Category:CORRESPONDENCE-LETTERS
MONTHYEARML16341D1311999-10-15015 October 1999 Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves 1999-09-30
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML16341F8151990-09-20020 September 1990 Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List for Info on Facilities Received within 30 Days ML16341F8181990-09-10010 September 1990 Advises That Recipient Name Will Be Removed from Mailing List to Receive Info on Plant Unless Request Received within 30 Days of Ltr Date to Remain on List ML20033E1951990-02-26026 February 1990 Partial Response to FOIA Request for Documents.Listed App B Documents Enclosed.Apps a & B Documents Available in PDR ML16341F4081989-11-17017 November 1989 Responds to 891018 Telegram to Senator Durenberger Re Safety of Nuclear Power Plants in Event of Major Earthquake. Forwards Paper Prepared by NRC Addressing Seismic Safety of Plants in General & Diablo Canyon in Particular ML16341F2571989-07-26026 July 1989 Forwards NRC to Util Transmitting Safety Evaluation of Hilti Bolt Issue,Nrc Info Notice 88-025, Min Edge Distance for Expansion Anchor Bolts & Util 890511 & 0609 Ltrs Addressing Issue ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20197F6091988-06-0909 June 1988 Final Response to FOIA Request for Documents.Forwards Documents Including HR Denton 850708 Memo to T Rehm Re Util Hearing & Geological & Geographical Maps.App a Documents Also Available in Pdr.W/O Encl ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151P0251988-04-19019 April 1988 Final Response to FOIA Request for Documents.App Y Documents Encl & Available in PDR & Lpdr.App Z Documents Partially Withheld (Ref FOIA Exemptions 6 & 7).App AA Documents Totally Withheld (Ref FOIA Exemptions 7) ML20151P6631988-04-19019 April 1988 Responds to Appeal Re Denial of FOIA Request for Documents Re SER (NUREG-0675),Suppl 21 Concerning Operation of Plant. Forwards Documents 1,3,4,5 & 6 of Encl App. Document 2 Withheld (Ref FOIA Exemption 7) ML16341E5891988-03-23023 March 1988 Forwards NRC to Util Transmitting Safety Evaluation & Request for Addl Info Re Hilti Bolt Issue ML20149M4511988-02-23023 February 1988 Fifteenth Partial Response to FOIA Request.App W Documents Placed in Pdr.App X Documents Re Allegation Forms & Special Insp Summaries Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20148H2351988-01-22022 January 1988 Ninth Partial Response to FOIA Request for Documents Re Sser 26,NUREG-0675.Forwards App R Documents.App U & App R Documents Available in Pdr.App & T Documents Partially & Totally Withheld (Ref FOIA Exemptions 6 & 7) ML20148G4971988-01-22022 January 1988 Fourteenth Partial Response to FOIA Request for Documents on Allegations Re Plant Operation.Encl App U & V Documents Also Available in PDR & Lpdr Located in San Luis Obispo,Ca.App V Documents Partially Withheld (Ref FOIA Exemption 6) ML20147E6621988-01-19019 January 1988 Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20149D6901987-12-29029 December 1987 Thirteenth Partial Response to FOIA Request for Documents Re Plant.Forwards App R Documents.App R & Documents Available in PDR & Lpdr Located in San Luis Obispo,Ca.App T Documents May Be Purchased from ANSI ML20238C6031987-12-28028 December 1987 Responds to 871119 Appeal of NRC 871116 Denial of FOIA Request for Documents Concerning Sser 21.Documents Will Continue to Be Withheld (Ref FOIA Exemption 6) ML20236U0311987-11-24024 November 1987 Eighth Partial Response to FOIA Request for Documents Re Suppl 2 to NUREG-0675 Concerning Operation of Facility. Forwards Documents Listed in App Q.Documents Also Available in PDR ML20236U0441987-11-23023 November 1987 Twelfth Partial Response to FOIA Request for Documents Re Sser 21 & 22.Forwards App M,N & O Documents.App M,N,O & P Documents in PDR & Lpdr Located in San Luis Obispo,Ca.App Q Documents Totally Withheld (Ref FOIA Exemption 5) ML20236S5291987-11-23023 November 1987 