Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20055E2841990-05-30030 May 1990 Final Response to FOIA Request.App C Record Encl & Available in PDR ML20246D8951989-08-18018 August 1989 Forwards Safety Evaluation Re Dispute Between Case & Util on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20247Q4001989-07-27027 July 1989 Advises That Recipient 890713 Motion to Reopen Record Withdrawn,Per 890725 Request.W/Certificate of Svc.Served on 890729 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245D0521989-06-16016 June 1989 Informs of Understanding of Dispute Between Case & Texas Utilities Electric Co,Including Issues Involved in Dispute & Update on NRR Plans for Resolution.Summary of Understanding of Dispute Encl ML20244B1211989-06-0909 June 1989 Partial Response to FOIA Request for Documents.Forwards App E & F Documents.App E Documents Also Available in Pdr.App F Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7). App G Totally Withheld (Ref FOIA Eexemption 7) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20247G6141989-03-28028 March 1989 Advises of Plans to Resolve Case Dispute W/Util Re RCS Cold Hydrostatic Test for Plant Conducted & Recorded in 1982,per Case 890313 & 17 Ltrs.Public Meeting Will Be Held in Arlington,Tx to Assure That NRC Understands All Info ML20235G1771989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) IA-88-524, Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6)1989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) ML20206H0921988-11-17017 November 1988 Partial Response to FOIA Request for Documents.Forwards App F Documents.App F Documents Also Available in PDR ML20206H5971988-11-14014 November 1988 Responds to Appeal of Partial Denial of FOIA Request for App F Documents.Request Approved in Part & Denied in Part. Portions of Documents 1,3,5,23,25 & Attachments to Document 20 Withheld (Ref FOIA Exemption 5) ML20206H4941988-11-10010 November 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a ML20206E7741988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Being Placed in Pdr.App a Documents Also Available in Pdr.Documents Listed in App C Totally Withheld (Ref FOIA Exemption 5) ML20195G1951988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents & Records Available in Pdr.App D Documents Also Available in PDR ML20206C1801988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl IA-88-152, Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl1988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20205E9561988-10-0505 October 1988 Final Response to FOIA Request for Documents.Forwards App B Documents.Apps a & B Documents Also Available in PDR ML20151W5631988-08-16016 August 1988 Forwards Memo to Jg Partlow Re Mutually Agreed Upon Interpretation of Certain Provisions of Joint Stipulation in Proceeding.W/O Encl.Related Correspondence ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20195E8821988-06-15015 June 1988 Third Partial Response to FOIA Request for Documents.App C, E,F & G Documents Encl & Available in Pdr.App D Documents Available in Pdr.Portions of Records Subj to Request Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20155C3731988-05-25025 May 1988 Advises of Projected Schedule for Issuance of NRC Ssers Re Collective Significance & Evaluation Repts,Per . Next Rept on Cable Trays Should Be Issued on 880624 & Sser Re Environ Activities Anticipated on 880630 ML20155C3071988-05-24024 May 1988 Advises That NRC Counsel Will Not Be Executing Nondisclosure Statement,Per NRC Manual Chapter Governing Treatement of Protected Info by NRC Employees,Per Recipient ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20148J7801988-03-25025 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-27 & 50-446/87-20.App B Documents Encl.App a Documents Available in PDR ML20150C7341988-03-15015 March 1988 Final Response to FOIA Request for Documents.App I Documents Encl & Available in Pdr.App J Records Totally Withheld (Ref FOIA Exemption 5) ML20150C1241988-03-14014 March 1988 Final Response to FOIA Request for Documents.Forwards App F Documents.Apps E & F Documents Available in PDR ML20147E4681988-03-0202 March 1988 Partial Response to FOIA Request.App C Documents Encl & Available in Pdr.App D Documents Re Insp Repts 50-445/85-07 & 50-446/85-05,Ofc of Inspector & Auditor Rept 86-10 & ASME Code Hydrostatic Test Encl & Available in PDR ML20147D7651988-03-0101 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Forwards App B Document.App a & B Documents Available in PDR ML20196B2161988-02-0505 February 1988 