IR 05000275/1992032

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21)
ML20126B257
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/11/1992
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9212220027
Download: ML20126B257 (3)


Text

< A G f t i A A O c: IN!!OFM/, A TH"st,

/* % UNITED STATES

, p '~ 8,, NUCLEAR REGULATORY COMMISSION

{ .l REGION V 1450 MARIA LANE k ,,,,, /

9 WALNtfT CREEK.CAUFORNIA 94596 5368 DEC 1119*

Dockets No. 50-275 and 50-323 Licenses No. DPR-80 and DPR-82 Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 '

P.O. Box 770000 .

San Francisco, California 94177 ,

Attention: G. M. Rueger Senior Vice President and General Manager ,

Nuclear Power Generation Business Unit SUBJECT: NRC INSPECTION REPORT 50-275/92-32 AND 50-323/92-32 This refers to the inspection conducted by L. R. Norderhaug and D. W. Schaefer of this office on November 16-19, 1992. The inspection included a review of activities authorized for your Diablo Canyon Power Plant. At the conclusion of the inspection, the findings were discussed with those members of.your staff identified in the enclosed repor Areas examined during the inspection are identified-in the enclosed repor Within these areas, the inspection consisted of- selective examinations of-procedures and representative records, interviews with factitty and contract-personnel, and observations of activities in progress. The inspection findings are documented in the enclosed inspection repor Based on the results of this inspection, certain of your activities appeare to be in violation of NRC requirements, as specified in the enclosed Notice of *

Violation (Notice). The violation pertains to your- failure to withdraw from the Security Safeguards Access List, the-names of two individuals whose employment- had been )reviously terminated. This violation is of- particular concern because of tie large number of, individuals: included on the Security -

-

, Safeguards Access List, the number of " defects" found in a small sample from-

that " population" and the length-of time these defects had existed.

You are required to respond to this letter and should follow the instructions l specified in the enclosed Notice when preparing your response. In your L response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. -After reviewing your response to this l Notice, including-your proposed corrective actions and the results-of future inspections, the NRC will determine whether further NRC enforcement actions is necessary to ensure compliance with NRC regulatory requirements.

L 7u m m .-

9 c0 nuns M o

N[0Mb75 2 o gM

~D l t. I 5:a ,

T.GOM DS INFORM ATION

-. ,

.

,

.

'

y 2 The response directed by this letter and the enclosed Notice is not subject t the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96-51 The material enclosed herewith contains Safeguards Information as defined by 10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energ/ Act of 1954, as amended. Therefore, the material will agi be placed in the Public Document Roo Should you have any questions concerning this letter, we will be pleased to-discuss them with yo

Sincerely, lh *

Robert J. Pate, Chief '

Safeguards, Emergency Preparedness and Non-Power Reactor Branch Enclosures: Notice of Violation B .- Inspection Report Nos. 50-275/92-32 and 50-323/92-32 cc w/ enclosure:

J. A. Sexton, PG&E J. D. Townsend, Vice President / Plant Manager, PG&E C. J. Warner, Esq. Attorney D. A.-Taggart, Director, Quality Support, PG&E B. Thomas, News Services, PG&E T. L. Grebel, Regulatory Compliance Supervisor, PG&E--

L. Shaffer, Director, Corporate Security, PG&E R. Todaro, Security Director, Diablo Canyon cc w/o enclosure: '

State of California Bob Hendrix

.

.

L

.

'

l D

L: -

. _ , _ _- _-

-

- - - . , . - . ..-. . . _.. - _

._ .

=. . _ . ,~ - . -

.

'

bec w/ enclosure:

Docket file B. Faulkenberry J. Martin bec w/o enclosure:

Project Inspector '

Resident inspector '

G. Cook M. Smith J. Zo111 coffer Region / ann LNorderhaug DSchpefe ssfl

"

PJ

./

n bf RHuey 12/g/9,2 12/7/92 12/4 2 12/g/92 F3E ST CUPV?

MES A NO [REQUESTCOPY;l REQUESTf0RY]

'

YES /(N011 STCOPTi

' YES) / NO ES. / N0

'

V u V (./

RPate-12/// /9 hE i 4F v me,

.,

1