Seventh Partial Response to FOIA Request.Forwards App O & P Documents.App O Documents Available in Pdr.App P Documents Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20236P9061987-11-16016 November 1987 Eleventh Partial Response to FOIA Request for Documents, Including Radiation & Process Monitor Resume & Qualification Status.Encl App L Documents Partially Withheld (Ref FOIA Exemption 6).Documents in PDR & Lpdr in San Luis Abispo,Ca ML20236L6761987-11-0909 November 1987 Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20236D6091987-10-27027 October 1987 Tenth Partial Response to FOIA Request for Documents Re Facility.Forwards App K Document.Apps J & K Documents Available in PDR & Lpdr in San Luis Obispo,Ca ML20235X7531987-10-16016 October 1987 Sixth Partial Response to FOIA Request Re Plant Operation & Piping Deficiencies.Forwards Documents Listed in App N.App N Documents Also Available in PDR & Responsive to Requests FOIA-84-744 & FOIA-84-776 ML20235S6161987-10-0707 October 1987 Partial Response to FOIA Request for Documents Re Possible Malicious Mischief W/Records of 830421,26 & 28 Telcon. Forwards Documents Listed in App I.App I & H Documents Also Available in PDR ML20235K3461987-09-30030 September 1987 Partial Response to FOIA Request.App C Documents Re Deficient Practices by Util Bolt Supplier Encl & Available in PDR ML20235F7651987-09-24024 September 1987 Final Response to FOIA Request for Documents Re Plant. Forwards App E Documents.No Addl Records Subj to Request Located.App E Documents Partially Withheld (Ref FOIA Exemption 4) ML20235A5301987-09-21021 September 1987 Partial Response to FOIA Request for Documents Re SSER-22 (NUREG-0675) Concerning Operation of Facilities Which Provided Further Findings on Whistleblower Charges.Forwards App J Documents.Documents Also Available in PDR ML20234C8971987-09-17017 September 1987 Fourteenth Partial Response to FOIA Request for Documents Re Allegations at Plant.Documents Listed in App M Already Available in Pdr.Documents Listed in Apps N & O Withheld in Entirety (Ref FOIA Exemption 7) ML20234B5431987-09-16016 September 1987 Fifth Partial Response to FOIA Request for Documents Re Plant.Forwards App L Documents.App K & L Documents Available in Pdr.App M Documents Totally Withheld (Ref FOIA Exemption 7) ML20235H3351987-09-15015 September 1987 Eighth Partial Response to FOIA Request.App F Documents Re Pullman Power Products,Available in Pdr.App G Documents Encl & Available in PDR & Lpdr ML20234F2671987-09-14014 September 1987 Fourth Partial Response to FOIA Request for Documents. Forwards App J Documents.Documents Also Available in Pdr. Records Also Responsive to FOIA Requests 84-744 & 84-776 ML20238F8361987-09-14014 September 1987 Seventh Partial Response to FOIA Request for Documents. Records Identified in App I Being Made Available in Pdr.App I Documents Encl ML20237L1321987-09-0303 September 1987 Partial Response to FOIA Request.App L Documents Re Allegations Concerning Diablo Canyon,Encl & Available in PDR ML20237F5921987-08-19019 August 1987 Partial Response to FOIA Request.Lers Indicated in Request for Dockets 50-220,322 & 410 Not Issued by Licensee.Forwards Documents Listed in Apps a & B.App a Documents Available in Pdr.App B Documents Being Made Available in PDR ML20237K2051987-08-14014 August 1987 Third Partial Response to FOIA Request for Documents Re Plant.Forwards App C Through I Documents.App C Through I Documents Being Made Available in Pdr.Documents Also Responsive to FOIA Requests 84-744 & 84-776 ML20237G3351987-08-12012 August 1987 Sixth Partial Response to FOIA Request.App H Transcripts of Named Individual Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20236K7901987-08-0606 August 1987 Partial Response to Appeal Re Denial of FOIA Request for Five Cassette Tape Recordings of SER of Operation of Plant (NUREG-0675,Suppl 22).Forwards NRC Interview Tape.Chilk Will Respond Concerning Other Four