|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span NOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested ML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 1999-09-30
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20055H8241990-07-27027 July 1990 Responds to Re NRC 891214 License Amend Granting Transfer of Operational Control of Plants.Nrc Will Not Initiate Antitrust Review to Consider Imposing Addl License Conditions ML20055E2841990-05-30030 May 1990 Final Response to FOIA Request.App C Record Encl & Available in PDR ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20246D8951989-08-18018 August 1989 Forwards Safety Evaluation Re Dispute Between Case & Util on Acceptability of Jul 1982 RCS Cold Hydrostatic Test DD-89-04, Advises That Time for Commission to Review Director'S Decision DD-89-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 890721.W/Certificate of Svc.Served on 8908081989-08-0707 August 1989 Advises That Time for Commission to Review Director'S Decision DD-89-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 890721.W/Certificate of Svc.Served on 890808 ML20247Q4001989-07-27027 July 1989 Advises That Recipient 890713 Motion to Reopen Record Withdrawn,Per 890725 Request.W/Certificate of Svc.Served on 890729 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245D0521989-06-16016 June 1989 Informs of Understanding of Dispute Between Case & Texas Utilities Electric Co,Including Issues Involved in Dispute & Update on NRR Plans for Resolution.Summary of Understanding of Dispute Encl ML20244B1211989-06-0909 June 1989 Partial Response to FOIA Request for Documents.Forwards App E & F Documents.App E Documents Also Available in Pdr.App F Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7). App G Totally Withheld (Ref FOIA Eexemption 7) ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20247G6141989-03-28028 March 1989 Advises of Plans to Resolve Case Dispute W/Util Re RCS Cold Hydrostatic Test for Plant Conducted & Recorded in 1982,per Case 890313 & 17 Ltrs.Public Meeting Will Be Held in Arlington,Tx to Assure That NRC Understands All Info ML20247C9571989-03-23023 March 1989 Forwards Fr Notice Denying 890120 Petition for Immediate Action to Suspend OL & Reopen Ofc of Investigations Case 4-86-004 ML20235G1771989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) IA-88-524, Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6)1989-01-17017 January 1989 Responds to 890118 Appeal of 890109 Denial of FOIA Request for Records Re Insp of Comanche Peak Plant on 880803-0908. App C Document Continues to Be Withheld (Ref FOIA Exemption 6) DD-88-18, Advises That Time for Commission to Review Director'S Decision DD-88-18 Expired.Commission Declined Review. Decison Became Final Agency Action on 881212.Served on 8812161988-12-15015 December 1988 Advises That Time for Commission to Review Director'S Decision DD-88-18 Expired.Commission Declined Review. Decison Became Final Agency Action on 881212.Served on 881216 ML20206H0921988-11-17017 November 1988 Partial Response to FOIA Request for Documents.Forwards App F Documents.App F Documents Also Available in PDR ML20206H5971988-11-14014 November 1988 Responds to Appeal of Partial Denial of FOIA Request for App F Documents.Request Approved in Part & Denied in Part. Portions of Documents 1,3,5,23,25 & Attachments to Document 20 Withheld (Ref FOIA Exemption 5) ML20206H4941988-11-10010 November 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G1951988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents & Records Available in Pdr.App D Documents Also Available in PDR ML20206E7741988-11-0808 November 1988 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App B.Documents Being Placed in Pdr.App a Documents Also Available in Pdr.Documents Listed in App C Totally Withheld (Ref FOIA Exemption 5) IA-87-590, Final Response to FOIA Request.No Agency Records Subj to Request Located1987-10-0808 October 1987, 28 October 1988 Responds to Appeal of Denial of FOIA Request for Documents. Portions of Document Identified in App D Withheld (Ref FOIA Exemption 3).Forwards Nonexempt Portions, Final Response to FOIA Request.No Agency Records Subj to Request Located ML20206E6611988-10-28028 October 1988 Responds to Appeal of Denial of FOIA Request for Documents. Portions of Document Identified in App D Withheld (Ref FOIA Exemption 3).Forwards Nonexempt Portions IA-88-152, Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl1988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20206C1801988-10-17017 October 1988 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.App B Records Encl But Not Placed in Pdr. App C Documents Not Encl & Not Placed in Pdr.W/O Encl ML20205E9561988-10-0505 