Responds to Appeal of Denial of FOIA Request for Documents Listed on App C,Per Dh Grimsley .Encl Documents Listed on App Also in Pdr.Documents Partially Withheld (Ref FOIA Exemptions 5 & 7) ML20147B3821988-01-13013 January 1988 Final Response to FOIA Request.App H Documents Re Correction to Ofc of Inspector & Auditor Rept Encl & Being Made Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) IA-87-634, Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 8712101988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr Dtd 871210 ML20147A8261988-01-11011 January 1988 Final Response to Appeal of Denial of FOIA Request for Documents Re Plant.App a Documents Available in Pdr.No Further Action Being Taken on Appeal Ltr ML20237A5081987-12-10010 December 1987 Partial Response to FOIA Request.Forwards App G Documents. Documents Also Available in PDR ML20236X5841987-12-0808 December 1987 Final Response to 871106 Appeal of Dh Grimsley 871027 Denial of Documents for FOIA Request Re Keppler to Counsil on Facility.Listed Document Partially Released & Encl.Stated Documents Withheld (Ref FOIA Exemption 5) ML20236V6351987-12-0202 December 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Stello 871021 Memo Establishing Comanche Peak Rept Review Group & Notes of Stello Meeting W/Involved Individuals.Info Withheld (Ref FOIA Exemption 6) ML20236V7221987-12-0202 December 1987 Provides Details of How NRC Will Make Documents Available to Parties Once Sser Issued Re Project Status Rept.Procedure Should Obviate Necessity for Any Party to File for FOIA Request or Production of Documents.Related Correspondence ML20236S4271987-11-19019 November 1987 Further Response to Appeals of FOIA Request for Records Re Evaluation of issue-specific Action Plan Re Plant.Documents I.2.b & I.10 Addressed in Responses to FOIA 86-A-203 & 86-A-204 & Contained in Other Documents Available in PDR ML20236Q5511987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR IA-87-684, Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR1987-11-17017 November 1987 Final Response to FOIA Request for Records Re Summary of 870902-04 Audit Concerning Implementation of Piping Generic Technical Issue Resolutions.Forwards App B Documents.App B & C Documents Available in PDR DD-87-17, Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 8711171987-11-17017 November 1987 Advises That Commission Declined Review of Director'S Decision DD-87-17.Time Provided by NRC Regulations for Commission to Act Expired.Decision Became Final Agency Action on 871110.Served on 871117 ML20236P2581987-11-13013 November 1987 Advises of Tentatively Scheduled 871209 Public Meeting in Dallas,Tx to Discuss NRC Review of Corrective Actions Described in Util 870625,0820,28,0908 & 23 Ltrs.Comments Requested by 871201 for Inclusion in Agenda ML20236L7401987-11-0909 November 1987 Partial Response to FOIA Request for Documents Re Implementation of Piping Generic Technical Issue Resolution.Forwards Documents Listed in App A.App a Documents Available in PDR ML20236K0871987-11-0404 November 1987 Response to Appeal of Denial of FOIA Request for Documents Re Insp Rept 50-455/87-07 & 50-446/87-06.Documents Listed in Encl App Will Continue to Be Withheld (Ref FOIA Exemption 5) ML20245D0621987-11-0303 November 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Ofc of Investigations Investigation 4-84-050.Forwards Portions of Transmittal Memo Listed on App.Remaining Documents Continue to Be Withheld (Ref FOIA Exemptions 5) ML20236G6301987-10-30030 October 1987 Final Response to FOIA Request for Documents,Including V Stello 870414 Memo Re Comanche Peak Rept Review Group.Encl App B Documents Also in Pdr.App B & C Documents Partially & Completely Withheld (Ref FOIA Exemption 5) ML20236J9541987-10-29029 October 1987 Final Response to FOIA Request.App a Documents Re Mgt of Allegations Already Available in Pdr.App B Document Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20245C4291987-10-29029 October 1987 Partial Response to FOIA Request Re Plant.App a Records Available in Pdr.App B Records Encl & in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5).App D Documents Partially Withheld (Ref FOIA Eexemption 6) ML20236D8821987-10-27027 October 1987 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Documents Encl & Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) 1990-05-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
- % [k[h " h #83 b et&PCes94 TyPt i RESPONSE TD FREEDOM OF I "'' Lki **
/ INFORMATION ACT (FEIA) REQUEST NQy gjggg ooc m so.weta.s,ur w *.ee.
