ML20151Z575

From kanterella
Jump to navigation Jump to search
Ack Receipt of Ltr Re Plant.Commission Decision Authorizing Low Power Testing & Fuel Loading First Step in Review. Earthquake-related Issues Will Be Addressed in Detail by Commission
ML20151Z575
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/22/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Holtzman R
AFFILIATION NOT ASSIGNED
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805050312
Download: ML20151Z575 (1)


Text

, . . .

p 3

  1. 'o UNITED STATES

, J g o NUCLEAR REGULATORY COMMISSION

$ WASHINGTON. D.C. 20555

\7..ax/.= September 22, 1981 0FFICE OF THE COMMISSIONER Ms. Ruth Holtzman '

1204 lith Place Hermosa Beach, California 90254

Dear Ms. Holtzman:

Thank you very much.for your letter regarding Diablo Canyon. The recent Comission decision authorizing low-power testing and fuel loading is only the first step in Comission review of this plant. Specifically, the earthquake-related issues that distinguish Diablo Canyon from*most other nuclear units have not yet been addressed in detail by the Commission.

They will be reviewed before operation above five percent power is authorized.

,While it may have some symbolic importance, a decision to authorize low-power testing poses very little danger to the public. The power level is so low that the operators have more than amole time to react to any problems in the plant, and the amount of radioactivity existing in the core does not begin to build up until the plant has operated for quite a while.

1 Sincerely,

/]/

Peter A. Bradford Comissioner i

t e

89050'50312 080418 PDR FOIA PDR

/

HAMLIN87-444 l

__