October 1988 Final Response to FOIA Request for Documents.Forwards App B Documents.Apps a & B Documents Also Available in PDR DD-88-14, Advises That Time for Commission to Review Decision DD-88-14 Expired.Commission Declined Review.Decision Became Final Agency Action on 880916.Served on 8809261988-09-23023 September 1988 Advises That Time for Commission to Review Decision DD-88-14 Expired.Commission Declined Review.Decision Became Final Agency Action on 880916.Served on 880926 ML20151Y3431988-08-22022 August 1988 Responds to 850515 Submittal & 850531 Amend,On Behalf of Nuclear Awareness Network Requesting Enforcement Action Concerning Facility.Request Denied for Reasons Stated in Encl Director'S Decision Under 10CFR2.206 ML20151W5631988-08-16016 August 1988 Forwards Memo to Jg Partlow Re Mutually Agreed Upon Interpretation of Certain Provisions of Joint Stipulation in Proceeding.W/O Encl.Related Correspondence ML20151W4021988-08-0303 August 1988 Fourth Partial Response to FOIA Request for Documents.App H Documents Encl & Available in PDR ML20151C5181988-07-15015 July 1988 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision 88-09 Expired & Became Final Agency Action on 880712.Served on 880719 ML20196H0571988-06-23023 June 1988 Forwards Draft Pages from Ofc of Inspector & Auditor Rept 86-10, Allegations of Misconduct by Region IV Mgt Re Comanche Peak Steam Electric Station, Per Attached List.W/O Encls.Related Correspondence ML20196A3331988-06-17017 June 1988 Ack Receipt of 880317 Petition,Filed Per 10CFR2.206 by Addressees,On Behalf of Organizations Addressees Represent Re Delaying Commission Voting on Full Power OL for Facility Until NRC Completes Investigation of Allegations ML20195E8821988-06-15015 June 1988 Third Partial Response to FOIA Request for Documents.App C, E,F & G Documents Encl & Available in Pdr.App D Documents Available in Pdr.Portions of Records Subj to Request Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155C3731988-05-25025 May 1988 Advises of Projected Schedule for Issuance of NRC Ssers Re Collective Significance & Evaluation Repts,Per . Next Rept on Cable Trays Should Be Issued on 880624 & Sser Re Environ Activities Anticipated on 880630 ML20155C3071988-05-24024 May 1988 Advises That NRC Counsel Will Not Be Executing Nondisclosure Statement,Per NRC Manual Chapter Governing Treatement of Protected Info by NRC Employees,Per Recipient ML20153F6141988-05-0202 May 1988 Final Response to FOIA Request for Documents Re Investigation of Alleged Improper Disclosure of NRC Memo. Forwards Documents Listed in App A.Documents Also Available in PDR ML20151Z5571988-04-28028 April 1988 Responds to FOIA Request for Copies of Quality First Program Files at Plant.Document Listed Under App Available in Pdr. Remaining Records Withheld (Ref FOIA Exemption 6) ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151C0221988-04-0707 April 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.App a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20148J7801988-03-25025 March 1988 Final Response to FOIA Request for Documents Re Insp Repts 50-445/87-27 & 50-446/87-20.App B Documents Encl.App a Documents Available in PDR ML20151X8531988-03-22022 March 1988 Advises That Commission Regulations Do Not Authorize Appeals from 2.206 Denials,Per 880321 Appeal for NRC to Enter 48 H Housekeeping Stay of Authorization for NRC to Issue Full Power License for Unit.Appeal Denied ML20150D1511988-03-17017 March 1988 Responds to Requesting 7 Days Delay of 880321 Meeting,So Gap Can Evaluate NRC Safety Significant Assessment Team Rept.Request Denied & Gap Not Allowed to Address Commission at Meeting ML20148B2811988-03-16016 March 1988 Addresses Issues Re Mgt of fitness-for-duty Program Causing Dissatisfaction Among Workers & Competence of Workers Participating in Final Const Stages,Per .No safety-related Matters on Which Action Can Be Taken Exist ML20150C7341988-03-15015 March 1988 Final Response to FOIA Request for Documents.App I Documents Encl & Available in Pdr.App J Records Totally Withheld (Ref FOIA Exemption 5) IA-87-811, Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs1988-03-14014 March 1988 Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs ML20150B9051988-03-14014 March 1988 Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs 1990-07-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements 1999-09-09
[Table view] |
Text
s .sm 1[ ( { FOIA - $?-V3T RESPONSE TYPE I
Io,,
- [k ,
e i RESPOkS TO FREEDOM OF ._l o^ "
= 'b@ ate
- INFORMATION ACT (FOIA) REQUEST ee..e
/* ,
APR 2 51989 DOCKET NUMBER ($1 Irf apphcablef 4
i MOUESTOR '
PART L- AGENCY RECORDS RELEASED OR NOT LOCATED (See checked boxes)
No agency records subsect to the request have been located.
