Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20154P0741988-05-26026 May 1988 Forwards Notice of Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 in Response to 880520 Application to Revise Tech Specs Re Section 6.0, Administrative Controls ML20154F9191988-05-17017 May 1988 Advises That Portions of 880419 Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Requests Resubmittal of Corrected Plan Pages as Necessary to Maintain Plan Continuity ML20151G1381988-04-14014 April 1988 Responds to FOIA Request for Documents Re ACRS Meeting on Plant.Forwards Dj Skovholt 750324 Memo to F Schroeder Concerning Plant pre-ACRS SER Suppls.Charges for Search, Review & Reproduction Provided ML20196D6091988-02-0101 February 1988 Forwards Exam Rept 50-275/OL-87-02 on 871208-17.Corrected Exam Keys Encl ML20235E1691987-09-21021 September 1987 Advises of Unauthorized Use of Health Physics Network (HPN) Emergency Communication Sys.Requests Review of Adequacy of Controls & Procedures Implemented at Facility to Ensure Only Govt Authorized Use of HPN ML20235D0021987-09-18018 September 1987 Advises That Written & Oral Operator & Senior Operator Licensing Exams Scheduled for 871208-17.Ref Matls Listed in Encl 1 Required by 871013.Requirements for Administration, Rules & Guidelines & Review Requirements Also Encl ML20239A4721987-09-0404 September 1987 Forwards Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817.Communication of Mgt Expectations Addressed IR 05000275/19870231987-08-20020 August 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/87-23 & 50-323/87-22 ML20214Q2691987-05-22022 May 1987 Forwards Info Re Loss of RHR While in mid-loop Operation on 870410.Info Provides Guidance for Any Operating Procedure Rewriting Which May Be in Progress & for Incorporation Into Operator Training Program ML20214J8671987-05-0808 May 1987 Forwards Insp Repts 50-275/87-18 & 50-323/87-15 on 870420- 24.No Deviations or Violations Noted ML20204E2331987-03-20020 March 1987 Forwards Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19 & Potential Enforcement/Unresolved Items.Four Deficiencies Will Be Referred to Region V for Further Action.Corrective Actions Should Be Not Be Delayed ML20204B8521987-03-19019 March 1987 Advises That 861121 Rev 15 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20207S7321987-03-13013 March 1987 Ack Receipt of in Response to 870204 Notice of Violation ML20207S8571987-03-13013 March 1987 Extends Invitation to Attend 870414 Meeting in Denver,Co to Discuss 10CFR50.55 Change.Proposed Agenda Encl ML20205D7121987-03-11011 March 1987 Forwards Insp Repts 50-275/87-09 & 50-323/87-08 on 870223- 27.No Violations Noted ML20212M1131987-02-23023 February 1987 Forwards Insp Repts 50-275/87-04 & 50-323/87-04 on 861228- 870207.No Violations Noted ML20211M8581987-02-19019 February 1987 Confirms 870306 Mgt Meeting W/Util at Plant to Discuss 870102 & 10 Events & Insp Findings.Meeting Agenda Encl ML20211B1511987-02-13013 February 1987 Advises That Bolt SAE J429K,Grades 8 & 8.2 Did Not Satisfy Vendor Program Branch Fastener Evaluation Program.Bolt Did Not Pass Tensile Strength Requirement.Info Re Actions on Nonconforming Condition & Bolt Insp Practices Requested ML20212A1871987-02-12012 February 1987 Forwards Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06.No Violations Identified ML20211C8971987-02-12012 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in ML20211M1531987-02-10010 February 1987 Forwards Insp Rept 50-275/87-06 on 870112-13 & Notice of Violation.Nonemergency Telephone Calls Directed to Control Room During 870102 Event Had Negative Impact on Handling of Emergency IR 05000275/19870021987-02-0404 February 1987 Forwards Safeguards Insp Repts 50-275/87-02 & 50-323/87-02 on 870112-16 & Notice of Violation.Insp Repts & Notice of Violation Withheld (Ref 10CFR2.790) ML20210E9591987-02-0404 February 1987 Advises of 870311 Workshop on NRC Incident Investigation Program (Iip) in Walnut Creek,Ca to Provide Info Re NRC Process for Investigating Potential Significant Incidents. Agenda Encl.W/O Iip Procedures ML20210R0741987-01-30030 January 1987 Forwards Insp Repts 50-275/86-32 & 50-323/86-30 on 861109- 1227 & 870116.No Violations