4/k/us f 0>' PART1 .-RECORDS AfLEASIO OR NOT LOCATtD (See cAecked bomel No agency recorde subpect to N segmet he, teen locsted.
No edcstnel egerry recarde shpect to te reemet how been located.
W recorde eApoct to the rogmet that ere identred b Ag$endts ers air *Wy eveAetdo for mkAcr' ecoction and copring in the NRC PdAc Document Room, 1717 H Street, N W., Weehogton, DC.
A0ency recorde evtinct to the request that ere identmed in Accords are being mwe eve &stne for ebec receetion and copying h to NRC Putac Document Roern,1717 H Street, N W., Washrgton, DC. In a feeder under the FotA nurrter eruf requester name.
TN norgreprietary wroon of the proposeNel that ,cu agreed to accept in a telephore conve seten weth a memter of my staff ' now s being rnede eve 4ebis for pub &c repecnon and cW et the NRC Pwtac Occument Rocen.1717 H Street N W., WesNngton, DC. in a fouer under ins FOLA rueber and requester nome.
Enclosed le bforweten on how tw may obtee access to and the charges for copy 4ng recorde pieced in te NRC Putac Docurrent Room,1717 H Street, N.W., WesNryce, DC.
Agency recorde ahvec1 to te rendet as ordosed Any ass catde a charge for ccc.ee of the recorde provsied eruf pervert procedures are noted in te cccvnents emeten.
Recorde avb,ect to the e bed toen referted to another Fedral eW' eel for resww and dwect response to you.
In ww of NRC's re pores to the request, no further octon a te taken on opcd loner detod PART ti.A-INFORMATION WITHHELD FROM PUBUC DISCLOSURE Corwn eforwetaan e the towested recorde e terg withheld from publ< decloswee purseemt to the FCIA esemptone descrted e and for the reasore stated in Part N. sec.
tore e,'C and D. Any redeesw portsors t of he doewts for de orW part of tre record a being we>eu e<e terg mwe eveaetde for putd.e irecoctea and c te NRC PWe Doevent Roorn.1717 H Street, N W., Weehegton, DC, e e fcdder under the FOIA rumter eruf rwar tw (h gg&' d<f ff f n/r -
l l
l l
l l
l l
l l
l l
8011100190 001100 PDR F01A CONDITB6-322 PDR A
s Tvet. Dea ct 15cs Als Ano esconos F L/ vi I
CIC FORM e44 m u C aen u
PREEDOM OF INFORMATCN ACT RESPONSE FOtA NUMBEMSP
" M -- OATE 8 M$
PART If 8- APPLICABLE FOtA EXEMPTIONS Records subject to the request that are descr'ad in the enclosed Appendices are being withheld in their entirety or in part under FOIA Esemptions and for the reasons set forth belos, pursuant to 5 itS.C. 562(b) and 10 CFR 9.54a) of NRC Regulations.
- 1. The withheld informaton es property class #ed pursuant to Enocutme Order 12356 ttXEMPitON Il
- 2. The withheld information relates solely to the infomal personnel rules and procedures of NRC. (EXEMPTION 2!
k The wthheld informason a specsficaay enempted from putAc deciosure by statute inocated. ' EXEMPT""J T Suton 141145 of the Atomic Energy Act which prohbts the declosure of Restncted Data or Formerty Restricted Data (42 U S C. 21612166L Secton 147 of the Atomic Energy Act which prohbts the desciosu*e of UnclassAed Safeguards information 142 U $ C. 21671.
- 4. The withheld informaton e a trade secret or commeroal or fcancial oformation that is beerg wthheld for the reasords) ind cated: (EXEMPTION 41 The information is cons.dered to be confidentW buseess (proprietaryl mformation.
.m.
The informat on is considered to be propretary information pursuant to 10 CFR 2 790td4tL W
I The informaton was submitted and rece.ved in contdence from a foreign source pu suant r to 10 CFR 2.790td1I21.
