ML20058B533
| ML20058B533 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/22/1990 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20058B536 | List: |
| References | |
| NUDOCS 9010300257 | |
| Download: ML20058B533 (3) | |
See also: IR 05000275/1990017
Text
. . .
.
.o
"'*g~
SAFE @MASssNFORMATION
NUCLEAR REOULATORY COMMISSION
f~
n
neoe0N V
l
s
,o
WALN C E CL
A
Docket Nos. 50-275 and 50-323
W i 2 1990
Pacific Gas and Electric Company
77 Beale Street, Room 1451
San Francisco, California 94106
Attention: Mr. J. D. Shiffer, Senior Vice President and General Manager
Nuclear Power Generation Business Unit
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-275/90 17 AND 50-323/90-17
This letter refers to an unannounced routine Safeguards Inspection conducted by
Mr. D. Schaefer of this office on September 24-28, 1990. The inspection
included a review of your activities at Diablo Canyon Power Plant (DCPP), Units
1 and 2.
On September 28 1990, at the conclusion of the site visit the
findings were discussed wIth those members of your staff identified In the
enclosed Inspection Report.
Further, this letter refers to a telephone
discussion between Messrs. L. Fisher, DCPP, and D. Schaefer of this office on
October 8, 1990.
Areas examined during this inspection included activities related to physical
protection as described in the enclosed inspection report. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with facility and contract personnel, and
observations of activities in progress.
Within the scope of the inspection, two licensee-identified apparent violations
were reviewed.
These apparent violations are not being cited because the
criteria specified in NRC's Enforcement Policy, 10 CFR Part 2 Appendix C,
Section V.G.I., were satisfied.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, code of Federal Regulations, documentation of the findings of your
safeguards and security procedures are exempt from public disclosure;
therefore, the enclosed report will not be placed in the NRC Public Document
Room, and will receive limited distrTFution.
We have determined that the enclosure to this letter contains Safeguards
Infomation and must be protected against unauthorized disclosure in accordance
with the provisions of 10 CFR 73.21.
r::mnty.nymn
-
wmuam um.mm.
UPW .C.PA; P "~a~.5 s~ .
SAFEGUARDS iNFORMATION
n= n maE
-
.
/
9010300257 901022
ADOCK 05000275
_/
f'
F pr
gg,
I9
J
.
i
'
,
-2-
ggy j g jg3
Should you have any questions concerning this letter, we w 1.' be glad to
'
discuss them with you.
Sincerely,
,
7_ M
Robert J. Pate Chief
Nuclear Materials and
'
Fuel Fabrication Branch
Enclosure:
NRC Inspection Report Nos. 50-275/90-17
50-323/90-17 (IE-V-932)
cc w/ enclosure:
J. A. Sexton, PG&E
J. D. Townsend, Vice President, Diablo Canyon Operations & Plant Manager, PG&E
R. F. Locke, Esq.. Attorney, PG&E
L. Shaffer, Director, Corporate Security PG&E
D.Taggert, Director,QualitySupport,DlabloCanyon
R. Grebel, Supervisor, Regulatory Compliance, Diablo Canyon
T. Todaro, Security Manager, Diablo Canyon
'
R. Dube, NRR
L. Bush, NRR
,
cc w/o enclosure:
R. Weinberg, News Service (Diablo Canyon)
State'of CA
,
,
.
i
.
~
-, -
i'
.
'
' 907 8 2 19M
bec w/ enclosure:
Docket File
,
J. Martin
'
B. Faulkenberry
bec w/o enclosure:
i
Resident Inspector
J
ProjectInspector
j
G. Cook
M. Smith
'
LFMB
REGION V/ dot
D.Schaefer
P.Morrill
ate
10/14/90,
10/It,/90
10/12/90
,
UL51 COPY J RtQUEST CRF4 J REQULSI COPY ]
YES / NO
] YES //NO ) ] YES / NO
]
'
-
V
,8END TO PDR ]
YES/ / NO
]
Cover leYer s~/s~~,-ui7 pp k refs,~f
ou
,
1
.
-
.
,_
- . . , _ . ,
.