Noted ML20210R2341987-01-30030 January 1987 Forwards Insp Repts 50-275/87-03 & 50-323/87-03 on 870112- 16.No Violations Noted ML20210R9821987-01-29029 January 1987 Forwards Insp Repts 50-275/87-05 & 50-323/87-05 on 870112- 16.No Violations Noted ML20210B3081987-01-22022 January 1987 Forwards Exam Rept 50-275/OL-86-02 of Exams Administered on 861202-04.Exam & Answer Key & Power Plant Exam Results Summary Also Encl ML20212B2191986-12-23023 December 1986 Advises That 860821 Rev 14 Drawings to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20212A5771986-12-18018 December 1986 Informs That Emergency Plan SOP III.25 Will Be Placed in PDR Due to Document Not Meeting 10CFR2.790(a)(7)(vi) Withholding Provisions.Document May Be Withdrawn If Requested within 30 Days IR 05000275/19860291986-12-0909 December 1986 Discusses Insp Rept 50-275/86-29 on 860928-1108 & Mgt Meeting Rept 50-275/86-34 on 861124 & Forwards Notice of Violation ML20214U6031986-12-0303 December 1986 Confirms 861215-19 Equipment Qualification Insp at Facility. Insp Will Include Review of Implementation of 10CFR50.49 Program ML20215M9001986-10-16016 October 1986 Forwards SALP Repts 50-275/86-22 & 50-323/86-22 for Aug 1985 - Jul 1986.Mgt Meeting Not Required,But May Be Requested within 10 Days of Ltr Date IR 05000275/19860241986-10-0303 October 1986 Forwards Safeguards Insp Repts 50-275/86-24 & 50-323/86-24 on 860825-0903.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20206T9351986-09-17017 September 1986 Forwards Insp Rept 50-275/86-25 on 860825-29.No Violations Noted ML20206R4271986-09-0202 September 1986 Forwards Exam Rept 50-275/OL-86-01 of Exam Administered on 860715-23 for Units 1 & 2 ML20205C2791986-08-0606 August 1986 Grants 860715 Request to Delay Calibr of Reactor Coolant Pressure wide-range Instruments to No Later than 860919.If Reactor Taken Subcritical Prior to Expiration of Relief, Enforcement Discretion No Longer Applicable IR 05000275/19860111986-06-16016 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/86-11 & 50-323/86-12 ML20206G1171986-06-16016 June 1986 Forwards Safety Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted.Unresolved Item Identified Re Determination of Sys Operability During Corrective Maint Situation Will Be Examined in Future Insps IR 05000275/19860091986-06-0505 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-275/86-09 ML20198R5831986-06-0404 June 1986 Ack Receipt of 860602 Revised Scenario Manual for 860610 Emergency Preparedness Exercise.Scenario Package Adequate IR 05000275/19860021986-06-0303 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/86-02 & 50-323/86-02 1990-06-13
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20235W2621989-03-0101 March 1989 Final Response to FOIA Request for Transcripts Re Facility. Forwards App H Documents.App H Documents Also Available in Pdr.App I Documents Partially Withheld Per Sunshine Act ML20205R1641988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) IA-88-102, Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5)1988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155F8691988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR IA-88-455, Final Response to FOIA Request for Documents.App a Documents Available in PDR1988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20153H6121988-08-18018 August 1988 Final Response to FOIA Request.Forwards App E Documents.Apps D & E Documents Available in Pdr.Charges for Search, Duplication & Postage Listed ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20153G9331988-08-15015 August 1988 Partial Response to FOIA Request for Documents.Forwards App C Document.Documents Available in PDR ML20153H1821988-08-12012 August 1988 Responds to 880505 Appeal of Denial of Documents & Portions of Documents Identified on Encl Apps E & F in 880425 Response to FOIA 87-444.Documents or Portions of Documents Continue to Be Withheld (Ref FOIA Exemption 5) ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status 1999-09-13
[Table view] |
Text
{{#Wiki_filter:sg
~
y -
p . '
./ ,
m ljf n , . .
;.; p ' *,
, 23 3.[' a bG22Ng 3 -, ;; ,
'l[ ;JSouthern California' Edison Company X
' ~
; 1P. 0.~ Box 8001 ~
~ . ~2244iWalnut Grove Avenue .