No additional agency records subsect to the request have been located.
Roquested records are available through another pubhc distribution program. See Comments Section.
Agency records subject to the request that are identehed on Appendiales) are already available for public inspection and copying in the NRC Public Documc - 'r)21 L Street. N W , Washington, DC 20555 Agency records subject to the request that are identehed on AppendialesL _ _ _are being made available for pubhc inspection and copying in the NRC Pubhc Document Room. 2021 L Street, N W, Washington, DC, in a folder under ths FOIA number and requester name The nonproprietary version of the proposalts) that you agreed to accept in a telephone conversation with a rnember of my staff is now being made available for public inspection and copying at the NRC Pubbe Document Room 2021 L Street. N W., Washington, DC, in a folder untier this FOlA number and requester name Agency records subject to the request that are identified on Appendistest_ . may be inspected and copied at the NRC Local Pubhc Document Room identified in the Comments Section Enclosed is information on how you may obtain access to and the charges for copying records placed in the NRC Put.hc Document Room 202) L Street. N W ,
Washington, DC.
Agency records subject to the request are enclosed Records subject to the request have been referred to another Federal agencybest for review and direct response to you You will be billed by the NRC for fees torsling $
In view of NRC's response to this request, no further action it being taken on appeal letter dated . No _.,
PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld f rom pubhc dulosure puest, ant to the esemptions described in and for thi +easons stated m Part ll sections B C, and D. Any released portions of the documents for which only part of the record is being othheld are being made avadarY tot putN Inspecbon and copy'ng in the NRC Pubi c Docurnent Room, 2021 L Street, N W., Washington, DC. in a folder under thn FOl A numt tv and requester twt e h.
se j i .'
SIGN L/RE, DIRECTOR VISION F + REEDOM OF INFORMATION AND PUBLICATIONS SERVICE S h + /_ f,Mg 8905040289 890425 PDR FOIA BAUMhNB7-535 PDR NRC FORM 404 IPart it I
L ;.-
l Re: F01A-87-535 l i
l APPENDIX B RECORDS MAINTAINED AMONG PDR FILES k
- 1. DIAReport86-10(F01A-86-838; MURPHY) .
- 2. DIA Report 186-40 (F01A-87-668; STEPHENS) i
- 3. 0IA Report 186-56 (F01A-88-217; MUNCEY) l 4. OIAReport85-10(F01A-86-133; GARDE) t
- 5. DIAReport84-29(F01A-86-133; GARDE) I
- 6. DIA Report 84-20 (F01A-86-133; GARDE)
-7. DIAReport83-11(F01A-86-133; GARDE)
- 8. DIA Report 83-47 (F01A-84-210; LODGE)
- 9. 01A Report 83-89-(F01A-84-210; LODGE)
- 10. DIA Report 82-15 (F01A-83-439; LODGE)
I 85-49
- 11. 11/2/84 Letter to Glenn L. Koester from Richard P. Denise, with enclosure. (7 pages) PDR Accession No. 8411090295 and 8411090297
- 12. 12/19/84 Letter to Glenn L. Koester from R. P. Denise, with enclosure.
(12 pages) PDR Accession No. 8501030430 and 8501030434
- 13. 1/23/85 Letter to Glenn L.' Koester from R. P. Denise, with enclosure.
