Ack Receipt of Ltr Re Plant.Commission Decision Authorizing Low Power Testing & Fuel Loading First Step in Review. Earthquake-related Issues Will Be Addressed in Detail by Commission
ML20153B831
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/07/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Wahl S
AFFILIATION NOT ASSIGNED
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805060091
Download: ML20153B831 (1)


Text

_

_ - _ _ _.f..'_____.._..___._.

s\ O usirsosrirss O

, [J

h NUCLEAR REGULATORY COMMISSION WASHINGTON, O A 20684

/ October 7,1981 099W.E 09 THE comacssionen t

! Mr. Steve Wahl i 604 W.10th Street i Corona, CA 91720 i (

Dear Mr. Wahl:

Thank you very much for your letter regarding Diablo Canyon. The recent Comission decision authorir.ing low-power testing and fuel loading is only the first step in Comission review of this plant. Specifically.

the earthquake-related issues that distinguish Diablo Canyon from most l

other nuclear units have not yet been addressed in detail by the Comission.

They will be reviewed before operation above five percent power is

~

j authorized.

I While it may have some smbolic importance, a it:i: ion to authorize low-power testing poses very little danger to the poulic. The power level is so low that the operators have more than ample time to react to ,

any problems in the plant, and the amount of radioactivity existing in l the core does not begin to build up until the plant has operated for '

quite a while.

Sincerely. .

V /5_ h peter A. Brad rd Comissioner i