Tape Recordings.W/O Encl ML20235G8821987-07-0909 July 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Plant.Info Withheld Consists of Names of Individuals & Release Would Constitute Invasion of Personal Privacy. Documents Continue to Be Withheld (Ref FOIA Exemption 7) ML20215B1691987-06-11011 June 1987 Final Response to FOIA Request.Forwards App a & B Documents. App a Documents Available in Pdr.App B Documents Partially Withheld (Ref FOIA Exemptions 6 & 7).App C Documents Completely Withheld (Ref FOIA Exemption 7) IA-87-744, Fourth Partial Response to FOIA Request.Forwards Documents & Tapes Listed in Apps D & E,Respectively.Documents & Tapes Placed in Pdr.Portions of App D Documents Withheld (Ref FOIA Exemptions 6 & 7)1987-06-11011 June 1987 Fourth Partial Response to FOIA Request.Forwards Documents & Tapes Listed in Apps D & E,Respectively.Documents & Tapes Placed in Pdr.Portions of App D Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20215G3761987-06-11011 June 1987 Fourth Partial Response to FOIA Request.Forwards Documents & Tapes Listed in Apps D & E,Respectively.Documents & Tapes Placed in Pdr.Portions of App D Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20214T7521987-06-0404 June 1987 Partial Response to FOIA Request for Documents Re Plant Allegations & Jl Crews & Tw Bishop Affidavits.Forwards App K Documents.Documents Also Available in PDR ML20214B1571987-05-14014 May 1987 Partial Response to FOIA Request for Documents Re Plant. Forwards App I Documents.Documents Also Available in Pdr. Documents Also Responsive to FOIA Requests 84-743 & 84-744 ML20214A3881987-05-14014 May 1987 Seventh Partial Response to FOIA Request.Forwards Portions of Documents.Portions of App E Documents Withheld (Ref FOIA Exemption 7) ML20213F8511987-05-13013 May 1987 Partial Response to FOIA Requests for Documents Re Plant.App H Documents Available in Pdr.Documents Also Responsive to FOIA Requests 84-743 & 84-744 ML20215H8901987-05-0505 May 1987 Sixth Partial Response to FOIA Request for Documents Re Allegations.Forwards App C & D Documents.App B Documents Also Available in PDR ML20206A8611987-04-0707 April 1987 Fifth Partial Response to FOIA Request for Documents Re Sser 21.App a Documents Encl & Available in PDR ML20205S9371987-04-0202 April 1987 Partial Response to FOIA Request.Forwards App G Documents on Allegations Re Diablo Canyon from Gap 840621 Petition. Documents Also Being Made Available in PDR ML20204F6681987-03-23023 March 1987 Seventh Partial Response to FOIA Request for Documents Re 840614 Testimony Before Subcommittee on Energy & Environ Committee on Interior & Insular Affairs & Memo by Facility Piping Peer Review Panel.Forwards Documents in App F 1990-09-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML16341D1311999-10-15015 October 1999 Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves ML16342C0831998-12-29029 December 1998 Advises of Planned Insp Effort Resulting from Dcnpp Insp Planning Review Held on 981202.Historical Listing of Plant Issues,General Description of PIM Table Labels & Insp Plan for Next Eight Months Encl ML16342A6251998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML16342A5901998-12-0101 December 1998 Forwards SE of Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML16342A5801998-11-20020 November 1998 Forwards Insp Repts 50-275/98-15 & 50-323/98-15 on 981103- 06.No Violations Noted.Insp Included Implementation of Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML16342A5671998-11-0606 November 1998 Forwards Current Copy of Region 4 Organization Chart.Changes Made to Facilitate Closure of Region 4 Walnut Creek Field Ofc & Relocation of Project Branch E from Walnut Creek,Ca to Arlington,Tx.Closure Completed on 980930 ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C 1999-09-30
[Table view] |
Text
U.S. NUCLEAR RE!ULATCRY COMMISSCN NRc soia rEovEst kuvatasi f - ~ h, Fim A -H -74/cmt B Y-7R
.EseoNsE Tere y.