, Rosemead, California 91770
- n. "
4' iAttention:'LMr.~ D. E. Nunn3 Manager . . .
;p -
, Nuclear Engineering and Construction -
J
Dear Mr Nunn:
On a recent visit to Diablo Canyon, I became aware of'certain innovative initiatives.taken by PG&E in the area of System Engineering'and Design:
Engineering interface. Attachnat 1 is a summary of these initiatives.
Ons particularly useful initiative 'is the quarterly system walkdown performed '
by the Design.-System Engineer and he Site System Engineer. With the permission of.PG&E, .I have taken tl ? liberty of providing you with an example of a report of one quarterly systen, walkdown. As you can.see, this report; substantially demonstrates the depth, scope and usefulness.~of the walkdown-as a toollfor assessing system status, problems and-trends. Such a report is provided for your examination as an example of what innovation can accomplish.
I look forward to discussing similar innovations that you may be taking and your. views of:these. techniques to improve engineering knowledge and
' involvement in plant' activities and status.
Sincerely, Dennis F. Kirsch, Chief Reactor Safety Branch Attachments:
As: Stated L.
cc w/ attachments:
C. Caldwell, SRI P. Johnson, Section Chief-cc w/o attachments:
R..Zimmerman, RV
.A..Chaffee, RV J. B. Martin, RV z RV/j k'
., REQUEST YJ 0 R' KIRSCiic/[ I
' 8/ ~ /89 4 8908290167 890822 -
PDR ADOCK 05000275 _ C ,; c P PDC e- <
l~ - -
, ATTACHNENT 1 l-l DIABLO CANYON
_ SYSTEM ENGINEERING / DESIGN ENGINEERING INITIATIVES
. Monthly walkdown of system of responsibility, using checklist, by system engineer.
j' . Quarterly walkdown of system by team consisting of Site System Engineer and Design System Engineer. Reports receive wide management distribution and review.
. Each system engineer developed a checklist of attributes to be examined during monthly and quarterly walkdowns.
. Walkdown checklists reviewed and commented on by Design System Engineer.
. Each system engineer developed a program to trend important parameters of his system to identify potential problems before they are manifest as a larger. problem.
. Trending program reviewed and commented or by Design System Engineer to achieve consensus on the attributes important to be trended.
. Alert and action levels in trended information are being established.
. Four to six week rotation program between the Site i/ stem Engineer and the Design System Engineer.
. Improved involvement of design engineering in monitoring plant activities and improved communication / relationship with plant system engineers by:
.. Quarterly walkdowns
.. Review ana consensus on walkdown checklists and trending program
.. Engineer rotation program
. Frequent senior management walkdowns of plant areas are conducted in the company of system engineers with responsibilities in those areas.
. System Engineer Training Progran includes:
.. Root cause training
.. Design basis training
.. Five month classroom technital staff training program
ATTACHMENT 2 o7 DIABLO CANYON POWER PLANT QUARTERLY SYSTEM STATUS REPORT 2ND Quarter 1989 SYSTEM 65 120V INSikUMENT AC SYSTEM
~
SYSTEM 66 120V SECbdITY UPS SYSTEM SYSTEM 67 125/250VDC SYSTEM 41 I
R. ORTEGA (1A / 6/30/89 System 65/66/67 Engirker Date 4 n
f.
K. RICHES / / 6/30/89 System 65 Desigh Engineer Date D. STREEBLE ,
/ 6/30/89 System 66 Design Engineer Date
__ . _ , _ _,, ,, , S. CHEN _
b" / 6/30/89 3 *(@E l,L4 Cr.L. YD~ l Y::)p, System / 67 Design Engineer Date
_ m - Framrnruw a-
W ," [.0 , ,
bi-
...a ,-
(; ' *
, 'f ..
i
-4' Page 2-o
.2ND QUARTERLY SYSTEM STATUS REPORT - 1989 h ,
o i
3 IP
(:
[..o I.- acutive Summary II. . System St'atus and Walkdowns A. Unit One and. Common B.. Unit Two.
- III. ;.
- System Problems IV.,' System Trends V. Attachments.
