Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon
ML20199H669
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/02/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9802050092
Download: ML20199H669 (6)


Text

(-

/ M%r UNITE D STATES

.. ., .% NUCLEAR REGULATORY COMMISSION

!^ REGION IV 4 611 RY AN PLAZA DRIVE, SulTE 400
  • 't,N*****

"5[8

. . ARLINGTON, TE XAS 76011 8064 February 2,1998 L Gregory M. Rueger, Vice President and General Manager Pacific Gas and Electric Company Nuclear Power Generation, N98 P.O. Box 770000 San Francisco, California 94177

SUBJECT:

DIABLO CANYON PHYSICAL SECURITY PLAN, REVISION 18, CHANGE 11

Dear Mr. Rueger:

This letter acknowledges receipt of your letter dated November 19,1997, which transmitted Revision 18, Change 11, to the Diablo Canyon Physical Security Plan, submitted under the provisions of 10 CFR 50.54(p). '

Based on your de'ermination that the changes do not decrease the effectiveness of your site security plan, and after limited review of the changes, no NRC approval is required for some of the changes in accordance with 10 CFR 50.54(p). . implementation of these changes will be subject to inspection to confirm that the changes have not decreased the effectiveness of your security plan. i On January 23,1998, during a' telephone conversation between Messrs. R. Todaro and L. Fisher of your staff and D. Schaefer of this office, Mr. Schaefer noted that a change described in your " Description of Changes to the Physical Security Plan" had not been included in your security plan incorporating the identified changes. Additianally, the role of your video capture audible alarm syctem needs to be addressed in the security plan. Mr. Todaro stated that these items, described in the enclosure to this letter, would be included in the next 10 CFR 50.54(p) change to the security plan.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure, if you have any questions concerning this matter, please contact Mr. Dennis Schaefer of my staff at (817) 860-8132.

Sincerely, [

Blaine Murray, Chief,

(

Plant Support Branch Division of Reactor Safety Docket Nos.: 50-275;50-323 License Nos.: DPR-80; DPR-82 e"

9802050092 990202

'

  • i. a hll' f'

PDR ADOCK 05000275 F PDR

Pacific Gas and Electric Company '

cc:

Dr. Richard Ferguson Energy Chair

( Sierra Club California 1100 lith Screet, Suite 311 3 "

E Sacramento, Califomia 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Bcx 164 Pismo Beach, Califomia 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Govemment Center San Luis Obispo, Califomia 93408 0 Mr. Truman Burns \Mr. Robert Kinosian Califomia Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, Califomia 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon independent Safety Committee 857 Cass Street, Suite D Monterey, Califomia 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, Califomia 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 l

l _.. _

Pacific Gas and Electric Compary Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112

_g San Luis Obispo, Califomia 93406

-i

_l

_L e

a

-- m - - - - . . . .

5 bec to DMB (IE53) bec distrib. by RIV:

, Region Administrator g

Resident inspector DRP Director

[{ -

Branch Chief (DRP/E, WCFO) g Sr. Projed Inspector (DRP/E)

-B Branch Chief DRS/PSB MIS System RIV Docket File Elaine Koup (NRR/DRPM/SGR, MS: 011E-22)

DRS/PSB Security File (Hodges)

RITS Coordinator (Elko)

DRS\PSB Al File (97-S-0029)

O 1

R DOCUMENT NAME: G:\DRSLTRS\Al70029S.DWS TAC #X00470 To receive copy of document, hdicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB _

E C:PSB a j l DWSchaefer:A BMMurray \)

g /98 01/lQ/)/98 ,

T' OFFICIAL RECORD COPY a

p

~~'

mm . _ _ _ _ _ _ _ _ _ . _

e '.

l -:

Acc to DM i bec distrib. by RIV:

Region Administrator Resident inspecto" t DRP Director isranch Chief (CAP /E, WCFO)

Sr, Project inspector (DRP/E)

Branch Chief DRS/PSB MIS System RIV Docket File Elaine Koup (NRR/DRPM/SGB, MS: 011E-22)

DRS/PSB Security File (Hodges)

RITS Coordinator (Elko)

DRS\PSB Al File (97-S-0029)

U DOCUMENT NAME: G:\DRSLTRS\Al70029S.DWS TAC #X00470 To receive r n, of document, ir.dicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

~

JHIV:PSG E C:PSB m l l DWSchaefer:A BMMurray \) j 01/ X, /98 01/td()/98 '

C OFFICIAL RECORD COPY

ENCLOSURE Dockets 50-275: 50-323-PAGE SECTION REMARKS 3-4 3.1.3.3 The " Description of Changes to the Physical Security Plan," stated as follows: "If CAS and SAS cannot readily determine the cause of an alarm through the use of the video capture system, a security officer would be dispatched to investigate the cause of the alarm."

This change needs to be i..cluded in the revised security plan.

3-4 3.1.3.3 The role of the video caoture audible alarm, and periodic testing of this alarm feature, needs to be descr: bed in the security plan.