1 I
RESPONSE TO FREEDOM OF h"^'
W"'"
sE
\\es.e/
N 13 987 INFORMATION ACT (FOIA) REQUEST 1
e 00cmET NUMBEntSlid epseel i.EQUESTER
$6 Wb De PART 3.-RECORDS RELEASED OR NOT LOCATED ISee checked bones)
No agency records subsect to the request have been located.
No additonal agency records subsect to the request have been located Agency records subject to the request that are identified in Appe%s Y
sie already avadable for public inspecten and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.
Agency records subject to the request that are identifed in Appendia are being made available for public inspecten and copying in the NRC Public Document Moom,1717 H Street, N W., Washington, DC in a folder under this FOIA number and requester name.
The nonpropnetary versen of the proposaHsl that you agreed to accept m a telephone conversaten with a member of my staff is now being made avaiable for public inspection and coving at the NRC Pubhc Document Room,1717 H Street N W., Washington, DC,in a folder under the FOIA number and requester name.
Enclosed is informaton as how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.
Agency records subject to the request are enclosed. Any apphcable charge for copes of the records provided and payment procedures are noted in the comments section.
Records subject to the request have been referred to another Federal agencylies) for revew and direct response to you.
In vow of NRC's response to the request, no further action a being taken on appealletter dated PART ll.A-INFORMATION WITHHELD FROM PU8LIC DISCLOSURE Certam informaton in the requested records is being wrthheld from pubhc disclosure pursuant to the FOIA enemptons desenbod in and for the reasons stated in Part it, sec-tons 8, C. and D. Any released portens c4 the documents for which only part of the record is beeng withheld are being made evaslable for public inspection and copying in tha NRC Public Document Room,1717 H Street, N.W,, Washington, DC, in a folder under the FOlA number and requester name.
Comments L
7 Q
M g
it7t/
N Qw 6 a w aparab of me-#W3 w.Fe& M~74{.
8705180015 870513 PDR FOIA DEVINE84-741 PDR Si N 'URE. DIRECTOR PV1SION 5 RULES AND RECOROS W
T s
NRC FOIM 464 :Part 0 isc
-. ~.
e Re: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX H RECORDS MAINTAINED AMONG PDR FILES 1.
Undated Table 3.3-5 (Continued) Table Notation. (2 pages) PDR#
8409280391 2.
Undated Affidavit for PG8E to applie to amend its Diablo Anyon Power Plant (DCPP) Facility Operating License No, DPR-76 (License).
(1 page) PDRf 8409280389 3.
Undated Affidavit of Chu-Yu Liang (30 pages) PDR # 8403190119 4.
Undated Affidavit of Faust Rosa Regarding Residential Heat Removal System. (17 pages) PDR # 8403190122 5.
Undated Affidavit of Samuel D. Reynolds, Jr. (7 pages) PDR #
8403190110 6.
Undated Affidavit of James P. Knight. Regarding the Joint 1
Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (16 pages) PDR # 8403190102 j
7.
Undated Affidavit of Dr. Mark Hartzman, Regarding the Joint Intervenors' Motion to Augment or, in the Alternative, to Reopen the Record. (22 pages) PDR # 3403190106 8.
7/25/80 Ltr to Crouse from Reid, w/ attached Docket No. 50-346(14 pages) PDR # 8008050513
}
9.
10/26/83 Memo for Eisenhut from Bishop re Allegations Concerning j
the Residual Heat Removal System, Diablo Canyon Units 1 and 2, I
l Docket hos. 50-275 and 50-323, Allegation No. RV-83-A-0047 l
w/ attachments (10 pages) PDR# 8310310274 10.
11/25/83 Memo to Distribution (See attached) from Bishop, subject:
Diablo Canyon Allegation Management - Assignment Update.
(6 pages) PDR # 8312010118 11.
11/29/83 Memo for Attched List from Knighton re: Guidance for Preparation of the Diablo Canyon Allegations Evaluation PDR# 8312090368 12.
11/30/83 Memo for attached list from Knighton, subject: Guidance for Preparation of the Diablo Canyon Allegations Evaluation. (3 pages)
PDR # 8312090330 1
3 Re: F01A-84-741, F01A-84-742, F0lA-84-743 and F01A-84-744 APPENDIX H (Continued)
RECORDS MAINTAINED AMONG PDR FILES 13.