A. Outstanding AR's B. (ttstanding DCN's C. .0itstanding NCR's, QE's
, v D. 0:.'; standing 0ER's, IEB's,'IEN's E. Jumper Status
- j. +
2QTR89.RPT.
r&R _ - _ _ __ _ _ __
4 Page 3 2ND QUARTERLY SYSTEM STATUS REPORT - 19E9 I. Executive Sumary ,
A. System 65 - 120V Instrument AC System System has been walkdown with design system engineer and problem areas / proposed enhancements have been addressed in
- Action Requests. There are currently no operability
' problems except1 for recurrin pilot lights (AT EWR A0140994)gThis failures workon power was available identified as outage work but was canceled for 1R3 outage. This EWR request 4 items that require a DCN. Most of the items can only are outage related work. However, this light replacement has been performed during normal operation in the past. A DCN to perform this one item should be pursued independently of the rest so the QE against this item can be closed.
The recent SSFAR Electrical S.ystems Audit identified numerous electrical and ventilation components with loose or missing fasteners. These items have been given top ,
m3nagement priority and QE's were written.
An FSAR review was performed to identify any operational, testing, or maintenance commitments. Results of this review
)
are in Attachment V.S. '
The SSFAR Electrical Systems Audit was conducted on the 125VDC, vital 120V Instrument AC, vital 480VAC, vital 4KV i and diesel generator systems, during March and April. A '
vertical slice audit encompassing the areas of design, operations, maintenance, testing, training, quality verification, material condition, and plant configuration was performed. The SSFAR concerns involved updating of design bases, procedure refinements, and enhancement of operational readiness of the vital electrical ventilation systems. Specific DCPP concerns identified were in the areas of abnormal operating and annunciator response procedt.res, as-built conditions differing from as-designed, component labeling, and testing practices deviating from approved procedures. Aside from these concerns, the audit team concluded that the electrical systems audited met their intended functional and performance requirements. DCPP strengths were in the areas of electrical maintenance, surveillance testing, operator training, records management, and housekeeping. A total of sixty four QE's and 17 Ar's were issued to address outstanding issues. 7 QE's and 1 AR were written on this system and are part of Attachment V.3.
A majority of these QE's stem from untimely response to the SSFAR questions. Lessons learned from this audit are being 2QTR89.RPT
e , s e J
Page 4 1
2ND QUARTERLY SYSTEM STATUS REPORT - 1989 considered in the upcoming SSFAR Audit on the Auxiliary Feedwater System scheduled for July, i
The following NCR's were closed this quarter:
NCR DC2-88-EM-EM-136 (U2 PY22 voltage transient)
)
NCR DC1-88-EM-N011 (ferroresonant transformer failure in NIS Inverter IY-13).
There are no new NCR'S generated against this system.
There are no DCN's on this system.
B. System 66 - 120V Security UPS System The Security System Expansion Projects have exceeded the Emergency Power System's capacity. The security diesel generator overloads under transient starting conditions.
Temporary reconfiguration of the security electrical system alignment to reduce the generator's load has been implemented to prevent the overload conditions. Security compensatory measures have also been implemented so our regulatory commitments are met until a larger replacement is procured and installed.
The new forecast dates for this DCN are as follows. DCP REV A meeting is schedule for July 6 with Rev. 0 issue on around 7/14. The installation of the temporary diescl generator rental unit is scheduled to be performed before the Unit 1 Refueling Outage. The permanent installation is scheduled to start before the Unit 2 refueling outage. Vendor manuals for both the temporary and permanent diesel generator units were requested of NECS so the STP can be appropriately revised.
The security UPS preventative maintenance procedures are being issued as a result of QE 5530. This will include quarterly cleaning of air filters (filters to be installed),
tuning of the inverter on an annual basis, and filter capacitor replacement on a six year frequency.
An EWR has been written requesting to jumper out the UPS low air flow alarm. This is a non-latching alarm that flickers frequently due to the unreliability of the flow switches.
The alarm in the control room is a recurring nuisance alarm.
This same type of change has been performed on the P250 inverters where the flow switch ala n was de kted and temperature sensors were used instead. The security UPS is already equipped with high temperature protection to shutdown the UPS inverter and does not require this -
modification.
2QTR89.RPT
. a, e
Page 5 2ND QUARTERLY SYSTEM STATUS REPORT - 1989 There is only one DCN to replace the Security UPS bypass input breaker. This fs an old DCN that has been delayed due to Security power availability constraints. Work is no.'
scheduled for early July.
