Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as CopyrightML20129G612 |
Person / Time |
---|
Site: |
Millstone, Monticello, Davis Besse, Peach Bottom, Indian Point, Saint Lucie, Three Mile Island, Brunswick, North Anna, Diablo Canyon, Trojan ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
09/24/1996 |
---|
From: |
NRC OFFICE OF ADMINISTRATION (ADM) |
---|
To: |
Dekok D AFFILIATION NOT ASSIGNED |
---|
Shared Package |
---|
ML20125B444 |
List: ... further results |
---|
References |
---|
FOIA-96-207 NUDOCS 9610030103 |
Download: ML20129G612 (12) |
|
Similar Documents at Millstone, Monticello, Davis Besse, Peach Bottom, Indian Point, Saint Lucie, Three Mile Island, Brunswick, North Anna, Diablo Canyon, Trojan |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene ML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20217E9711999-10-13013 October 1999 Submits Notification of Major Changes to Trojan Liquid Radioactive Waste Treatment Sys,Iaw PGE-1201.Detailed Description of Change Provided ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML20217B3331999-10-0707 October 1999 Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 ML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl 1999-10-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217B3331999-10-0707 October 1999 Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified ML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink 1999-09-30
[Table view] |
Text
U.S. NUCLEAR REGULATORY COMMISSION NHC FotA HEcutst NUMBEHIS)
(, : FOIA 9s_207
% =eg\ RESPONSE TYPE
[
)
RESPONSE TG FREEDOM OF lnNAL l xleantiAt ps INFORMATION ACT (FOIA) REQUEST ^"
(....e ISEP 2 41995 DOCKET NUMBER (S)(if apphcable)
RE QUEST E rt nwia noienk PART 1.-AGENCY RECORDS RELEASED OR NOT LOCATED (See checkedboxes)
N) agency records subject to the request have been located.
N; additional agency records subject to the request have been located.
Requested records are available through another public distribution program. See Comments section.
Agency records subject to the request that are identified in Appendix (es) art. already available for public inspection and copying at the NRC Public Document Room 2120 L Street, N.W., Washington, DC.
Agency records subjec'. to the request that are identified in Appendix (es) C are being made available for public inspection and copying X st the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOI A nun.ber.
The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a member of my staff is now being made available for public inspection and copying at the N RC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOI A number.
Agency records subject to the request that are identified in Appendix (es) may be inspected and copied at the N RC Local Public Document Room identified in the Comments section.
Enclosed is inbrmation on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, NTt, Wr von. DC.
Agent a subject to the request are enclosed.
Records subject to the request have been referred to another Federal agency (ies) for review and direct response to you.
Fees You will be billed by the NRC for fees totaling $
You will receive a refund from the N RC in the amount of $ .
In view of NRC's response to this request, no further action is being taken on appeal letter dated , No.
PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated y in Part 11, B, C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and copying in the NRC Public Document Room,2120 L Str ett, N.W., Washington, DC in a folder under this FOI A number.
COMMENTS The record identified on Appendix D is copyrighted, and therefore, duplication is prohibited.
The records may be viewed.in the NRC Public Document Room located at 2120 L Street, NW, Washington, DC 20555.
The review of records subject to your request is continuing. We will contact you upon 1pletion of the review.
C 1
Oj I 4.
$f0NAT U $E, DIRECT i OF f HE D M F INFORMATION AND PUBLICATIONS SERVICES M.[ _
x / tu"f-Jv " ~
QY ., ,.
} 3 ,, m a L,.us e,n .4 ,
9610030103 960924 ;
i PDR FOIA t
.. ,DEKOK9_6 ,-207 ,. _PDR -
m..-~__.........m_ _ _ - . -
FotA NUMBEMsl DATE RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) REQUEST FOIA - 96-207 TEF 2 41995 (CONTINUATION) l PART 11 C- APPLICABLE EXEMPTIONS Records subject to the request that are described in the enclosed Appendix (es) E-G are being withheld in their entirety or in part under the Exemption No.(s) and for the reason (s) given below pursuant to 5 U.S.C. 552(b) and 10 CF R 9.17(a) of N RC regulations.
- 1. The withheld information is properly classifnd pursuant to Executive Order. (Exemption 1)
- 2. The withheld mformation relates solely to the mternal personnel rules and procedures of NRC. (Ezemption 2) l l3. The withheld mformation is specifically esempted from public disclosure by statute indicated. (Exemption 3)
$setions141 145 of the Atomic Energy Act, which prohibsts the disclosure of Restricted Data or Farmerly Restricted Data (42 U.S.C. 21612165L Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U.S.C. 2167).
