ML20206E871

From kanterella
Jump to navigation Jump to search
Informs That EDO Assumed Responsibility for Three Actions on 766 Sys Recommended in Comanche Peak Rept
ML20206E871
Person / Time
Site: Comanche Peak  
Issue date: 06/17/1988
From:
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20206E778 List:
References
FOIA-88-322 NUDOCS 8811180223
Download: ML20206E871 (3)


Text

- - - - - - - -

e

[d,...

UNITED STATES M}

NUCLEAR REGULATORY COMMISSION 4 I wasHiNotoN. o c. 2 cess 4,

orner or

//

dP /7 "unWA^a a In March 1988 the EDO assumed responsibility for the 3 actions on the 766 system recommended in the Coc:=anche PeakReport. These are recom-a sendations #54, 76, 77. The EDO effort on this is being led by Tom Martin, Chief of the Regional Operations Staff. All the regional offices, NRR, i

hMSS, OE, OSP and ARM are participating in reviewing A0)(D4 and further refining tMe proposal. The goal is to have (first phase of) a new system in place by January 1989.

s

.6L.w..,

.......s l

=

t l

881k100223 001108 PDR FOIA CONDITOO-322 PDR s

____.m.-

UNIT tD $T ATE 5

" *g NUCLE AR REGUL ATORY COMMISSION waswiNotow.o.c.acsss e

j

/

't y o...*

'7/2/IY OPIG. DUC DA1E t Net-TICHET Hot 6 7,o n o

0Mt. VJ C10k 0101.1.0. JR.

DOC DATEt 10/05/07 HRR FCVD DATCt 10 / t.e / A 7 31 CHAIAHAN ZCC6 ra Y CI.I.0W

  • s

)R SIGNATURE Or1 T. C. MU.tLEY t

CCI HURLEY/SNTEICl!

Utt 3MPLEMENTATION OF RECOMMENDATIONS PURSUANT MIRAGLIA STAPOSTECHI F:L AH A PMAS 100007 HOSCF:URG IFEFRED 101 SNIEIEH/ R t O P.t{, b CONTACT 1 ACTION (Lee 38Xne.m

  1. E*MMM

.n n ' e m s TOR Action.

,84 AS$$NID To ri c h.

BY M 19TT

\\

c-}g.

p'k

/7

~

k 49,-11 Yt y@# f e& $n.

fe

/

AQ t.

pyg N

k REVISION OF YELLOW IT h

DATES HAY BE MADE. WITH TIP J

L ON, THRU THE WEEHLY WITS CEC

'O ONE WEEK AFTER ASSIGN-Cut

-f f

! MAIL ROOM. THE WEN DUE W /PA/u

' PROVED DY NRR MAILR00Me DE j

OR1

!D TO TRACK DIVISION COR-

%l.ICOMPLETIONSCHEDUL MD!

DIRECTORS OFFICE

/A4/.

p g

q x\\g s

o 3-ESTIMATED COMPLET10N DATE CATEGORY 11 REC 0WENDATIONS REGIONAL ASSESSMENT OFFICE 1Di ACTION

- "" N-M NRR Improve regional assessment function 75 to require more frequent and timely in depth evaluations of the region's plant inspection perfomance and documentation practices.

Decer.ber 1988 766 3YSTEM OFFICE 3

ltf ACTION Develop a more comprehensive, unified NRR/ ARM

~'

54 766 System that meets current agency Consider the monitoring of site

- 3W^c M needs.

specific inspection prefirams, periodic regional monitoring of ' nspection E@

program status, and headquarters over-ngp view.

Istiblish inspection and enforcement NRR/ ARM """"~

k PJME

/

76,

data qualit;' assurance' policies and

] g )f&&

procedures as well as a training program to help assure a consistent, re11able, and timely agency data source.

N Consider collecting all inspection and NRR/ ARM -

77 enforcement staff resourse data in 7M Iib 6 RITS. Evaluate the benefits of co'l-1ecting inspection inforwtton by SALP functional area rather by inspec-l tion module.

f

-