ML20058B533

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited
ML20058B533
Person / Time
Site: Diablo Canyon  
Issue date: 10/22/1990
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20058B536 List:
References
NUDOCS 9010300257
Download: ML20058B533 (3)


See also: IR 05000275/1990017

Text

. . .

.

.o

"'*g~

SAFE @MASssNFORMATION

NUCLEAR REOULATORY COMMISSION

f~

n

neoe0N V

l

s

,o

WALN C E CL

A

Docket Nos. 50-275 and 50-323

W i 2 1990

Pacific Gas and Electric Company

77 Beale Street, Room 1451

San Francisco, California 94106

Attention: Mr. J. D. Shiffer, Senior Vice President and General Manager

Nuclear Power Generation Business Unit

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-275/90 17 AND 50-323/90-17

This letter refers to an unannounced routine Safeguards Inspection conducted by

Mr. D. Schaefer of this office on September 24-28, 1990. The inspection

included a review of your activities at Diablo Canyon Power Plant (DCPP), Units

1 and 2.

On September 28 1990, at the conclusion of the site visit the

findings were discussed wIth those members of your staff identified In the

enclosed Inspection Report.

Further, this letter refers to a telephone

discussion between Messrs. L. Fisher, DCPP, and D. Schaefer of this office on

October 8, 1990.

Areas examined during this inspection included activities related to physical

protection as described in the enclosed inspection report. Within these areas,

the inspection consisted of selective examination of procedures and

representative records, interviews with facility and contract personnel, and

observations of activities in progress.

Within the scope of the inspection, two licensee-identified apparent violations

were reviewed.

These apparent violations are not being cited because the

criteria specified in NRC's Enforcement Policy, 10 CFR Part 2 Appendix C,

Section V.G.I., were satisfied.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, code of Federal Regulations, documentation of the findings of your

safeguards and security procedures are exempt from public disclosure;

therefore, the enclosed report will not be placed in the NRC Public Document

Room, and will receive limited distrTFution.

We have determined that the enclosure to this letter contains Safeguards

Infomation and must be protected against unauthorized disclosure in accordance

with the provisions of 10 CFR 73.21.

r::mnty.nymn

-

wmuam um.mm.

UPW .C.PA; P "~a~.5 s~ .

SAFEGUARDS iNFORMATION

n= n maE

-

.

/

9010300257 901022

PDR

ADOCK 05000275

_/

f'

F pr

gg,

I9

J

.

i

'

,

-2-

ggy j g jg3

Should you have any questions concerning this letter, we w 1.' be glad to

'

discuss them with you.

Sincerely,

,

7_ M

Robert J. Pate Chief

Nuclear Materials and

'

Fuel Fabrication Branch

Enclosure:

NRC Inspection Report Nos. 50-275/90-17

50-323/90-17 (IE-V-932)

cc w/ enclosure:

J. A. Sexton, PG&E

J. D. Townsend, Vice President, Diablo Canyon Operations & Plant Manager, PG&E

R. F. Locke, Esq.. Attorney, PG&E

L. Shaffer, Director, Corporate Security PG&E

D.Taggert, Director,QualitySupport,DlabloCanyon

R. Grebel, Supervisor, Regulatory Compliance, Diablo Canyon

T. Todaro, Security Manager, Diablo Canyon

'

R. Dube, NRR

L. Bush, NRR

,

cc w/o enclosure:

R. Weinberg, News Service (Diablo Canyon)

State'of CA

,

,

.

i

.

~

-, -

i'

.

'

' 907 8 2 19M

bec w/ enclosure:

Docket File

,

J. Martin

'

B. Faulkenberry

bec w/o enclosure:

i

Resident Inspector

J

ProjectInspector

j

G. Cook

M. Smith

'

LFMB

REGION V/ dot

D.Schaefer

P.Morrill

ate

10/14/90,

10/It,/90

10/12/90

,

UL51 COPY J RtQUEST CRF4 J REQULSI COPY ]

YES / NO

] YES //NO ) ] YES / NO

]

'

-

V

,8END TO PDR ]

YES/ / NO

]

Cover leYer s~/s~~,-ui7 pp k refs,~f

ou

,

1

.

-

.

,_

- . . , _ . ,

.