C. 125VDC AND 250VDC System There are 60 operability problems with the vital 125VDC System. One hardware problem, that does not affect OPERABILITY, exists in the U2 battery chargers. BTC21 &
BTC22 need to have their KIRK key interlocks replaced. This work was started this last quarter but has come to a halt after the wrong size locks were procured. Other work that has been delayed because of material pre-fabrication problems is DCP E-38560. This DCN strengthens the 125VDC distribution panel center breaker support. Both Mechanical and Electrical Lead Planners are aware of this delay.
The recent SSFAR Electrical Systems Audit identified numerous electrical and ventilation components with loose or mis:ing fasteners. These items have been given top
' man gement priority and QE's were written. 18 QE's pernaining to this system were written and 9 AR's with recoi;;;;endations came out of this audit. These are included in Attachment V.3.
There is one outstanding DCN to reinforce the 125VDC Switchgear Panels center breaker support which is in progress.
The non vital 250VDC Unit 2 battery bank was replaced during the Unit 2 first refueling outage. Unit 1 battery has reached the end of its service life. This year marks it's 20th year of service. Within the last two years there have been 7 cells that have been replaced and it has gone on alert status three times because of low cell voltages or low specific gravities. Current surveillance / maintenance
' tests show that the battery will not hold a charge to bring up the battery's parameters to its nominal range. An EWR was written to replace the battery bank. This work, t
Fa.ever, was canceled for the upcoming 1R3 outage. An EWR was written to perform a seismic test on battery cells from l
this bank in order to qualify our vital station batteries.
Our current seismic qualification for our vital station batteries is for 13 years. This was based on the shake test
! performed on the old vital batteries when they were replaced in 1983. The old vital batteries were 13 years old when they were shake tested. We are into the 7th year of the 13
! year qualificc tion. It is imperative that this testing be 2QTR89.RPT
.~ .
Page 6 2ND QUARTERLY SYSTEM STATUS REPORT - 1989 performed this year as this is the end of service life for the battery (20 years). The battery will degrade further with time.
The following NCR's were closed this quarter:
NCR DC2-TN-88-N028 (Missing Battery Rack Hardware on Bat 22 & 23)
- DC2-EM-88-N130 (U2 BATT CHGRS undersized lugs).
The only NCR open is DC2-TN-89-N002 (battery electrolyte temperature falling below the Tech. Spec value). An EWR was written to provide battery room low temperature alarm. This is the only corrective action to prevent recurrence left in order to close the NCR. No DCN's have been issued yet -this is not outage related work. NECS response is required.
No new NCR's were written this quarter.
NRC iE Bulletin 88-86 and OER 3087 discusses how HELB could cause multiple faults to ground. This issue is applicable to DCPP (see system problems for more info). This is {
currently being reviewed by NECS.
A FSAR review was performed to identify any operational, testing, or maintenance commitments. Results of this review are in Attachment V.S.
II. System Status and Walkdowns A. Unit One and Common All three systems were walkdowned and the following items were noted and documented on ARs.
System 65 - Instrument AC System System Status - OPERABLE Walkdown Findings:
There is a difference in the short circuit rating of the new PYllA and PY13A. Unit one short circuit rating is lower' than Unit 2 (10,000 amps /240 volts vice 14,000 amps /480 volts). An EWR was written to determine if this is a design concern. NECS response is pending.
i 20TR89.RPT L-__-____-____. _
l
e Page 7 i
2ND QUARTERLY SYSTEM STATUS REPORT - 1989 Concern over the classification of the NIS Inverter cooling fans air filters has halted the caarterly PM for filter replacement. NECS has requested that a FCT be submitted to show the filter mounting brackets and filter on the inverter i structural detail drawing (initial DCN that installed the cooling fans did not show the filters or the filter mounting bracket). Drawing has been FCT'ed. Response from NECS .
regarding the safety classification of filter is pending. I System.66 - Security UPS System (Common)
System Status - OPERATIONAL (See executive summary)
Walkdown Findings:
There are no new findings this quarter.