- 4. The withheld mformation as a trade secret or commercial or financial mformation that is being withheld for the reasonist indicated. (Exemption 4)
The mformation is considered to be confidential business lpropnetary) mformation.
X The information is considered to be proprietary .nformation pursuant to 10 CFR 2 790(dM1)
The mformation was submrtted and received m confidence pursuant to 10 CFR 2 790tdH2)
- 5. The withheld mformation consists of mteragency or mtraagency records that are not availabie through discovery dunng htigation (Exemption 5). Apphcable Privilege:
Deliberative Process. Disclosure of predecisional information would tend to mhibit the open and frank enchange of sdeas essential to the deliberative process Where recoros are wethheld m their entirety. the f acts are sneutricably intertwmed with the predecisional mformation There also are no reasonably seiyegable factual portions oecause the release of the f acts would permit an mdirect inquiry mto the predecisional pror.ess of the egency Attorney work product pnvalege (Documents prepared by an attornew m contemplation of litigation i Attorney-client pr yilege. (Confidential communications between an attorney and his/her chent.)
- 6. The withheld mformation as enempted from public disclosure because its disclosure would result m a clearly unwarranted mvasion of personal pr vacy (Exemption 6)
- 7. Tr e withheld information consists of records competed for law enforcement purposes and as bemg withheld foi the reason (s) mdecated (Exemption 7) i Disclosure could reasonably be expected to mterfere with an enforcement proceedmg because it could reveal the scope, direction, and focus of enforcement efforts, and thus could possibly allow recipients to take action to shield potential wrongttomg or a violation of NRC requirements from investigators. (ExemgNn 7 (A))
i Disclosure would constitute an unwarranted mvasion of personal privacy. (Exemption 7(C))
]
i The mformation consists of names of individuals and other mf ormation the d,6 closure of which could reasonabh be espected to reveal idertsties of confident >al sources. (Enemption 7 (D))
OTHER l FART 11. C-DENylNG OFFICIALS i Pursuent to 10 CFR 9 251b) and or 9 25(cl of the U S. Nuclear Ryulatory Commwon segulat1ons, it has been determmed that the mformatvon ethheld is exempt from pro ,
duction or disclosure, and that its production or d sciosure iv contrary to the pubLc inteent. T% persons respons'bie for the denial are those officials identified below as denymg !
officials end the Director, Desion of Freedom of Information and Publ. cations Services. Off.ce of Admmistestion for any deniais that may be appesied to the Faecutive Director )
for Operations (f DOI. -
l DENYING OFFICIAL TlTLE OFFICE RECORDS DENIED APPE LL ATE OF FICI AL EDO SECRETARY 10 I William T. Russell Director, NRR Appendix E XX l Hubert J. Miller Regional Administrator, Reg.1 Appendix F XX Associate General Counsel for
' lStephenG. Burns Hearings, Enforcement and Adm. Appendix G XX l
1 l
l PART II. D- APPEAL RfGHTS Thl demal by each denying official identified in Part ll.C may be appealed to the Appellate Off,cial identif A there. Any such appeal must be made in wot,ng withm 30 days of receipt (f ihic response. Appeals must be addressed, as oppropriate, to the i mecutive Director for Operations, to the Secretary of the Commission, or to the Inspector General. U S. Nuclear i
Negulatory Commistoon, Washington, DC 205b5. and should clearly state on the envelope and in the letter that it is an Appeal from an initial F OI A Decision. '
fLC FORJ 464 (Part 2) (191) U.S. NUCLEAR REGULATORY COMMISSION
l
, j l
Ret FOIA-96-207 I
APPENDIX C DOCUMENTS BEING RELEASED IN THEIR ENTIRETY j NUMBER DATE DESCRIPTION
- 1. 1/31/72 Memo from L. Manning Muntzing to the Commission, subject: Status and Impending '
Action on Applications Requiring Show Cause :
Action. (5 pages) [ NOTE: Sama portions of ,
this record are outside the scope of the i request.]
