Forwards First Updated FSAR Reflecting Status of Plant as of 860618.Subsequent Plant Changes & Analyses,Such as Cycle 2 Reload Analysis Info,Will Be Included in Dec 1987 Update
ML20207N482
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/11/1986
From: Dewease J
LOUISIANA POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20207N485 List:
References
RTR-NUREG-0737, RTR-NUREG-0787, RTR-NUREG-737, RTR-NUREG-787 W3P86-2936, NUDOCS 8701140245
Download: ML20207N482 (2)


Text

- _ _ _ _ _ _ _ _ - _ . _

E MioOLE south UTIUTIES SYSTEM LOUISIANA POWER & LIGHT/ 317NEW BARONNESTREET

  • P. O. BOX 60340 ORLEANS, LOUISIAN A 70160 + (504)595-3100 December 11, 1986 W3P86-2936

. A4.05 QA Director of Nuclear Reactor Regulation  ;

i U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Final Safety Analysis Report (FSAR) Update

REFERENCE:

(1) W3P86-0047 dated April 1, 1986 Centlemen:

Please find enclosed 1 original and 12 copies of our updated Final Safety Analysis Report.

This is the first update of the FSAR required under 10CFR50.71(e) and, as such, is being submitted within 24 months of receipt of the Waterford 3 low power license (December 18, 1984). Future updates will be submitted on a yearly basis.

The Updated FSAR reflects the status of Waterford 3 as of June 18, 1986 and, in selected cases, more recent information. Subsequent Plant changes, analyses, etc., such as Cycle 2 reload analysis information, will be included in the December, 1987 update.

Plant changes made under the provisions of 10CFR50.59 through December 31, 1985 were included in the annual report submitted by Reference (1). Additional changes through June 18, 1986 will be discussed in the next 10CFR50.59 annual report currently scheduled for April 1, 1987. In the future, LP&L intends to submit the annual 50.59 report concurrent with the annual FSAR update.

Should you require further information concerning the Updated FSAR please contact K.W. Cook at (504) 595-2805.

You's very truly, W CLL-Q .

G. Dewcase Senior Vice President Nuclear Operations JGD/MJM/ch cc: G.W. Knighton, B.W. Churchill, W.M. Stevenson, R.D. Martin, J.H. Wilson, NRC Resident Inspector's Office (W3) 8701140245 861211 0 5 PDR ADOCK 05000382 I K PDR ~

AN EQUAL OPPORTUNITY E LOYER" h}4 j

-rf s, .

. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of )

).

Louisiana Power & Light.. Company _ ) Docket-No. 50-382

-Waterford 3 Steam Electric Station )

AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior.

.Vice President, Nuclear. Operations of Louisiana Power & Light Company; that

-he is duly authorized to sign and. file with the Nuclear Regulatory Commission the attached Final Safety Analysis Report; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

430nsnooA o

,J.G. Dewaase Senior Vice President-Nuclear Operations STATE OF LOUISIANA)

) ss PARISH OF ORLEANS )

n and for he Parish Subscribedandsworntobeforem[e,aNotaryPublic and State above named this /// J day of ^A/ M/ ,

'~