System 67 - 125 & 250VDC System System Status - OPERABLE i Walkdown Findings:
There was a discrepancy noted in the Unit One Single Line Diagram. The drawing needs to reflect that the P-2000 Inverter is no longer fed from the vital DC Panel S013 breaker 44. It is now fed the Unit I non vital panel PD18 breaker 13. Drawing 437518 was FCT'ed to reflect this as built condition - this item is closed.
There are no new findings this quarter. '
B. Unit Two Systems 65and67(System 66iscommon)werewalkdownedand the following items were noted and documented on AR's:
System 65 - Instrument AC System System Status - OPERABLE Walkdown Findings:
There are no new findings this quarter.
2QTR89.RPT
Page 8 2ND QUARTERLY SYSTEM STATUS REPORT - 1989 System 67 - 125 & 250VDC System System Status - OPERABLE Walkdown Findings: i
~
There was a discrepancy noted in the Unit Two Single Line Diagram.
The drawing lists the P-2000 Inverter as being fed from vital DC panel SD23 breaker 44. It is fed from SD23 breaker 50. Unit 1 P2000 Inverter is fed from the non vital I batteries. This load on Unit 2 may be a problem since the FSAx loading table for battery 13(23) is the same for Unit 1
& 2.
However, if the loading table was made including the P2000 Inverter, then this is not a problem. Drawing 441220 was FCT*ed to ref1;ct the as built condition and an AR was generated to determine if this load was accounted for in the battery duty cycle (FSAR worst case loading table). This loading table is used in the battery service test that is conducted on the battery every refueling outage. NECS response is pending. >
III. System Problems The following is a list of EWR's written to address /
disposition some of the system problems.
A. System 65 - 120 Instrument AC System
- 1. An EWR has been written to determine if the vital 120V Instrument AC System reliability can be enhanced. Our NIS Inverters are not true uninterruptible power supplies. They do not h;ve a static switch with a redundant bypass source to transfer the load to the bypass source in the event of an inverter failure.
Inverter failures may lead to undesired reactor trips, l EST Actuation, or plant transient that may challenge our safety system setpoints. This is especially true at DCPP as maintenance / surveillance activities may require tripping a protection set bistables. Loss of an inverter .
on another protection set would most like result in one ;
of the above mentioned incidents. This was requested on plant design comment 82-05 back in 1982. Engineering did not consider this a significant enhancement due to the technological standards at that time. Technological advances since that time has prompted a re-evaluation.
This is also is being submitted to the trip reduction program.
BLI 959A/B has been issued to track this item.
2QTR89.RPT
s 1
Page 9 2ND QUARTERLY SYSTEM STATUS REPORT - 1989
- 2. An EWR has been written to determine if the vital backup ;
voltage regulator TR11/TR21 is undersized for the DRPI loads. The DRP1 loads currently powered from a 10KVA !
transformer / regulator (Unit 2). The backup transformer / ~
regulator is a 7.5 KVA unit. This was also a SSFAR concern. NECS response is pending. j
- 3. An EWR was written to determine if the sizing requirements for the input transformers to the SOLA regulators are adaquate. SOLA regulator electrical requirements require that the input transformer be rated 40% higher than the regulator. This affects both the vital and nonvital regulators in the 120V Instrument AC System. NECS response is pending.
- 4. An EWR was written requesting to-change out the power available lights in the NIS Inverters. There have been numerous failures resulting in light socket failures.
These are now a safety concern as some of these lights have exploded while trying to change them out. The most recent event resulted in tripping the DC input breaker to the inverter resulting in entering the Tech. Spec. Action Statement. Operations has issued a safety memo for the operators to take precautions (safety glasses, rubber gloves) when changing out this bulb. Maintenance Engineering reports that the light socket is rated for 120V service and is being used for 135V continuous service.. A resistor type / lower voltage bulb is being requested. (NOTE: The EWR requests four items, some of which are outage related work. However, this item is corrective action to prevent recurrence on the QE that is pending . The replacement of the lights is not outage related work. Some of these lights have been replaced during normal operation. It is recommended that a separate dcn be issued for this item so the QE can closed). NECS response is pending.