l
- 2. 10/6/72 Letter from James O'Reilly to J. G. Miller i regarding construction activities. (11 pages) j
- 3. 11/3/72 Letter from J. G. Miller to J. O'Reilly regarding response to AEC/DRO Audit of August 14 through 17, 1972. (18 pages)
- 4. 12/14/72 Letter from J. G. Miller to Jamt- O'Reilly regarding Quality Assurance Program. (3 Pages)
- 5. 5/15/73 Letter from J. G. Miller to J. O'Reilly regarding findings identified in the 3/28/73 audit exit interview. (14 pages)
- 6. 5/1/75 Memo from - Henry McGurren to Stuart Treby, subject: METED Unit 1--Prenotice. (1 page)
- 7. 8/29/75 SECY-75-486, Utilization of the Random Sample Inspections Technique as a Method of Quantifying the NRC Inspection Program. (21 Pages)
- 8. 9/26/75 Memo from S. J. Chilk to Lee Gossick, regarding SECY-75-454, Investigation of the Alleged Security Problem at Three Mile Island i Nuclear Power Station, with attached draft !
letters. (14 pages) j 1
- 9. 4/22/76 Memo from Henry McGurren to Stuart Treby, ,
l' subject: TMI, Unit No. 1 -
Appendix H Exemption. (2 pages)
- 10. 4/23/76 Memo from Henry McGurren to Bill Ross, )
subject: TMI Unit 1 -Appendix H Exemption.
(1 page)
- _ _ _ . - _ . _. _ . - _ _ . - _ . - . . - . _ - . - . . _ - . _ _ - - - - . . - - .. . . . _ =
Re: POIA-96-207 APPENDIX C DOCUMENTS BEING RELEASED IN THEIR ENTIRETY (Continued)
NUMBER DATE DESCRIPTION )
1
- 11. 1/26/78 Memo from D. L. Caphton to K. V. Seyfrit. (4 Pages)
- 12. 5/2/78 Memo from D. L. Caphton to K. V.Seyfrit, subject: Three Mile Island 1 Appendix J Exemption Request. (9 pages)
- 13. 10/17/78 Letter from G. J. Troffer to Frederick Marrocco regarding Noncompliance notification 78-22. (2 pages)
- 14. 12/8/78 Memo from W. O. Miller to R. W. Reid, subject:
License Amendment Fee for TMI-1 Application dated August 30, 1978. (2 pages) i
. - _- . . . . . ... ._ . -- - -. - - - . . . ~ _ _ - -
i
- Re: FOIA-96-207 l
i APPENDIX D !
COPYRIGHTED RECORD
- NUMBER DATE DESCRIPTION !
l 1. 2/18/82 Letter from Dr. D. D. Macdonald, Fontana Corrosion Center, to Dr. Paul Wu, NRC, j subject: Cctrosion Damage to the Steam j Generator of TMI PWR Ho. 1 Unit, attaching ;
j article entitled, " Corrosion of Copper-Nickel Alloys in Sea Water Polluted with Sulfide and {
Sulfide Oxidation Products." (16 pages) ;
- NOTE: This record is copyrighted and duplication is prohibited.
The record may be viewed at NRC's Public Dorument Room.
l l
I l
I i
9
i
. 1 I
Re: FOIA-96-207 -
I l
APPENDIX E l DOCUMENTS BEING HELEASED IN PART NUMBER DATE DESCRIPTION 1.- 8/8/74 Operator License - OP-3614. (3 pages)
Portions withheld - EX. 6
- 2. 7/29/77 Senior Operator License - SDP 2485-1. (8 pages) Portions withheld - EX. 6
- 3. 11/9/77 Senior Operator License - SOP 2485-1. (7 pages) Portions withheld - EX. 6
- 4. 9/14/78 Letter application for a Senior reactor Operator's license examination. (8 pages)
Portions withheld - EX. G
- 5. 9/14/78 Letter application for a Senior Reactor Operator's license examination. (6 pages)
Portions withheid - EX. 6
- 6. 9/14/78 Letter application for a Senior Reactor Operator's license examination. (9 pages)
Portions withheld - EX. 6 7, 9/14/78 Letter application for a Senior Reactor Operator's license examination. (6 pages)
Portions withheld - EX. 6
- 8. 9/14/78 Letter application for Reactor Operator's license examination. (3 pages) Portions withheld - EX. 6
- 9. 9/27/78 Senior Operator License - SOP 2786-2 (1 page) Portions withheld - EX. 6
- 10. 11/6/78 Senior Operator License - SOP 2785-2. (1 page) Portions withheld - EX. 6
- 11. 11/9/78 Letter attaching renewal application. (4 pages) Portions withheld - EX. 6 12, 12/G/78 Operator License OP-4888. (1 page) Portiens withheld - EX. G
- 13. 12/6/78 Operetor License OP-4890 (corrected copy).
