Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl
ML20134K342
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/06/1997
From: Liza Cunningham
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
TAC-M96129, TAC-M96130, NUDOCS 9702130250
Download: ML20134K342 (3)


Text

.

i

)

^

.[PRfi\t e-ooo CAFEGUARDS INFORMATION ooo UNITED STATES-j j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565 4 001 o

+9 . . .. . ,o February 6,1997 Mr. Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Business Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 & 2 -

OPERATIONAL SAFEGUARDS RESPONSE EVALUATION (TAC NOs.

M96129 & M96130)

Dear Mr. Rueger:

This letter conveys the results and conclusions of the Operational Safeguards Response Evaluation (OSRE) conducted by the NRC's Office of Nuclear Reactor Regulation at the Diablo Canyon Nuclear Power Plant, Units 1 & 2, facility from September 9 through September 12,1996.

One purpose of the OSRE program is to evaluate a licensee's ability to respond in a contingency to an external threat by focusing on the interactions between operations and security in establishing priorities for protection of equipment and on the defensive strategies used. The OSRE also includes a safety / safeguards interface review to assure that safeguards measures do not adversely affect safe operation of the facility.

The OSRE conclusions are documented in the enclosed report. This enclosure, which contains safeguards information of a type specified in 10 CFR 73.21, will not be placed in the Public Document Room, and must be protected against unauthorized disclosure.

The drills, exercises, and demonstrations observed by the team and the results of interviews conducted by the team indicated that, overall, the security force demonstrated an effective contingency response capability. The team also noted the high quality and extent of operations involvement in the planning and exercising of the contingency response capability. The team also concluded that effective provisions were in place to assure that safeguards measures did not adversely affect the safe operation of the f acility.

E -Yudsesen af prusortium segurummames for Fartammre commmmes SAFFCUARDS INFORMA110N SArtGUARDS INFORMATION smhemet en Upon summersi er h this darumment CIYll, and CRIMINAL T is DF] CONT 1tOIDA 13004g

      • SAFEGUARDS INFORMATION ***

i@

9702130250 970206 10 PDR ADOCK 05000275 F PDR

--s

1 000 SAFO;UARD2 INFCRMATION 000 G. Rueger The enclosed report does not convey any new regulatory requirement. Its findings have ,

been considered with respect to your ability to meet the general performance objective and )

requirements of 10 CFR 73.55(a).

This letter affects one respondent and, therefore, is not subject to the Office of ,

Management and Budget review under Public Law 96-511.

If you have questions concerning this evaluation, we will be pleased to discuss them with you.

Sincerely, Original signed by LeMoine J. Cunningham, Chief Safeguards Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-275 & 50-323

Enclosure:

Operational Safeguards Response Evaluation l

l Enclosure contains EAFEGUARDS INFORMATION Upon removal of enclosure this document is DECONTROLLED.  :

I DISTRIBUTION W/ ENCLOSURE Docket Files 50-275/323 RKeimig, R-l PFredrickson, R-il PSGB OSRE Diablo Canyon File JCreed, R-Ill BMurray, R IV DISTRIBUTION W/O ENCLOSURE PSGB R/F NRC PDR DRPM/F Local PDR TMartiti SBloom MTschiltz, SRI l DOCUMENT NAME: As\DIABoSRE.WP4

  • SEE PREVIOUS CONCURRENCE i Ta receive a copy of thee document, Indicate in the boa: *C" = Copy w/o l sttachment/ enclosure *E* = Copy w/ettechment/ enclosure *N* = No copy g j OFFICE PSGB NRR C RIV C PDIV-2:NRR Bq M,7 h lN l l NAME Dorrik* DSchaefer* WBateman* TIC,MghaTn DATE 01/19/97 01/21/97 01/29/97 0'2 M /97 l

OFFICIAL RECORD COPY

      • SAFEGUARDS INFORMATION *** l 1

j

l l "

a

. Mr. Gregory M. Rueger cc'w/o encl: ,

NRC Resident Inspector Regional Administrator, Region IV Diablo Canyon Nuclear Power Plant U.S. Nuclear Regulatory Commission l c/o U.S. Nuclear Regulatory Commission Harris Tower & Pavillion P. O. Box 369 611 Ryan Plaza Drive, Suite 400 Avila Beach, California 93424 Arlington, Texas 76011-8064 Dr. Richard Ferguson, Energy Chair Christopher J. Warner, Esq.

Sierra Club California Pacific Gas & Electric Company 1100 lith Street, Suite 311 Post Office Box 7442 Sacramento, California 95814 San Francisco, California 94120 Ms. Nancy Culver Mr. Robert P. Powers San Luis Obispo Vice President and Plant Manager Mothers for Peace Diablo Canyon Nuclear Power Plant P. O. Box 164 P. O. Box 56 Pismo Beach, California 93448 Avila Beach, California 93424 Chairman Telegram-Tribune San Luis Obispo County Board of ATTN: Managing Editor  ;

Supervisors 1321 Johnson Avenue ,

P.O. Box 112 Room 370 County Government Center San Luis Obispo, California 93406 j San Luis Obispo, California 93408 i Mr. Truman Burns Mr. Robert Kinostan California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch '

State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq. l Legal Counsel 857 Cass Street, Suite D Monterey, California 93940 l k

i

- . . - .