Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER
ML20058N850
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/10/1990
From: Remick F
NRC COMMISSION (OCM)
To: Dingell J
HOUSE OF REP., ENERGY & COMMERCE
Shared Package
ML17083C285 List:
References
NUDOCS 9008150185
Download: ML20058N850 (1)


Text

.

'g  ;

s

. - Sm i.t; Y k, UNITED STATES a 1 NUCLEAR REGULATORY COMMISSION

r. j wAswiwoToN o,c.2osas

\, . g , . / August 10, 1990 CHAIRMAN l

i The Honorable John D. Dingell Chairman, Subcommittee on Oversight l and Investigations 1 Committee 06: Energy and Commerce ,

United States House of Representatives Washington, D.C. 20515

Dear Mr. Chairman:

I am responding to your letter of July 9, 1990, which enclosed a letter from Representatives Barbara Boxer and Leon E. Panetta regarding the seismic saf ety of the Diablo Canyon Nuclear. Power Plant. Representatives Boxer and Panetta expressed concern about the nature of the Hosgri fault which lies near the plant, and whether ground motion at the plant caused by an earthquake on the fault could be more severe than currently anticipated.

At the present time, the NRC staff is reviewing a seismic re-evaluation of the plant that the Pacific Gas and Electric Com >any recently conducted. The NitC staff is thoroughly f amiliar wit t the Hosgri f ault issues and is evaluating them as part of its review.. The NRC review team consists of a nrmber of NRC staff experts in the areas of geology, seismology, engineering, and probabilistic risk assessment. To assist in the review, the NRC has retained consultants from universities, national labora-tories, the U.S. Geological Survey, and several consulting firms.-

The-staff review team will consider the recommendations of all of its consultants in reaching a decision regarding the adequacy of the seismic design of Diablo. Canyon.

This fall, the NRC will complete its review of the Diablo Canyon

,' seismic re-evaluation program and will document the findings in a Safety Evaluation Report. We will be pleased to send a copy of the report to you and to Representatives Boxer and Panetta when it ,

is issued.

Sincerely,

/. /

/

For J. Remick A 6 ng Chairman cc: Representative Barbara Boxer p

Representative Leon E. Panetta 11