(1 page) Portions withheld - EX. G
m Her FOIA-96-207 APPENDIX E DOCUMENTS BEING RELEASED IN PART (Continued)
NUMBER DATE DESCRIPTION
- 14. 12/6/78 Senior Operator License SOP 3394. (1 page)
Portions withheld - EX. G
- 15. 12/6/78 Senior Operator License SDP 3395. (1 page)
Portions withheld - EX. 6 i
- 16. 12/6/78 Senior Operator License SOP 3393. (1 page)
Portions withheld - EX. G
- 17. 12/6/78 Operator License OP 4889. (1 page) Portions withheld - EX. G
- 18. 12/29/78 Senior Operator License SOP 2751-1. (1 page)
Portions withheid- EX. G r
- 19. 1/5/79 Senior Operator License SDP 2866-2. (1 page)
Portions withheld - EX. G
- 20. 1/24/79 Letter enclosing results of Metropolitan Edison Company Cross Licensing Test. (2 !
pages) Portions withheld - EX. G ]
- 21. 1/31/79 Letter application for Reactor Operator's license examination. (4 pagen) Portiono withheld - EX. G
- 22. 1/31/79 Letter application for a Reactor operator's license examination. (3 pages) Portions withheld - EX. G
- 23. 1/31/79 Letter application for a Reactor Operator's license examination. (3 pages) Portions withheld - EX. G
- 24. 1/31/79 Letter application for a Reactor Operator's license examination. (3 pages) Portions withheld - EX. G
- 25. 1/31/79 Letter application for a Reactor Operator's license examination. (3 pages) Portions withheld - EX. G
l
. Re: FOIA-96-297 ;
APPENDIX E DOCUMENTS BEING RELEASED IN PART '
(Continued) i NUMBER DATE DESCRIPTION }
l
- 26. 1/31/75 Letter application for a Reactor Operator's license examination. (3 pages) Portions withheld - EX. 6
- 27. 1/31/79 Letter application for a Senior Reactor l Operator's license examination. (4 pages) '
Portions withheld - EX. 6 !
l
- 28. 1/31/79 Letter application for a Senior Reactor Operator's license examination. (5 pages)
Portions withheld - EX. 6 P
- 29. 12/19/? Operator license. (1 page) Portions withheld - EX. 6 30, 10/27/78 Letter from Met Ed to NRR, subject: Modified l Amended Physical Security Plan - Revision 3.
(3 pages) -Portions withheld EX. 4
- 31. 12/11/78 Letter from NRC Division of Project Management to individual, regarding test results. (2 pages) Portions withheld - EX. .
6 i
i I
i l
l 1
m__ _ . _ . . _ . _ . _ _ .
2 l
- Re: FOIA-96-297 l l
' APPENDIX F I f
DOCUMENTS BEING RELEASED IN PART NUMBER DATE DESCRIPTION
- 1. 4/2/74 Letter from Walter Martin to R. C. Arnold regarding inspection conducted on March 18-19, 1974, (2-pages), released; with enclosed Description of Incomplete-Physical Protection Requirements, (11 pages), withheld pursuant to EX. 4.
- 2. 4/3/74 Letter from Walter Martin to John Miller regarding inspection conducted March 20-21, 1974, (2 pages), released; with enclosed RO Inspection Report No. 74-16, (7 pages),
withheld pursuant to EX. 4.
- 3. 5/6/76 Letter from Walter Martin to R. C. Arnold regarding inspection conducted March 23-25, 1976, (2 pages), released; with attached Notice of Violation an IE Inspection. Report No. 50-289/76-08, (11 pages), withheld pursuant to EX. 4.
4, 6/15/76 Letter from Walter Martin to R. C. Arnold, attaching transmittal letter from R. C.
Arnold to J. O'Reilly, (2 pages), released; with enclosed Response to Apparent Deficiency, (4 pages), withheld pursuant to EX. 4.
- 5. 7/19/76 Letter from Walter Martin to R. C. Arnold regarding Inspection No. 76-08, (1 page),
released; with attached 7/9/76 letter from R. C. Arnold to J. P. O'Reilly, (2 pages),
withheld pursuant to EX. 4.
