 12 845 28 779 13 _

845 29 N/A 14 841 30 N/A 15 834 31 _

N/A 16 830 INSTRUCTIONS

} On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

l. ,, .. .

UNIT SIIUTDOWNS AND POWER REDUCTIONS  ;

DOCKET NO. 50-3M UNIT NAh!E J. ht. Farley - Unit 2 DATE Afarch 6,1995 g COhtPLETED BY R. D. Hill REPORT h10NTil February TELEPHONE (334) 899-5156 -

e I MET 110D OF LICENSEE CAUSE ANDCORRECTIVE DURATION SIIUTTING EVLNr SYSTEM COMPONENT ACTION TO NO. DATE TYPE (1) Ilot,'R$ REASON (2) IX)WN REACTOR 0) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE nhere_weremo_shutdownsar_pmvetreductions_duringlheanonth. /

! i l

l '

l R

1: 2: 3: 4: $;

F: Forced Reason Method Exhibit G-Instructions for Exhibit I- Same Source 5: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Enuy B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatcry Restriction 4 - Other (Explain) ,

E -Operator Training & License Examination I F - Administrative G - Operational Error (Explain)

II-Other (Explain)

/

.