DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld

From kanterella
Jump to navigation Jump to search
Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld
ML20116M228
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/14/1996
From: Powers R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-96-170, NUDOCS 9608200080
Download: ML20116M228 (1)


Text

[ ,

er -

l Pacific Gas and Electric Company Diablo Canyon Pcwer Plar' Acbert R Pc4ers l P.O. Box 56 Vice President-Diablo Car.,on AntaBeach CA93424 Operahons and Plant Manager 805/545-6000 i

i i

August 14,1996 PG&E Letter No. DCL-96-170 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Chanae 1 to Revision 4 of the Trainino and Qualification Plan

Dear Commissioners and Staff:

Pursuant to 10 CFR 73.55(c)(9)(ii), PG&E is submitting Change 1 to Revision 4 of the Training and Qualification (T&O) Plan in accordance with 10CFR50.54(p).

Enclosure 1 describes the proposed revisions to the T&Q.  ;

i Enclosure 2 includes the pages of the T&Q incorporating the changes identified  ;

in Enclosure 1. Changes are indicated by side bars in the left margin.  !

l Should you require further information or clarification, please contact Ron l Todaro, Security Director, at (805) 545-4309.

Sincerely, I -

Robert P. Powers cc: Ronald G. Todaro CCC/RMS  ;

\

l Enclosures 1 l

190109 i i

10 CFR 2.790 INFORMATION Handle As Decontrolled When Separated From The Rest Of The Document ( ' I I 1 9608200000 960814 PDR. ADOCK 05000275

(

F_. PDR _ _