12/9/83 Memo for Eisenhut from Mattson, subject: Response to Diablo Canyon Allegations. (27 pages) PDR # 8501230029
- 14. 1/17/84 Memo for Novak from Houston, subject: Low Pressure Injection Flow Alarm, re: 12/9/83 memo (Mattson to Eisenhut).
(5 pages) PDR # 8402030068 15.
1/23/84 Memo for Hayes from Ebersole, subject: Allegations Regarding Construction Practices at the Diablo Canyon Nuclear Power Station. (2 pages) PDR # 8603280174
- 16. 2/2/84 Petition Pursuant to 10 CFR 2.206 (53 pages) PDR #
1 8403060303
- 17. 2/6/84 Memo for Houston, Rubenstein and Booher from Novak, subject: Diablo Canyon ACRS Briefing on February 10, 1984 (2 pages) PDR # 8402130301, w/ attached: Advisory Committee on Reactor Safeguards Subcommittee on Diablo Canyon (3 pages) PDR # 8401250088 (288 pages) 18, 3/15/84 Memo for Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Staff Affidavits in Response to the Affidavit of John H. Cooper dated 1/19/84 and to Allegation No. 177. (1 page) PDR # 8404050267 w/ attached: Affidavit of Chu-Yu Liang (30 pages) PDR #
8403190119
- 19. 3/15/84 NRC Staff's Answer to Joint Intervenors' Motion to Augment or, in the Alternative, To Reopen the Record.
(29pages) PDR # 8403190100
- 20. 3/29/84 Ltr to Denton from D.A. Brand, PG&E, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, 10 CFR 2.206 Petition by GAP dated February 2, i
1984.
(41 pages) PDR # 8404030051
- 21. 4/19/84 Memo for Knighton from Sheron, subject: Diablo Canyon Units 1 and 2 - RHR Suction Line Isolation Valves.
(4 pages) PDR # 8405020415
- 22. 4/30/84 Ltr to Denton from PG&E, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units I and 2, 10 CFR 2.206 Petition by GAP dated March 1, 1984.(10pages) POR # 8405180261
ke: F01A-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX (Continued)H RECORDS MAINTAINED AMONG PDR FILES
- 23. 5/9/84 Ltr to Knighton from Schuyler, re: Docket No.
50-275, OL-DPR-76, Docket No. 50-323, Diablo Canyon Units 1 and 2, SSER 21 and 22 Item 100-Painting Inside Containment.
(5 pages) PDR # 8405140406
- 24. 5/21/84 Ltr to Schuyler from Knighton subject: Diablo Canyon -
RHR Suction Line Isolation Valves.
(4 pages)
PDR # 8406040115
- 25. 5/22/84 Ltr to Document Control Msk from Shiffer, re: Docket No.
50-275, OL-DPR-76, Diablo Canyon Unit 1, Licensee Event Report 83-034/0lT-1 Improper Wiring - RHR Pump Centrol Circuit. (3 pages) POR i 8405300098
- 26. 5/24/84 Ltr to Knighton from Scouyler, re: Docket No. 50-275, OL-DPR-76, RHR System Low Flow Alarm. (2 pages)
PDR # 8405300276
- 27. 5/31/84 Ltr to Hans Schierling from Thomas Devine, GAP (2 pages) w/ attached Affidavit (54 pages) PDR # 8406250316
- 28. 6/6/E4 Ltr to Knighton from Scttuyler, re: Occket No 50-275, OL-DPR-76 RHR System Lcw Flow Alarm. (1 page)
PDR # 8406110183
- 29. 6/8/84 Ltr to Knighton from Schuyler, re: Cocket No. 50-275, OL-DPR-76, Docket 50-323, Diablo Canyon Units 1 and 2 Request for Additional Initial Test. (12 pages)
POR # 8406120458 30, 7/2/84 Ltr to Knighton from J.0. Schuyler, re: Docket No. 50-275 OL-DPR-76 Diablo Canyon Unit 1. RHR System Low Flow Alarm (2pages) PDR # 8407090213
- 31. 7/3/84 Memo for Denton from Eisenhut, subject: Diablo Can Unit 1 - Full Power License Matters and Schedule (yon 5pages)
PDR # 8407230278
- 32. 7/10/84 Memo to Novak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No.