- 5. An EWR has been written requesting to change out the inverter AC undervoltage relay. The fixed relay setting does not provide adequate annunciation for this application. On one of the last inverter failures, the ferroresonant transformer shorted. The undervoltage
) alarm did not come in even though the inverter voltage 3
was around 60 volts. It is requested that this new relay be set to alarm at around 110-112 volts (nominal output voltage is 115-122) so Operations is informed of degrading conditions. This item is on the same EWR as item 4 & 6. NECS response is pending. -
2QTR89.RPT
Page 10
, I 2ND QUARTERLY SYSTEM STATUS REPORT - 1989
- 6. An EWR was written requesting to change the NIS Inverter i reflash annunciator reset features. Presently, they are '
-auto reset. This prevents any alarm coming in to seal j in. This is an important indicator to determine what -
alarms come in, in the event of inverter transient conditions. This is on the same EWR as items 4 & 5.
NECS response is pending. i
- 7. An EWR was written requesting to ground the return wire from the ferroresonant trar,sformers at the NIS Inverters.
Presently, all of the inverters grounds are tied together at BTH101 and grounded at the the backup transformer.
Maintenance on the backup transformer may inadvertently lift the ground return to all the inverters. NECS i
response is pending.
8.TheFSARwasreviewedforoperational, maintenance,and -
testing commitments. An AR was initiated to revise Elect. Maint. Procedure MP E-65.1A in order test the NIS Inverter Alarms in the control room. The present PM procedure calibrates the relay and alarm setpoints. It does not check the alarm typewriter or annunciator window to verify that the alarm comes in. The AR is assigned to the Elect. Maint. Engr. Dept.
- 9. The same procedure mentioned above also needs to include the calibration of the time delay contactors in MP E-65.1A. The recurring task library work order already includes this. Another AR is tracking this item.
- 8. Security UPS System
- 1. The present security power system is configured so that the security diesel generator does not overicad. Some emergency power system loads have been shifted to normal station power--Security Bldg./ Security Lab System). 1 Additionally, security will be taking compensatory measures (one quadrant of emergency quartz lighting has to be manually sequenced on in the event of a diesel generator start). These measures will be in effect until the new diesel generator is installed. The schedule presented in the executive summary states the new diesel generator may be instilled by the end of R33.
2QTR89.RPT L_____ __ __ _
Page 11 i
2ND QUARTERLY SYSTEM STATUS REPORT - 1989
- 2. An EWR was written requesting to jumper out the flow
. switch low air flow alarm. The inverter is already '
provided with high temperature protection. This is a control room nuisance alarm (See Executive Summary). NECS I response is pending, C. 125VDC & 250VDC System l 1
- 1. Unit I non vital battery bank needs to be replaced. !
(No change - see executive summary) !
- 2. A setpoint change to the DC Switchgear undervoltage relay setpoint from 125 to 131 volts was considered. However, i the recent SSFAR audit identified that the actual setpoint of this relay (the dropout value) is not adjustable. The present alarm setpoint is in the order of 80-90 volts. The SSFAR audit team initiated an AR to re-evaluate this setpoint. NECS Response is pending.
- 3. An EWR was written requesting to also change the battery charger undervoltage and overvoltage relay setpoints.
The current undervoltage setpoint for the battery charger is 120 volts. This should be set at 131 volts in order for this alarm to come in just before we reach the Tech.
Spec value. At its present setting, even if the battery charger output were to go to zero volts, this relay would !
not pick up as the battery voltage is above 120 volts with the charger removed. The current setting for the overvoltage relay is 143 volts. This setting is set too high. If the battery charger voltage started to drift upward or if the equalizing voltage is set to high, the NIS Inverter overvoltage relay would trip the inverter AC input breaker. This setting should be adjusted to 140 volts or 138 volts (the equalize charge voltage on the batteries). DCP E-43329/44329 have been initiated.
- 4. There is a current NRC IE Notice 88-86 which discusses the problems with operating with multiple grounds on the DC distribution system. Along with that is an operating
' experience OE 3087 which discusses the effects of a HELB which could cause multiple faults to ground. It is important to note that most grounds encountered at DCPP !
i are due to steam leaks or humid environment around DC 1 powered equipment or instrumentation. Troubleshooting i
efforts consist of disconnecting (deenergizing) pieces of equipment to isolate the ground, however, there are some pieces of equipment that cannot be deenergized. As a .
3 result, the next step is go out and visually inspect I 2QTR89.RPT l l
-.. s .,
7 .'
