Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations
ML20212B168
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/13/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20212B173 List:
References
50-275-99-12, 50-323-99-12, NUDOCS 9909200003
Download: ML20212B168 (5)


See also: IR 05000275/1999012

Text

- - . - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

, , . .

a

f "%r UNITED STATES

  • /j *.

NUCLEAR REGULATORY COMMISSION

REGloN IV

611 RYAN PLAZA DRIVE, sulTE 400

c p *p ARLINGTON, texas 76011-8064

,,,,,

SEP I 31999

EA 99-219

/

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B32

77 Beale Street,32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-12; 50-323/99-12

Dear Mr. Rueger:

This refers to the inspection conducted on July 11 through August 21,1999, at the Diablo

Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results

of this inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant f acility was generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

Based on the results of this inspection, the NRC has determined that four Severity Level IV

violations of NRC requirements occurred. These violations are being treated as noncited

violations, consistent with Appendix C of the Enforcement Policy. These noncitt.J violations are

described in the subject inspection ro: sort. If you contest the violation or severity level of these

noncited violations, you should provee a response withiri 30 days of the date of this inspection

report, with the basis for your denin to the Nuclear Regulatory Commission, ATTN: Document

Control Desk, Washington, DC 20M5-0001, with copies to the Regional Administrator,

U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington,

Texas 76011, the Director, Office of Enforcement, United States Nuclear Regulatory

Commission Washington, DC 20555-0001; and the NRC Resident inspector at the Diablo

Canyon Nuclear Power Plant, Units 1 and 2, f acility.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its l

enclosure, and your response, if requested, will be placed in the NRC Public Document Room. l

l

99o9200003 99o913

[DR ADOCK 05000275 PDR .

-

- -- - _ _ _ _ - - _

-

.y -

-k

' Pacific faas and Electric Company -2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

, with you.

Sincerely,

U -

m Chief

Project Branch E

Division of Reactor Projects

Docket Nos.: 50-275

50-323

License Nos.: DPR-80

DPR-82

Enclosure:

NRC Inspection Report No.

50-275/99-12;50-323/99 12

j.

cc w/ enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

110010th Street, Suite 311

. Sacramento, California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

I

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

. San Luis Obispo,' California 93408

- Mr. Truman Burns \Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102 ]

l

j

-

i

.

.

- Pacific Gas and Electric Company -3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

' P.O. Box 942732

Sacramento, California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424 -

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

.

I

.--

,

..

$

.

Pacific Gas and Electric Company -4-

S9 I 3 M

E-Mail report to T. Frye (TJF) '

' E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT

bec to DCD (IE14)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director RIV File

DRS Director RITS Coordinator

Branch Chief (DRP/E)

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

G. F. Sanborn, D: ACES

K. D. Smith, RC l

R. W. Borchardt, OE, MS: 014E1

OE:EA File, MS: 014E1

DOCUMENT NAME: R:\._DC\DC912RP.DLP

To receive copy of document. Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:RI:DRP/E PE:DRP/E SRl:DRP/E l BC:PS BC:DRP/E

JGKramer 6 co w. r GAPick DLProulx W GMGood LJSmith m,

09/3/99 W sis A 09/01/99* 09A0/99e/7 09/07/99* 09M/99

'Previously Concurred OFFICIAL RECORD COPY l

l

l

,

b

.

Pacific Gas and Electric Company -4-

SEP l 31999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT

bec to DCD (IE14)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director RIV File

DRS Director RITS Coordinator

Branch Chief (DRP/E)

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

G. W Sanborn, D: ACES

K. D. Smith, RC

R. W. Borchardt, OE, MS: 014E1

OE:EA File, MS: 014E1

1

\

\

DOCUMENT NAME: R:\_DC\DC912RP.DLP

To receive copy of docurnent, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:RI:DRP/E I PE:DRP/E l SRl:DRP/E l BC:PS BC:DRP/E l

JGKramer 6 w.o . GAPick DLProulx 6 GMGood LJSmith 2 _

09/3/99 v/ su A 09/01/99* 0940/99gt7 09/07/99* 0943/99

- Previously Concurred

OFFICIAL RECORD COPY

$-, ,.

-

'

A1

. . . , . . . . . -- . .-. . . . . . .. . . . . . . .