ML20063F735

From kanterella
Revision as of 02:31, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Info Re Status of Nuclear Organization as of 820820 & Staffing Commitment Per Util
ML20063F735
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/23/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Black S
Office of Nuclear Reactor Regulation
References
W3V82-0217, W3V82-217, NUDOCS 8208310326
Download: ML20063F735 (3)


Text

.

\

LOUISIANA f ,4a OuAnONDE Srnar POWE R & LIG H T/ P O BOX 0000

  • NEW OnLEANS LOUISIANA 70174 * (504) 3F6 2345 reont E sours

""" " " L v. MAURIN August 23, 1982 Vice President Nudeor Operations W3V82-0217 Ms. Suzanne Black Licensing Project Manager United States fluclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 25555

SUBJECT:

Waterford 3 SES Docket # 50-382 Recruiting and Upgrading of Total Corporate Capability

Dear Ms. Black:

In its meeting of August 6, 1981 with the ACRS, Louisiana Power & Light Company stated its intention to provide Dr. IIanauer with a monthly report of LP&L's activities relating to recruiting and upgrading of total corporate capability. This is the twelfth such report.

The staffing status of the Nuclear Organization as of August 20, 1982 is provided in Attachment 1.

Attachment 2 to this report provides a status of the staffing commitments we made in our April 20, 1981 letter to the NRC.

Yours very truly,

&#4+

L. V. Maurin LVM/ CAW /gc Attachments cc: Mr . 11. L. Thompson, Jr.

Mr. L. Constable 60/

Mr. W. M. Stevenson Mr. E. A. Blake 8208310326 820823 PDR ADOCK 05000382 A PDR

, NUCIFAR OPERATIONS STAFFING ATTACHr.ENT 1 PERSONNEL APPROVED HIRED AS STAFF 0F 8/20/82 NUCLEAR OPERATIONS STAFF 2 2 ,

PLANT OPERATIONS STAFF 10 9 STARTUP 23 15 MAINTENANCE 76 62 OPERATIONS 67 64 TECHNICAL SUPPORT 47 35 HEALTH PHYSICS 27 16 QUALITY CONTROL 6 4 TOTAL 258 206 PROJECT SUPPORT STAFF 2 2 CONSTRUCTION ENGRG. 12 8 OPERATIONAL ENGRG. 26 19 TECHNICAL SERVICES 15 10 ONSITE SAFETY REVIEW 9 4 LICENSING 13 12 TOTAL 77 55 TRAINING STAFF 12 10 QUALITY ASSURANCE STAFF 32 22 ADMINISTRATIVE SERVICES l

STAFF 60 58 TOTALS 441 353

AWUlbiiIUN UF V1iAL PERSUNNEL ATTACHMENT 2

~

COMMITTED ~ HIRED AS OF PLANT STAFF 4/20/81 8/20/82 OPERATIONS SUPT. 1 1 ASST. PLANT MGR., 0 & M 1 0 PLANT ENG. DEPT. SUPV. 1 1 GENERAL SUPPORT SUPT. 1 1 NUCLEAR OPERATIONS SUPV. 6 6 NUCLEAR AUXILIARY OPERATOR (COLD LICENSE) 10 10 NUCLEAR AUXILIARY OPERATOR (HOT LICENSE) 10 10 PLANT UflLITY ENG. 3 3 STA ENGINEERING SUPV. 1 1 PLANT ASSOC, II/I ENG. 5 5 0FFSITE SUPPORT ONSITE SAFETY REVIEW ENG. SUPV. 1 1 ONSITE SAFETY REVIEW ENG. 1 1 0FFSITE TRAINING SUPV. 1 1 NUCLEAR TRAINING DIR. 1 1 CONSULTANTS TECHNICAL ADVISOR TO VICE PRES. NUCLEAR OPERATIONS 1 1 TECHNICAL ADVISOR TO PLANT MANAGER 1 1 TOTALS 45 44

-