- 24. (9 pages) IDR # 8408290207 t
Re: F0IA-84-741, F01A-84-742, F01A-84-743 and F01A-84-744 APPENDIX f-(Continued) l RECORDS MAINTAINED AMONG PDR FILES
- 33. 7/10/84 Memo for hovak from Houston, subject: Diablo Canyon Nuclear Power Plant, Units 1 and 2 - SER Supplement No.
26.(25pages) PDR k E408290207
- 34. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Canyon Unit 2 Internal Review Program Summary and Status Report. (49 pages) PDR i 8408060126
- 35. 7/31/84 Ltr to Knighton from Schuyler re: Docket No. 50-323, Diablo Car. yon Unit 2, l' nit 2 Specific Design Aspects. (5 pages) PDR # 8408070278
]
- 36. '1/10/84 Memo for Eernero, Bishop, Grace Thompson, and Vollmer from Eisenhut, subject: Diablo Canyon Unit 2 - Licensing andReviewStatus.(2peges) PDR # 8410020068
]
- 37. 9/10/E4 Meeting Notice Distributton.
(3pages) PDR # 8409190150
- 38. 9/21/84 Ltr to Denton from Brand, re: Docket No 50-275, OL-DPR-76 Diablo Canyon Unit 1 License Amendment Request 84-10FeedwaterBypassYalves.(1page) PDR # 8409280387
- 39. 9/25/84 Ltr to Schuyler from Krdghton, subject: NRC Site Visit Regarding RHR S Test. (9 pages)ystem and Natural Circulation / Boron Mixing PDR e 8410150621 40.
10/3/84 Memo for Bernero, Grace., Speis, Thompson, and Vollmer from Eisenhut, subject: DiabloCanyonUnit2 Review.(8 papos) PDR 8410240359 l
41.
10/6/34 Ltr to Eisenhut from $chuyler, re: Docket No. 50-323 l
DiabloCanyonUnit2DesignReview.(12pages) j PDR # 8310170471 42.
10/19/84 Memo for Attached list from Knighton, subdect: ' Technical Specifications for Diablo Canyon Unit 2. (2 pages)
PDR i 8410310246 i
43.
11/2/84 Ltr to Knighton fron Shlffer, re: Docket No. 50-323 Diablo Canyon Unit 2. Allegation Review Program Status Report.
(176pages)
PDR # 8411150035 i
1 l
f
Re: FOIA-84-741, F01A-84-742 F0!A-84-743 and F01A-84-744 APPENDIX Fi (Continued)
RECORDS MAINTAINED AMONG PDR FILES i
44.
11/30/84 Distribution for Memo dtd 11/30/84 (4 pages) PDR i 8501070463 45, 12/10/84 Memo for Knighton from Sheron, subject: Diablo Canyon Allegations. (2 pages) PDR # 8412140319 46.
1/11/85 Ltr to Knighton from Shiffer, re: Docket No. 50-323 Diablo Canyon Unit 2, RHR Low Flow Alarm System. (1 page)
PDR # 8501170049
)
47.
1/11/85 Memo for Kirsch, Vollmer, Grace, Speis, Thompson and Bernero from Eisenhut, subject: Diablo Canyon Unit 2 Review. (6 pages) PDR # 8501160245 I
i I
)
i l
l
)
i f
GOVERNMENT ACCOUNTADill1Y PROJECT Institute for Pokey Studies 1901 Que Street N.W., Washington. D.C 20009 (202)234 9382 September 13, 1984 Director FREEDOM 07 gygg Office of Administration ACI REQUESI U.S. Nuclear Regulatory Coct:aission
(
b ~8 k-7 yf Washington, D.C.