(6 pages) PDR Accession No. 8501290495 and 8501290511
- 14. 2/28/85 Letter to Glenn L. Koester from R. P. Denise, with enclosure.
(19 pages).PDR Accession No. 8503050347 and 8503050355
- 15. 3/14/85 Letter to Glenn L. Koester from R. P. Denise, with enclosure. J (6 pages) PDR Accession No. 8503190335 and 8503190341 16, 5/15/85 Letter to the Honorable Nunzio Palladino from Billie Garde and others, with attachment. (19 pages) PDR Accession No.
8505160628
- 17. 5/24/85 Memorandum for Harold R. Denton from James Lieberman, re:
2.206 Petitiion by the Government Accountability Project, re: Wolf Creek. (4 pages) PDR Accession No. 8506060047
- 18. 5/28/85 Affidavit of Charles A. Snyder, re: Kansas Gas and Electric Company et al (Wolf Creek Generating Station Unit No.1).
(16 pages) PDR Accession No. 8506030507
b Re: F01A-87-535 l
APPENDIX B' RECORDS MAINTAINED AMONG PDR FILES (Continued)
- 19. 5/28/85 Affidavit of Kent R. Brown, re: Kansas Gas and Electric Company et al (Wolf Creek Generating Station Unit No.'1).
(10 pages) PDR Accession No. 8506030503
- 20. 5/29/85 Letter to Nunzio J. Palladino, et al from Jay E. Silberg, re:
Kansas Gas and Electric Company, et al. (Wolf Creek Generating Station, Unit 1). (5 pages) PDR Accession No. 8506030496 I 86-6 21, 3/7/84 Excerpts from 01 Report 4-84-006. (6 pages) (F01A-86-133; GARDE)
I 1
L Re: F01A-87-535 APPENDIX C l
I 86-6 i 1. 2/24/87 Briefing Paper, re: Comanche Peak - Allegations of l
Inefficiency by Technical Review Team (TRT) Personnel.
l (1 page)
- 2. 5/26/87 Memorandum for Victor Stello, Jr. from Sharon R. Connelly, re:
Alleged Improper Handling of Allegation by NRC Technical Review Team, Comanche Peak Steam Electric Station, with attachment.
.(24 pages)
- 3. 5/6/76 Letter to C. H..Gatchell from Herbert C. Crowder, re: Texas Utilities Services, Inc., Comanche Peak Steam Electric Station 1980-1982, Units 1 and 2, Grout Pipe Location, with attachment.
(17 pages)
- 4. 5/28/80 Memorandum to John Marshall from J. T. Merritt, Jr., re: NRC Question 362.15 TUS-2624 (Comanche Peak Steam Electric Station),withattachment. (37pages)
- 5. Undated CASE Exhibit. (24 pages)
- 6. 1/4/75 Letter to D. F. Knuth from Robert W. Caudle, re: Comanche Peak Steam Electric Station Reactor Building Excavation, File No.
10105, with attachment. (12 pages)
- 7. Undated CASE Exhibit 5. (69 pages)
- 8. 2/85 Safety Evaluation Report Related to the Operation of Comanche Peak Steam Electric Station, Units 1 and 2. (20 pages)
- 9. 2/24/83 Case's Provisional Proposed Findings of Fact, re: Application of Texas Utilities Generating Company, et al, for an Operating License for Comanche Peak Steam Electric Station Units 1 and 2 (CPSES). (62 pages)
- 10. 1/6/84 Memorandum for Office Directors from William G. Dircks, re:
Policy in Regard to the NRC, to Dealing w(ith with enclosure. Those who Provide Information 6 pages)
I I 85-12
- 11. 1/10/85 Note to Ben B. Hayes from Joseph F. Scinto, re: Allegation of Improper Disclosure of Confidential Information by 01 Investigator - Deposition of Evert Mouser, with attachment.
