Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld
ML20202D728
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/26/1999
From: Oatley D
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-99-010, DCL-99-10, NUDOCS 9902020095
Download: ML20202D728 (1)


Text

_

.. Pacific Gasand i Electic Company David H. Datley Diablo Canyon Power Plant

  • ,.
  • Vce President-Diablo Canyon PO Box 56 Operations and Plant ManaDer Avila Beach. CA 93424 805 545 6000 January 26,1999 i PG&E Letter No. DCL-99-010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Chance 15 to Revision 18 of the Physical Security Plan

Dear Commissioners and Staff:

Enclosures 1 and 2 contain safeguards information regarding changes to Revision 18 of the Diablo Canyon Power Plant Physical Security Plan (PSP). These changes do not decrease the safeguards effectiveness of the plan and are submitted pursuant to 10 CFR 50.54(p).

Enclosure 1 describes the proposed revisions to the PSP. Enclosure 2 includes the pages of the PSP incorporating the changes identified in Enclosure 1. Changes are indicated by side bars in the left margin.

Should you require further information or clarification, please contact Ron Todaro, Security Director, at (805) 545-4309.

Sincerel ,

David H. Oatley cc: Ronald G. Todaro CCC/RMS l

Enclosures 0200 0

l

$ SECURITY SAFEGUARDS INFORMATION i j [When Separated From Enclosures Handle This Document As Decontrolled]

9902020095 990126 f /