- 6. The withheld information consists of interagency or intraegency records that are not avaAable thrmgh decovery dureg litigatson. Declosure of predeceional informaton would tend to enhbt the open and frar* enchange of ideas essential to the deleerstrwe process. Where records s's withbeid in their entsrety, the facts are meitncab8y intertwned wth the credoc s onalinformaton. There also are no esatonabhr segregsble factual portons because the release of the facts would permst an indwoci mq sty mto the predeceonal process of the agency (E AEMPflON h
- 6. The wthheld informaton is enerreted from public d.sclosure because ets d'sclosu er would result in a clearty unwarf arwed invason of personal prhacy. IEXEMPTION 61
- 7. The wthheld informaton consests of investgatory records comp 4ed for law enforcement purposes and is beeg n'thheld for the reasonist indicated (EXEMPTION 71 0.sclosure would etertere wth an enforcement svoceeveg because it could reveal the scope, d recton, and tocus of enforcement efforts. and thus could posse #y aflow them to take action to shield potent.af wrongdoing or a viotat.on of NRC reqvvernents from evestigators. qExtMPTION 7t All Oecloeure would constrtute an unwarranted invas oo of personal prmacy IEXEVPTION 7ical The informaton cons,sts of names of indevea!s and other information the deciosure of wh.ch would reveal contitwo of conf 4 ental sources IEAEMPTION 7tDil PART 11 C-DENYING OFFICIALS Pursuant to 10 CFR 9 9 and 'or 915 of tre U S. Nucisar Regulatory Coresson regutstons. It has teen wermire that the informaton ethread e a aerrot from producten or disclosure.
and that its production or deciosure as contrary to the putd e interest. The persons respons.ble for the dernal are those offices 6dentAed below as denying offcWs and the Oroctor.
Deve.cn of Aules and Records. Offic* of Admeestraton, for ariy denials that may be apsealed to the Eiecusve Dweetor for Operations <tD01 OENytNG OFFICIAL TIT LE / OF FICE RECORDS OENIEO APPELLATE OFFICIAL t rDo
[ h Tf 6/ M d4 C. s e NA4 sicattaev
- reus f Amsy' w ma.mrwer-r r c -/ c-7 x grys c. _ pra C -/ 2- 4 1
e esz su.pra cs-s c- 7 I
I l
PART ll 0- APPE A* 88GHTS The denial by each denymg official identded in Part ILC may be appealed to the Appeltate Officia4 C14ed in that section. Any such appeal must be in writing and must be made vnthin 30 days of receiot of this response. Appeats must be addressed as appropedte to the Esecutrve Director fe' Operations or to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20565, and shoulo -learfy state on the envek,pe and in the letter that N is an "Appeal fiom an innial FOIA Decision, arac ponu es4 see,t a y,3,,1UCLEAR REOULATORY COMMISSION
- 8 FOlA RESPONSE CONTINUATION
i Re: F0!A-88-322 APPENDIX A RECORDS ALREADY AVAILABLE IN THE POR
- 1. 4/14/87 Memorandum for Chairman Zech from Victor Stello, Jr.,
re: Implementation of Reconmendations of Comanche Peak Report Review Group, with enclosures 1 and 2 (24 pages). PDR Accession No: 8708210103
- 2. 8/19/87 NRC Announcement entitled, "NRC Releases Documents Related to Investigation of Staff Actions in Texas Nuclear Power Plant Case," (1 page). PDR Accession No: 8708200033
!~
i i
I t
t 1
Re: F01A-88-322 APPENDIX B RECORDS BEING PLACED IN THE PDR
- 1. 4/24/87 Memorandum for Gary J. Edles from Sharon R. Con.1elly, re: Staff Requirements Memorandum - Management Meeting of April 14, 1987.
(1page).
- 2. 8/3/87 Memorandum for Victor Stello from William H. Briggs, Jr.,
re: Decision on Release of Material Subject to F01A Request.
(1page)
- 3. 8/7/87 Memorandum for William Briggs from Victor Stello, re: Release of Documents Related to Comanche Peak, with enclosure 1.
(3 pages)
- 4. 9/2/87 Memorandum for Thomas A. Rehm from Thomas E. Murley, re: Comanche Peak Report Review Group, with enclosures.
