ML20151Z984

From kanterella
Revision as of 19:52, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Ltr Re Plant.Commission Decision Authorizing Low Power Testing & Fuel Loading First Step in Review. Earthquake-related Issues Will Be Addressed in Detail by Commission
ML20151Z984
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/29/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Natel A
AFFILIATION NOT ASSIGNED
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805060028
Download: ML20151Z984 (1)


Text

. _ _ _ _ - _ _

t =

l o -

_l

)6  %*o UNITED STATES

- j'. , g NUCLEAR REGULATORY COMMISSION )

{ g WASHiN GTON,0.C. 20S$5 l

\,.... / September 29, 1981 OFFICE OF THE COWAIS$10N E R i l

l l

Ms. Andrea Natel 2025 N. Argyle, Apt. 4 l Hollywood, CA 90068

Dear Ms. Natel:

)

i Thank you very much for your letter regarding Diablo Canyon. The l recent Comission decision authorizing low-power testing and fuel loading is only the first step in Cornission review of this plant. Specif4cally, the earthquake-related issues that distinguish Diablo Canyon from most other nuclear units have not yet been addressed in detail by th'e Comission.

They will be reviewed before operation above five percent power is authorized.

While it may have some symbolic importance, a decision to authorize  !

low-power testing poses very little danger to the public. The power level is so low that the operators have more than ample time to react to any problems in the plant, and the amount of radioactivity existing in ,

the core does not begin to build up until the plant has operated for  !

) quite a while.

I Sincerely, peter A. Bradford 4

Cornissioner 8805060028 880418 PDR FOIA I

HAMLIN87-444, PDR 4

d j b

.