Text
.
.c,.
OPERATING DATA REPORT 1
DOCKET NO.
50-364 DATE-February 8,1995 i
COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 DEEIMIINGSTAES
.l.
' Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
January 1995
- 1) Cumulative data since 07-30-81, 3.
Licensed Thennal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822
- 8.. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.-
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
)
i l-This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 666.4 666.4 102,324.1 744.0 744.0 118,417.0
- 12. Number Ofliours Reactor Was Critical
- 13. Reactor Reserve Shutdown IIours 0.0 0.0 138.0 4
14.11ours Generator On-line 654.8 654.8 100,877.4
- 15. Unit Reserve Shutdown liours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,728,025.4 1,728,025.4 258,067,731.1
?
- 17. Gross Electrical Energy Generated (MWH) 571,692.0 571,692.0 84,626,234.0
- 18. Net Electrical Energy Generated (MWII) 542,634.0 542,634.0 80,264,932.0
- 19. Unit Service Factor 88.0 88.0 85.2
- 20. Unit Availability Factor 88.0 88.0 85.2
- 21. Unit Capacity Factor (Using MDC Net) 88.7 88.7 82.7
- 22. Unit Capacity Factor (Using DER Net) 88.0 88.0 81.8
- 23. Unit Forced Outage Rate
-itft--
0.0 12.0-0.0 4.0 3.9 1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling /Afaintenance outage, Afarch 10,1995. Approximately 39 days.
- 25. If Shut Down at End Of Report Period. Estimated Date of Startup:
N/A
)
- 26. Units in Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 J
Commercial Operation 08/01/81 07/30/81 i
9503160110 950309 DR ADOCK 05000348 PDR