(9 pages)
- 5. 12/14/87 Memorandum for James Lieberman from Thomas E. Murley, re: Recomendations Pursuant to the Comanche Peak Report
< Review Group (CPRRG) Recomendations. (2 pages)
- 6. 1/14/88 Memorandum for F. J. Hebdon from Jack W. Roe, re: DLPQ Input to the Plan for Implementing Recommendations from the Comanche '
Peak Report Review Group (CPRRG) Report. (3 pages)
- 7. 1/26/88 Memorandum for James L. Milhoan from Frank P. Gillespie, re: Design Documents, with enclosure. (5pages)
- 8. 1/29/88 Memorandum for James Lieberman from A. Bert Davis, re: Recomendations Pursuant to the Comanche Peak Report Review Group (CPRRG) Recomendations. (1page)
- 9. 3/10/88 Memorandum for the Record, re: Comanche Peak Report 766 Taskings. (1 page) 10, 6/17/88 Typewritten note to "Mark," with attachments (3 pages)
- 11. 8/25/87 Memorandum for Victor Stello, Jr. from James G. Keppler, re:
CPRRG Recomendations. (2 pages) 12, 9/4/87 Memorandum for Thomas Rehm from William G. Mcdonald, re:
Comanche Peak Report Review Group. (1 page)
- 13. 12/9/87 Memorandum for James H. Sniezek from James L. Milhoan, re:
Design Documents. (1 page)
-e . -- - - - --n- - - -
-g-- ,y.--,m ,- ._-,m.w,y,- -m-- - -,-,s--.,m y- y ,-~, ,--m - --m4 nc-- - -
Re: F0!A-88-322 APPENDIX B (Cont)
RECORDS BEING PLACED IN THE PDR 14, 3/15/88 Memorandum for various addressees from James M. Taylor, re:
Reactor Inspection Planning. (1 page) ,
- 15. 11/20/87 Memo for J. M. Taylor from Robert D. Martin, subject: Review of Comanche Peak Report Review Group (Arlotto Report) (2pages)
Re: F01A-88-322 APPENDIX C RECORDS TOTALLY WITHHELD
- 1. Undated Draft Memorandum for Chaiman Zech from Victor Stello, Jr.,
re: Implementation of Recomendations of Comanche Peak Report Review Group. (7 pages)
- 2. Undated Enclosures 3 through 6 of document A/1. (8pages)
- 3. Undated Handwritten note with attached Draft Memorandum for Chairman Zech from Victor Stello, Jr., re: Implementation of Recomendations of Comanche Peak Report Review Group, with attachment 2.
(12 pages)
- 4. Undated Draft Enclosure 2 to document A/1. (4 pages)
- 5. Undated Handwritten note to Vic from Jim T. with attached Draft Memorandum for the Commissioners from Victor Stello, Jr.,
re: Impleme.itation of Recommendations of Comanche Peak Report Review Group. (11pages) i l 6. Undated Draf t Memorandum for Chairman Zech from Victor Stello, Jr.,
re: Implementation of Recomer.dations of Comanche Peak l
Report Review Group. (9 pages)
- 7. 11/30/87 Comanche Peak OIA Report 86-10 Review Group (CPRRG). (1 page)
- 8. 3/25/87 Handwritten note to Mr. Chandler from J. Whitney, re: CPRRG Report Recomendations with attachment. (24 pages)
- 9. 4/21/87 Mer.orandum for Comissioners Roberts, Asselstine, Bernthal and Carr from Lando W. Zech, Jr., re: Recomendations of the Executive Director (E00) Pursuant to the Comanche Peak Reports.
(2 pages) 10, 5/12/87 Memorandum for Victor Stello, Jr., from Lando W. Zech, Jr.,
re: Recomendations Pursuant to the Comanche Peak Reports.
(2pages)
- 11. 5/12/87 Memorandum for Victor Stello, Jr., from Lando W. Zech, Jr.,
re: Recomendations Pursuant to the Comanche Peak Reports with annotations. (1 page)
- 12. 5/12/87 Memorandum for Victor Stello, Jr., from Lando W. Zech, Jr.,
re: Recomendations Pursuant to the Comanche Peak Reports with annotations. (2 pages)