- _ _ _ _ _ _ _ _ _ _ _.
d e
Joseph M. Farley Nuclear Plant Unit 1
- Narrative Summary of Operations February 1995 At 0624 on February 16,1995, with the Unit in mode 1 and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced.
J The unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.
The unit was returned to 100 percent reactor power at 1757 on February 16,1995.
There was no major safety related maintenance performed during the month.
l l
9503160109 95o3o9 PDR ADOCK 05000348 R
I e
1 OPERATING DATA REPORT DOCKET NO.
50-348 DATE March 6,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 DEERATINGSTAIUS 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
February 1995
- 1) Cumulative data sincel2-01-77, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
' 4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
929 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 i
8.
If Changes Occur in Capacity Ratings (Items Number 3 Tnrough 7) Since Last Report, Give Reasons:
N/A 9.
Power level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 672.0 1,416.0 151,176.0
- 12. Number Ofliours Reactor Was Critical 672.0 1,325.7 120,582.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 672.0 1,305.9 11h,759.8
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,772,517.2 3,441,156.4 305,576.973.4
- 17. Gross Electrical Energy Generated (MWil) 584,115.0 1,133,102.0 98,546,807.0
- 18. Net Electrical Energy Generated (MWH) 555,371.0 1,072,826.0 93,072.815.0
- 19. Unit Service Factor 100.0 92.2 711.6
- 20. Unit Availability Factor 100.0 92.2 78.6
- 21. Unit Capacity Factor (Using MDC Net) 101.8 93.3 93.3
- 22. Unit Capacity Factor (Using DER Net) 99.7 91.4 74.3
- 23. Unit Forced Outage Rate 0.0 7.8 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77
DOCKET NO.
50-348
~
UNIT _
1 DATE March 6,1995 COMPLETED Bi R. D. Ilill TELEPilOP E' (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 833 17 822 2
831 18 829 3
830 19 831 4
833 20 831 5
834 21 832 6
836 22 835 7
833 23 834 8
835 24 831 9
835 25 836 10 831 23 833 11 829 27 830 l
12 834 28 830 13 835 29 N/A 14 833 30 N/A 15 827 31 N/A 681 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J. M. Farley - Unit 1 DATE _
March 6,1995 l
COMPLETED BY R. D. Ilill REPORT MONT11 February TELEP110NE (334) 899-5156 MET 110D OF LICENSEE CAUSE AND CORRECTIVE DURADON SiRrEHNG EVENT SYS M t COMPONENT ACUON TO NO.
. DATE TYPEjl)
IlOURS REASON _12) DOWN REACTOR (3)
REPORT #
CODE (4)
CODE (5)
PREVENT RI'CURRL'NCE E002 950216 F
0 A
4 N/A EL XFMR At 0624 on February 16,1995, with the Unit in mode I and operating at 100 percent reactor power, a ramp to approximately 49 percent reactor power was commenced.1 he unit was ramped down due to the loss of forced cooling on the phase 3 Main Power Transformer.
The unit was returned to 100 percent reactor power at 1757 on February 16,1995.
I:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I-Same Source S: Scheduled A - Equipment Failure (Explain; I - Manual Preparations of Daic Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NT.TREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Training & License Examination F-Administrative G - Operational Error (Explain) 11 - Other (Explain) a
elm alf.il/1W1.%EEf I
Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations February 1995 There were no unit shutdowns or major power reductions during the month.
There was no major safety related maintenance performed during the month.
t l
=
~
OPERATING DATA REPORT DOCKET NO.
50-364 DATE March 6,1995 COMPLETED BY R. D. Ilill TELEPilONE (334) 899-5156 OPERATING 3IATUS 1.
Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
February 1995
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt):
2,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 672.0 1,416.0 119,089.0
- 12. Number OfIlours Reactor Was Critical 672.0 1,338.4 102,996.1
- 13. Reactor Reserve Shotdown 11ours 0.0 0.0 138.0
- 14. Ilours Generator On-line 672.0 1,326.8 101,549.4
- 15. Uni: Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWII) 1,742,523.1 3,470.548.5 259,810,254.2 i
- 17. Gross Electrical Energy Generated (MWil) 579,256.0 1,150,948.0 85,205,490.0 I
- 18. Net Electrical Energy Generated (MWII) 551,934.0 1,094.568.0 80,816,866.0
- 19. Unit Service Factor 100.0 93.7 85.3 l
- 20. Unit Availability Factor 100.0 93.7 85.3 l
- 21. Unit Capacity Factor (Using MDC Net) 99.9 94.0 94.0 l
- 22. Unit Capacity Factor (Using DER Net) 99.1 93.2 81.9 l
- 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
pfi,eling/ Maintenance outage, March 10,1995 Approximately 39 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Strtus (Prior To Commercial Operation):
Forecast Achieved initial Criticality 05/06/81 05/08/81 I
Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81
DOCKET NO.
50-364 UNIT 2
DATE March 6,1995 COMPLETED BY R D. Hill TELEPilONE (334) 899-5156 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) '
(MWe-Net) 1 636 17 833 2
818 18 839 3
832 19 841 4
837 20 840 5
838 21 837 6
840 22 828 7
839 23 817 8
844 24 812 9
845 25 801 10 839 26 795 11 836 27 783 12 845 28 779 13 845 29 N/A 14 841 30 N/A 15 834 31 N/A 16 830 INSTRUCTIONS
}
On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
l.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-3M UNIT NAh!E J. ht. Farley - Unit 2 DATE Afarch 6,1995 g
COhtPLETED BY R. D. Hill REPORT h10NTil February TELEPHONE (334) 899-5156 e
I MET 110D OF LICENSEE CAUSE ANDCORRECTIVE DURATION SIIUTTING EVLNr SYSTEM COMPONENT ACTION TO NO.
DATE TYPE (1)
Ilot,'R$
REASON (2) IX)WN REACTOR 0)
REPORT #
CODE (4)
CODE (5)
PREVENT RECURRENCE nhere_weremo_shutdownsar_pmvetreductions_duringlheanonth.
/
i l
l l
R 1:
2:
3:
4:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I-Same Source 5: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Enuy B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatcry Restriction 4 - Other (Explain)
E -Operator Training & License Examination I
F - Administrative G - Operational Error (Explain)
II-Other (Explain)
/
.