20555 N
W 9"/7 '8 h To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 9552, the Government Accountability Project (GAP) requests copies of any and all agency remrds and informat ion, including but not limited to notes, letters, memoranda, u afts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, any other data compila-tions, interha and/or final reports, status reports, and any other records relevant to and/or generated in connection with the August 20, 1984 directors.'. decision under 10 C.F.R. 2.206 in r esponse to various petitions filed pursuant to 10 C.F.R. 2.206 by the Covernment Accountability Project (GAP) on behalf of the San Louis Obispo, Mothers for Peace. We request that each responsive document be identified by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. E552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and he.alth at nuclear power plants.
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
l h4l-Thomas Devine Cr tal Dixon Legal Director Legal Intern M.
+
-T
GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy 5tudies 100tCve Street N W. Woshington D C. 20000 (202) 234E i>- i...., u u., n.,,,
6 b
nu September 13, 1984 FREEDOM OF INFogg Director Of fice of Administration ACT REQUES h[$ g 2 g y {
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Get 'd 9 e<
To Whom It May Concern:
Pursuant to the Freedom of Information Act (F01A), 5 U.S.C. 9552, the Government Accountability Project (CAP) requests copies of any and all agency records and informat ion, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebook:2, books, telephone messages, computations, voice recordings, and any other records relevant to and/or generated in connection with the interim directors' decision under 10 C.F.R. 2.206 in response to July 27,1984, July 29,1984, July 30,1984, and July 31, 1984 petitions filed under 10 C.F.R. 2.206 on behalf of Timothy O'Neill and James McDermott. We request that each responsive document be indenti-fied by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a description of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP requests that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to the specific FOIA exemption, please provide an index itemizing and describing the documents or portions of,
j documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why such exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974:
We look forward to your response to this request within ten days.
Your truly, O CnMW Thomas Devine Crystal Dixon Legal Director Legal Intern
%5c,%'f0f85
. GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohcy Studies l
1901 Que Street. N W.. Woshington. D.C. 20009 (202)234 9382 September 13, 1984 Director FREEDOM OF INFORMATX)N Office of Administration U.S. Nuclear Regulatory Commission ACT REQUEST hM gY-Jg Washington DC 20555 To Whom It May Concern:
9 -/ 7 - 7 Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. $552, the Government Accountability Project (GAP) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports,-status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit I and 2, NUREG-0675, Supplement No. 26, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate.
If any of the materials covered by this request have been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s).
CAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 5552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes; whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I),
484 F.2d. 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Yours truly, m
5)
Cr{stal Dixon omas Devine y
Legal Director, GAP Legal Intern
+
j
, GOVERNMENT ACCOUNTADIUTY PROJECT Institute for Pohty Studies 1901 Que Street. N W. Washington. D C. 20000 (202)234 9382 September 13, 1984 FREEDOM OF INFORMATIOh Director ACI REQUEST hg Office of Administration
~
U.S. Nuclear Regulatory Commission kQg Washington DC 20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 5552, the Government Accountability Project (GA?) request copies of any and all agency records and information, including but not limited to notes, letters, memoranda, draf ts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures,, instructions, files, graphs, engineering analyses, charts, maps, photo-graphs, agreements, handwritten notes, studies, data sheets, notebooks, books, tele-phone messages, computations, voice recordings, any other data compilations, interim and/or final reports, status reports, and any other records relevant to and/or generated in connection with the Safety Evaluation Report related to the operation of the Diablo Canyon Nuclear Power Plant, Unit 1 and 2, NUREG-0675, Supplement No. 22, which provided the NRC Staff's further findings on whistleblower charges. We request that each responsive document be identified by the allegation number (s) to which it may relate.
-If any of the materials covered by this request has been destroyed and/or removed, please provide all surrounding documentation, including but not limited to a de-scription of the action (s) taken, relevant date(s), and justification (s) for the action (s).
GAP request that fees be waived, because " findings information can be considered as primarily benefitting the general public," 5 U.S.C. 8552(a)(4)(A). GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, pub-lications and public outreach, the project promotes whistleblowers as agents of government accountability. We are requesting the above information as part of an on-going monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portion of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen(I),
484 F.2d. 820 (D.C. Cir.1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Your truly Ad hMhD Thomas Devine Crystal Dixon Legal Director Legal Intern M w/
q.
.