2ND QUARTERLY SYSTEM STATUS REPORT - 1989 pieces of equipment. The recent use of a new ground locater.that can be used on energized circuits has l reduced this effort. Resolution of the IE Notice is with j HECS -no EWR was written. NECS response is pending. ~
5.-Recent PM's on the vital battery chargers have revealed replacement part problems with the charger's electronic ,
control cards. EXIDE, the manufacturer, has been I contacted to resolve the following problems:
A) There are new revision number cards in the firing modules. There is a concern of compatibility in using them with the older revision cards.
B) A recent INPO DE informs of battery charger control problems caused by the gate and filter module. The new revision control cards were manufactured with a electrolytic capacitor with the' polarity reversed.
This is causing premature failure of these cards. This '
.is a problem on chargers manufactured prior to 1971 (our Unit 1 Chargers).
C) Three control cards (amplifier module, voltage control module and current control cards) have been superseded by new cards. The unit 2 battery chargers use the new cards, however the unit 1 battery charger cards have been superseded with these new cards. In reviewing the control schematics, it was noted that the Unit 1 and Unit 2 have different control schemes. This is also a compatibility concern.
None of these problems pose an immediate concern but may become an issue if these control cards are used with the Unit i vital battery chargers when replacement becomes necessary.
- 6. There is an old AR and an EWR requesting replacement of the non-vital I?5VDC & 250VDC undervoltage relays. The setpoints for these relays have been reported to drift.
An EWR has been requested for replacement. NECS response is pending.
- 7. The FSAR was reviewed for operational, maintenance, and testing commitments. AR's were initiated for the following changes to revise Electrical Maintenance Procedure to:
A) verify charger regulation and current limit setpoint.
- 8) verify battery charger and 125vdc System alarms i.. the control room (annunciator typewriter and annunciator window).
C) include other vendor manum ommended testing. '
This AR is assigned to Elect. .t. Engr. Dept.
~
2QTR89.RPT w____-_____-- _ - - ---- - - - - - - - - _ _ _ _
g
(, .
l* -
V ..
4 Page 13 1
2ND QUARTERLY SYSTEM STATUS REPORT - 1989
- 8. The SSFAR Audit has issued a QE to evaluate whether :
temperature correction on the battery service test STP '
M-12C is required. This itas been addressed in other NRC SSFI Audits. The STP testing method is in compliance I
~
with the IEEE450 industry standard. This standard does not address temperature correction factors or formulas .
for service response is tests. An AR also addresses t its issue. NECS pending.
i 3
i IV. System Trends A. 120V Instrument AC System With the exception of wsikdowns performed by Operations, nave are no trendable parameters oc this system. The nominal operating parameters of the NIS Inverters are checked the daily electrical round sheet. Any value out of
.this range is documented on Action Requests.
No discrepancies were noted this quarter.
B. 120V Security UPS System STP SP-312 (security system emergency power source and load transferring test) obtains data of diesel generator voltages
/ current and also UPS Inverter Data. Other than keeping track of additional loading on the diesel generator or verifying nominal operating parameter:, there are no other trendable parameters (security battery parameters are !
trended - see next section).
No new discrepancies were noted this quarter.
C. 125 & 250VDC System The vital station batteries and the security battery are trended. Weekly battery STP trend individual pilot cell parameters to detect degrading conditions. A computer program is used to trend level, specific gravity, cell voltages, and the whole battery bank voltage. Another program is being developed to trend the whole battery bank.
The quarterly STP on battery 13 has revealed that the specific gravity of cell 36 is trending low. In researching the records it was noted that this cell was reported low in the past and an individual equalize charge had been performed. Also, the initial charge records noted that the specific gravity of this cell was not properly balanced. A !
i temporary procedure has been developed to replenish ac'id to-increase the specific gravity.
1 2QTR89.RPT
7_ ..
- JTYsi . .
y s l- .' '
c, ,
Page 14
-L
-{
2ND QUARTERLY SYSTEM STATUS REPORT - 1989 L
The Unit I non vital 250VDC battery bank. system needs to be.
replaced. Trending of these parameters shows.that the .
' battery will no longer hold a charge as evidence by the I quarterly inspection results. Numerous' cell replacements ._
have occurreu within the last-two years. See executive summary comments.
,i -
f 1
I 1
)
- These items were reported on First Quarterly Peport - 1989. I 2QTR89.RPT}}