Text
, , .
.
- - . -
_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
a
f "%r
UNITED STATES
/j
NUCLEAR REGULATORY COMMISSION
- .
REGloN IV
611 RYAN PLAZA DRIVE, sulTE 400
p *p
c
ARLINGTON, texas 76011-8064
,,,,,
SEP I 31999
EA 99-219
/
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B32
77 Beale Street,32nd Floor
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-12; 50-323/99-12
Dear Mr. Rueger:
This refers to the inspection conducted on July 11 through August 21,1999, at the Diablo
Canyon Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results
of this inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant f acility was generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
Based on the results of this inspection, the NRC has determined that four Severity Level IV
violations of NRC requirements occurred. These violations are being treated as noncited
violations, consistent with Appendix C of the Enforcement Policy. These noncitt.J violations are
described in the subject inspection ro: sort. If you contest the violation or severity level of these
noncited violations, you should provee a response withiri 30 days of the date of this inspection
report, with the basis for your denin to the Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington, DC 20M5-0001, with copies to the Regional Administrator,
U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington,
Texas 76011, the Director, Office of Enforcement, United States Nuclear Regulatory
Commission Washington, DC 20555-0001; and the NRC Resident inspector at the Diablo
Canyon Nuclear Power Plant, Units 1 and 2, f acility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
l
enclosure, and your response, if requested, will be placed in the NRC Public Document Room.
l
l
99o9200003 99o913
[DR
ADOCK 05000275
.
-
-
--
-
_ _ _ _ - - _
-
- .y -
-k
' Pacific faas and Electric Company
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
, with you.
Sincerely,
U
-
m
Chief
Project Branch E
Division of Reactor Projects
Docket Nos.: 50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosure:
NRC Inspection Report No.
50-275/99-12;50-323/99 12
j.
cc w/ enclosure:
Dr. Richard Ferguson
Energy Chair
110010th Street, Suite 311
. Sacramento, California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
I
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
. San Luis Obispo,' California 93408
- Mr. Truman Burns \\Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
]
j
-
i
.
.
- Pacific Gas and Electric Company
-3-
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
' P.O. Box 942732
Sacramento, California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424 -
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
.
I
.--
..
,
$
.
Pacific Gas and Electric Company
-4-
S9 I 3 M
E-Mail report to T. Frye (TJF)
'
' E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT
bec to DCD (IE14)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/E)
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
G. F. Sanborn, D: ACES
K. D. Smith, RC
R. W. Borchardt, OE, MS: 014E1
OE:EA File, MS: 014E1
DOCUMENT NAME: R:\\._DC\\DC912RP.DLP
To receive copy of document. Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:RI:DRP/E
PE:DRP/E
SRl:DRP/E l
BC:PS
BC:DRP/E
JGKramer 6 co w.
GAPick
DLProulx W
GMGood
LJSmith m,
r
09/3/99 W sis A
09/01/99*
09A0/99e/7
09/07/99*
09M/99
'Previously Concurred
OFFICIAL RECORD COPY
l
,
b
.
Pacific Gas and Electric Company
-4-
SEP l 31999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT
bec to DCD (IE14)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/E)
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
G. W Sanborn, D: ACES
K. D. Smith, RC
R. W. Borchardt, OE, MS: 014E1
OE:EA File, MS: 014E1
1
\\
\\
DOCUMENT NAME: R:\\_DC\\DC912RP.DLP
To receive copy of docurnent, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:RI:DRP/E I
PE:DRP/E l
SRl:DRP/E l
BC:PS
BC:DRP/E l
JGKramer 6 w.o .
GAPick
DLProulx 6
GMGood
LJSmith 2 _
09/3/99 v/ su A
09/01/99*
0940/99gt7
09/07/99*
0943/99
- Previously Concurred
OFFICIAL RECORD COPY
$-,
A1
,.
-
'
. . . , . . . . . --
.
.-.
. . . .
.
..
. . .
.
. .
.
i