MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
t p reo o
'g UNITED STATES
!*, o NUCLEAR REGULATORY COMMISSION
{ ,I wAssiNo ton, p. c. rosss
\...*/ JM 14 $88 ge .p .
MEMORANDUM FOR: F. J. Hebdon, Chief 504 Irspection Licensing, & Research Integration Branch p
- Office of Nuclear Reactor Regulation , p b , [. .
FROM: Jack W. Roe, Director , ,3 m s y m py _7 e Division of Licensee Performance end Quality Evaluation C25C W C Q U' ?
Office of Nuclear Reactor Regulation - uco lo Cew 99cc.
SUBJECT:
DLPQ INPUT TO THE PLAN FOR IMPLEMENTING RECOMMENDATIONS FROM THE COMANCHE PEAK REPORT REVIEW GROUP (CPRRG) REPORT DLPQ has res,nonsibility for resolving five of the explicit recomendations
- contained in the Comanche Peak Report Review Group's (CPRRG) Report. OLPQ has reviewed the CPRRG report and has made the following determinations (recomendations are denoted by reference ID number).
- 1. ID 04 - ANSI N45.2.9 is silent on shipping records. A definitive and documented regulatory position does not exist on controls during transfer between organizations.
NRC position - IMC 9900 "Technical Guidance," on ANSI N45.2.9, addresses QA record storage facilities but does not address the shipment of QA records.
Reasonable protection should be afforded to lifetime QA records during shipping or transfer. Reasonable, in reference to QA record protection during shipping or transfer, means taking into consideration the type of records and their importance to safety, the distance they are being shipped, the time required to ship them, the actual container in which the records are placed, the mode of transportation, and personnel who are responsible for transporting the records. Records should be inventoried to maintain accountability. All variables considered, prudent judgment on the part of l the licensee and by the inspector should be employed in detennining what is an acceptable means of shipping records. :
D More prescriptive guidance for the shipping of QA record is not .ecessary.
- 2. ID 05 - Clarify agency guidance: IE MC 9900 guidance was misinterpreted on applicability of 10 CFR 50 Appendix B criteria to the requirements of 10 CFR 50.55(e).
NRC position - IMC 9900, on 10 CFR 50.55(e), requires that means to assure i prompt notification 6nd adequate reporting of contruction deficiencies under 10 CFR 50.55(e) should be an integral part of each licensee's QA program.
Contact:
y ' R. P. 490-9693 Correia, NRRN a
)
-sf
F. J. Hebdon Maintenance and retrievability of the licer. sees' records of identified deficiencies reported under the requitements of 10 CFR 50.55(e) and their implementing procedures is importcnt. So long as they exist, it is not critical under which heading, Appendix B or 50.55(e), the licensee's 10 CFR 50.55(e) implementing procedures and records of deficiencies are found, o- Clarification should be made in IMC 9900, b 3. ID 64 - The philosophical position as stated by Re ion IV (tnat although aprocedurerequiredconcretemixerbladeinspe:tions,ktdidnotrequire documentation of such inspections) requires careful consideration.
NRC position - 10 CFR Part 50, Appendix B, Criterion XVII, "Quality Assurance Records," requires that sufficient records be maintained to furnish evidence of activities affecting quality including the results of inspections.
Criterion X, "Inspections," requires a program for inspection of activities affecting quality to be executed to verify conformance with instructions, procedures, and drawirigs.
No change to the current NRC policy or guidance is necessary.
- 4. ID 65 - Consideration should be given to the Technical Review Team (TRT) rp p sition that "permanent" records removed from storage for use or revision revert to an "in-process" status.
p? p NRC position - For the purposes of N45.2.9. a document is considered a QA
[g[ record (either lifetime or non-permanent) when the document has been completed. Any time a QA record is handled for review, revision, shipping,
/ or use, reasonable care should be taken to ensure that the record will not be damaged, lost, or destroyed. Reasonable care in handling QA records could include placing a duplicate of the record in the permanent storage locatton; training individuals on the importance of how QA records should be har.dleti; what should be done to avoid misplacement, destruction or damage to them (e.g. no food, drink, or smoking materials in the vicinity of the records);
placing the records in appropriate locations such as metal file cabinets when not being used; and mininizing the time the records are away from their storage location.
No change to the current NRC policy or guidance is necessary. -
- 5. _10 07 - No guidance exists on the time permitted to retrieve a document that is required to be retrievable. . ,
NRC position - Time pennitted to retrieve a document should be derived from several factors, all based on reasonable judgments made by the licensee and the inspector. These factors are the record's importance-to-safety with con-sideration given to the situation at hand (i.e. during normal plant operations, in accident or emergency conditions, during an outage, an investigation, or an inspection) when the request is made to retrieve a record. Also, the location of the document (at or away from the location of
F. J. Hebdon the requester), and the size of the record (i.e. number of pages or volumes) ,
should be considered. The licensee and the inspector should agree upon a reasonable time required to retrieve a particular record.
l No change to the current NRC policy or guidance is necessary.
- Please contact me if we can be of further assistance in these matters.
f 1 Jac W. Roe,Directorf Divi ion of Licensee Ie,,rformance an Quality Evaluation '
Office of Nuclear Reactor Regulation i