Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept
ML20217A836
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/17/1998
From: Stetka T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20217A842 List:
References
50-275-98-05, 50-275-98-5, 50-323-98-05, 50-323-98-5, NUDOCS 9804220343
Download: ML20217A836 (5)


Text

e p" "' G%g UNITED ST ATES

=

.T .t NUCLEAR REGULATORY COMMISSION e

,

g REGION IV S. tir

'#

8 611 RY AN PL AZA DRIVE, SUITE 400

$ ** 0' AR LINGTON, T E XAS 76011 8064 9.....

April 17, 1998 l

Gregory M. Rueger, Senior Vice President i and General Manager Nuclear Power Generation Bus. Unit , j

'

Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Dox 770000 San Francisco, California 94177 SUBJECT: NRC INSPECTION REPORT 50-275/98-05; 50-323/98-05

Dear Mr. Rueger:

From February 2-6 and 23-27,1998, an engineering followup inspection was conducted at your Diablo Canyon Nuclear Power Plant, Units 1 and 2, reactor facilities. Following the onsite inspection period, you provided additional details related to several issues identified during the inspection. The inspection was concluded on March 18,1998. The enclosed report presents the scope and results of that inspection.

The inspection focused on resolution of previous NRC Inspection findings and included a review of those issues identified during an architect / engineering inspection documented in NRC l inspection Report 50-275;-323/97-202. Within that report, two issues were discussed that ,

appeared to involve unreviewed safety questions, though they were not processed as such I under the provisions of 10 CFR 50.59. These issues remain unresolved and will be addressed i during a future inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its ,

enclosure, and your response will be placed in the NRC Public Document Room (PDR).  !

Should you have any questions concerning this inspection, we will be pleased to discuss them ;

with you. )

Sincerely, Thomas F. Stetka, Acting Chief Engineering Branch Division of Reactor Safety Docket Nos.: 50-275;50-323 License Nos.: DPR-80; DPR-82 9804220343 980417 PDR ADOCK 05000275 O PDR

e I

li Pacific Gas and Electric Company -2-Enclosure:

NRC Inspection Report 50-275/98-05; 50-323/98-05 cc w/ enclosure:

Dr. Richard Ferguson j Energy Chair l Sierra Club Califomia

!

1100 lith Street, Suite 311 l Sacramento, Califomia 95814

! Ms. Nancy Culver i San Luis Obispo Mothers for Peace l P.O. Box 164

.

Pismo Beach, Califomia 93448 l'

l Chdrmen l San Luis Obispo County Board of l Supervisors Room 370

-

County Govemment Center l San Luis Obispo, Califomia 93408 l

l Mr. Truman Bums \Mr. Robert Kinosian

'

Califomia Public Utilities Commission l 505 Van Ness, Rm. 4102 l San Francisco, Califomia 94102 Robert R. Wellington, Esq.  ;

l Legal Counsel i L Diablo Canyon independent Safety Committo

'

857 Cass Street, Suite D Monterey, Califomia 93940

Mr. Steve Hsu l Radiologic Health Branch l State Department of Health Services l P.O. Box 942732 l Sacramento, Califomia 94234 l

Christopher J. Warner, Esq.

'

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 l

!

!

)

  • J

.

Pacific Gas and Electric Company -3-l

!

l l Robert P. Powers, Vice President I and Plant Manager

Diablo Canyon Power Plant l P.O. Box 56  !

l Avila Beach, California 93424 l Managing Editor l

Telegram-Tribune

'

1321 Johnson Avenue P.O. Box 112

San Luis Obispo, Califomia 93406 l

l l

l l

'

l

!

I

s Pacific Gas and E! V o Corepany -4-E-Mail report to T. Frye (TJF)

l E-Mail report to T. Hiltz (TGH)

l- E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

i Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/E, WCFO) MIS System Senior Project inspector (DRP/E, WCFO) RIV . File Branch Chief (DRP/TSS)

WCFO File l

l

~

,

l-l l

\ .

'

l l

i I

i

'

l L

j l

DOCUMENT NAME: R:\_DC\dc805rp.mfr To receive copy of document. Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy ]

RIV:SRl:EB / Rl:EB ! RI:EB ed C:PBE a AC:EB , 6 I MFRunyan/imb W PAGoldber# DPereira e-d' HWong <@ N TFStetkad@ !

04A498 04by98 04M98 04/6/98 04/d/98 l OFFICIAL RECORD COPY l l

o 9'

Pacific Gas and Electric Company -4-E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/E, WCFO) MIS System Senior Project inspector (DRP/E, WCFO) RIV File Branch Chief (DRP/TSS)

WCFO File I

i l

,

l /

l DOCUMENT NAME: R:\_DC\dc805rp.mfr -/

l To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy i d C:PBE RIV: SRI:EB .f RI:EB , RI:EB c.W a3 AC:EB i 6 l MFRunyan/imb W PAGoldber# DPereira e-d' HWong 4 E TFStetka d@

04/1498 04/198 04/1498 04/6/98 04/1/98 i

OFFICIAL RECORD COPY r

320030