DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld

From kanterella
Jump to navigation Jump to search
Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld
ML20100P322
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/28/1996
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-96-054, DCL-96-54, NUDOCS 9603110136
Download: ML20100P322 (2)


Text

y .

ai-w- vm

.v 7 3 ;.t 7 ,

.1 - ;, s n , c. , ,. . . . - ..

Pacific Gas and Electric Company " h e 5.: e P :9 NW 1 U- i 40: , M F mer

~:n Fr :,::c. : 14105 %m ce Prmcem r

" n.me **. - hD9f 3! f/?n336 i

w m.er 6ma:f-

}'Q :q.

-< gj,1((

10hT3*. 7 ..IbdIII

  • ? $ Y. .: :::

I p t. ', - M -n ,

February 29,1996 PG&E Letter No. DCL-96-054 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Chance 7 to Revision 18 of the Physical Security Plan and Chance 1 to Revision 3 of the Safeauards Continaency Plan

Dear Commissioners and Staff:

Pursuant to 10 CFR 73.55(c)(9)(ii), PG&E is submitting Change 7 to Revision 18 of the Physical Security Plan (PSP) and Change 1 to Revision 3 of the Safeguards Contingency Plan (SCP) in accordance with 10 CFR 50.54(p). The changes address implementation and installation of a vehicle barrier system for Diablo Canyon Power Plant (DCPP).

PG&E submitted a summary description of the proposed vehicle control measures per 10 CFR 73.55(c)(9)(i) (Re: DCL-95-046, dated February 28, 1995).

Enclosure 1 proposes revisions to the PSP that clarify PG&E's commitment to meet 10 CFR 73.55(c)(8). A new Appendix "l" has been added to provide details of the vehicle barrier system.

Enclosure 2 includes the pages of the PSP incorporating the changes identified in Enclosure 1. Changes are indicated by side bars in the left margin.

Enclosure 3 identifies and describes changes to the SCP on the same topic.

SECURITY SAFEGUARDS INFORMATION When Separated From Enclosures Handle This Document As Decontrolled PDR 070064 9603110136 960228 ADOCK 05000275 /

f ig F PDR

, l i

  • 1 DCL-96-054 Domment Control Desk f wruary 29,1996 '

Page 2 i

Enclosure 4 includes the pages of the PSP incorporating the changes identified in Enclosure 3. Changes are indicated by side bars in the right margin. l Enclosure 5 is a sketch of the type and placement of vehicle control measures at DCPP, Should you require further information or clarification, please contact Ron )

Todaro, Security Director, at (805) 545-4309.

Sincerely, f ,

iw.~n Greg6ry M. Rueger cc: L. J. Callan (2 copies)

Ronald G. Todaro Michael D. Tschiltz (w/o enclosures)

CCC/RMS Document Control Desk (3 copies)

Enclosures 5

SECURITY SAFEGUARDS INFORMATION When Separated From Enclosures Handle This Document As Decontrolled