Revised Monthly Operating Rept for Jan 1995 for Jm Farley Nuclear Plant Unit 2
ML20081B265
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/31/1995
From: Hill R
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20081B260 List:
References
NUDOCS 9503160110
Download: ML20081B265 (1)


Text

.

.c,.

OPERATING DATA REPORT 1

DOCKET NO.

50-364 DATE-February 8,1995 i

COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 DEEIMIINGSTAES

.l.

' Unit Name:

Joseph M. Farley - Unit 2 Notes 2.

Reporting Period:

January 1995

1) Cumulative data since 07-30-81, 3.

Licensed Thennal Power (MWt):

2,652 date of commercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

863.6 7.

Maximum Dependable Capacity (Net MWe):

822

8.. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.-

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A

)

i l-This Month Yr.to Date Cumulative

11. Ilours in Reporting Period 666.4 666.4 102,324.1 744.0 744.0 118,417.0
12. Number Ofliours Reactor Was Critical
13. Reactor Reserve Shutdown IIours 0.0 0.0 138.0 4

14.11ours Generator On-line 654.8 654.8 100,877.4

15. Unit Reserve Shutdown liours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,728,025.4 1,728,025.4 258,067,731.1

?

17. Gross Electrical Energy Generated (MWH) 571,692.0 571,692.0 84,626,234.0
18. Net Electrical Energy Generated (MWII) 542,634.0 542,634.0 80,264,932.0
19. Unit Service Factor 88.0 88.0 85.2
20. Unit Availability Factor 88.0 88.0 85.2
21. Unit Capacity Factor (Using MDC Net) 88.7 88.7 82.7
22. Unit Capacity Factor (Using DER Net) 88.0 88.0 81.8
23. Unit Forced Outage Rate

-itft--

0.0 12.0-0.0 4.0 3.9 1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling /Afaintenance outage, Afarch 10,1995. Approximately 39 days.

25. If Shut Down at End Of Report Period. Estimated Date of Startup:

N/A

)

- 26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 J

Commercial Operation 08/01/81 07/30/81 i

9503160110 950309 DR ADOCK 05000348 PDR