- 6. 5/10/77 Letter from Walter Martin to R. C. Arnold regarding Inspection 50-289/77-13, (2 pages),
released; with attached Inspection Report 77- l 13, (5 pages), withheld pursuant to EX. 4.
- 7. 12/19/77 Letter from Walter Martin to J. G. Herbein regarding Inspection Report 50-289/77-36, (2 pages), released; with attached Hotice of Violation and Inspection Report 50-289/77-36, (10 pages), withheld pursuant to EX. 4.
1
. . ~.._-- .- ..-- - . .- -. _- = . - - .
4 I
l 1
l l
I Re: FOIA-96-297 l l
APPENDIX F k DOCUMENTS BEING RELEASED IN PART ;
(Continued)
NUMBER DATE DESCRIPTION i
l
- 8. 6/26/78 Letter from Walter Martin to J. G. Herbein <
regarding Inspection Report 50-289/77-36, (2 l pages), released; with enclosures: a) response to licensee's response to citation, (2 pages), withheld pursuant to EX. 4, b) l 1/10/78 letter from J. Herbein to E. Brunner, ;
(1 page), released, and, c) Response to Apparent Violation, (1 page), withheld pursuant to EX. 4. ;
i'
- 9. 7/26/78 Letter from Walter Martin to J. G. Herbein regarding Inspection 50-289/77-36, (1 page), ;
released; with attached letter from J. G. j Herbein to E. Brunner providing corrective j and preventive actions, (3 pages), withheld pursuant to EX. 4.
l l
I
-l
l Re: FOIA-96-207 APPENDIX G DOCUNENTS BEING RELEASED IN PART NUMBER DATE DESCRIPTION
- 1. 11/19/73 Letter from the NRC Assistant General Counsel for Licensing and Regulation to a U. S.
Senator, (2 pages), released, with attached constituent letter, (3 pages), portions withheld pursuant to EX. G.
I
)
i I
i l
i i
, , , - - - - , r- --
. s 0
David Deliok i 13 Conoy St.
Ilarrisburg, Pa.17104 May 12,1996 fAfED0lf 0FINFORMATION ACT REQUEST Division of Freedom of Information and Publication Services Office of Administration and Resources Management IorA-9l.-do7[,
tL g-l4-j Nuclear Regulatory Commission Washington, D.C. 20555 Re: Freedom of Information request
Dear Sir or Madam:
Pursuant to the Freedom of Information Act, I hereby request copies of the following:
Reports of inspection conducted by the Atomic Energy Commission at General Public Utilities Corp.'s Three Mile Island Unit I for the following dates: April 7,1972, July Il-14,1972, and March 26-28, 1973. These are not in the Public Document Room.
--Repotis from meetings between AEC and GPU personnel on May 1 and May 8,1973. These are not in the PDR.
-Any other documents in your national or regional files pertaining to Three Mile Island Unit I between 1966 ana March 27,1979,which have not yet been placed in the PDR.
--Any correspondence between the AEC and Gilbert Associates. Inc of Reading, Pennsylvania, pertaining to TMI Unit I from the period 1966-March 27,1979. Gi!bert was the architect / engineer of TMI Unit
- 1. .
TiO705CO77 '2pP
I s
= 1 t- l l
--Any correspondence between the AEC and United Engineers and i Contractors pertaining to TMI Unit I during the period 1966-March i 27,1979. UAE was the general contractor for TMI Unit 1. !
Pursuant to the Freedom of Information Act, I also request
" Representative of the News Media" status, which entitles me to a :
waiver of search fees and 100 pages of free copying. These documents l are needed for a book I am writing on the history of General Public '
Utilities Corp. I am an established freelance writer, the author of one ,
previous book. Un.wn Arnger:.4 TrxeedydArople, Government and l the Centes//s # hic /he: was published in 1986 by University of ;
Pennsylvania Press. In addition, I have been a newspaper journalist for 20 years.
Thank you f >r pur attention to this request.
Sincerely, )
U .e myid ScT6k l
t
==.,.................................
Copyrighted Document Addressed Under FOIA For hard copy, -
.e refer to PDR Folder:FOIA -&2o7 _
FOIA Name & Number: ANb E' 5 75~A07 Fages: Arco hA. h - 1 % 4-95 /t w m c,h ,
i