(10pages) 1 l
Re: F01A-87-535 APPENDIX C (Continued) 85-29
- 12. 5/23/85 Memorandum for Ben B. Hayes from Sharon R. Connelly, re:
Allegations of Improper Disclosure of Confidential Information by OI Investigator, with attachment. (20 pages)
- 13. 5/1/85 Report of Interview of Evert Mouser. (1 page)
- 14. 4/30/85 Report of Interview of Donald D. Driskill. (2pages)
I 86-54
- 15. 2/19/87 Memorandum for Sharon R. Connelly from Mark E. Resner, re:
INQ 86-54. (1 page)
- 16. 1/28/87 Memorandum for Sharon R. Connelly from Mark E. Resner, re: INQ 86-54. (1 page)
- 17. 7/15/86 Memorandum for Sharon R. Connelly from Robert D. Martin, re:
NRCM 0702 Referral, with attachment. (18 pages)
- 18. 2/12/87 Memorandum for Sharon R. Connelly from Robert D. Martin, re:
Review of Lawsuit Records by Houson Lighting and Power, with enclosure. (132 pages)
I 85-49
- 19. 6/28/85 Memorandum for James Lieberman from Sharon R. Connelly, re: 10 CFR 2.206 Petition Regarding Wolf Creek. (1 page)
- 20. 6/12/85 Memorandum for Sharon R. Connelly through Keith G. Logan from 10 CFR 2.206 petition Regarding Wolf Creek Mark E. Recner,(re:1 (INQ. 85-49). page)
- 21. 5/31/85 Handwritten notes. (1 page)
- 22. 5/30/85 Memorandum for Sharon Connelly from James Lieberman, re: 10 CFR 2.206 Petition re: Wolf Creek. (1 page)
I 85-11
- 23. Undated Case Summary, re: File No. INQ 85-11. (1 page)
- 24. 4/11/85 Letter to Billie P. Garde from Sharon R. Connelly. (1 page)
- 25. 4/1/85 through Keith G. Logan from Memorandum Anthony Ward, re: for Sharon R. Connelly(Waterford 3 - Allegation of Inquiry 85-11 Ineffective NRC Inspections). (2 pages)
l l
Re: F01A-87-535 APPENDIX C (Continued)
- 26. 1/30/85 Letter to Billie P. Garde from Sharon R. Connelly. (2 pages)
- 27. 3/14/85 Memorandum for the File from George A. Mulley, re: GAP l Allegations Concerning Waterford III. (1 page) !
- 28. 2/20/85 Memorandum for Sharon R. Connelly through George H. Messenger and Hollis Bowers from Henry S. Blumenthal, re: Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
- 29. 2/6/85 Memorandum for Sharon R. Connelly through Hollis Bowers from ,
Henry Blumenthal, re: Telephone Conversation with Ms. Billie Garde, i Government Accountability Project. (1 page)
- 30. 3/20/85 Memorandum for Samuel J. Chilk from Sharon R. Connelly, re:
Review of Closed Commission Meeting Transcript. (1 page)
- 31. 3/8/85 Memorandum for Sharon R. Connelly through George H. Messenger and Keith G. Logan from Henry S. Blumenthal, re: Attempted Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
- 32. 3/5/86 Memorandum for Sharon R. Connelly through George H. Messenger l and Keith G. Logan from Henry S. Blumenthal, re: Attempted J Telephone Conversation with Billie Garde Concerning l Waterfcrd 3 Allegations. (1 page) i 33, 3/5/86 Memorandum for Sharon R. Connelly through Keith G. Logan from ;
George A. Mulley, Jr. , re: GAP Allegations Concerning j
> Waterford III. (1 page) l l
34, 3/1/85 Memorandum for Sharon R. Connelly through George H. Messenger j and Hollis Bowers from Henry S. Blumenthal, re: Telephone j Conversation with Billie Garde Concerning Waterford 3 '
Allegations. (1 page) 35, 2/28/85 Declaration of Hollis Bowers, re: Government Accountability Project v. United States Nuclear Regulatory Commission.
(5 pages) j l
- 36. 2/28/85 Memorandum for Sharon R. Connelly through George H. Messenger l and Hollis Bowers from Henry S. Blumenthal, re: Attempted l Telephone Conversation with Billie Garde Concerning l Waterford 3 Allegations. (1 page) l l
- 37. 2/27/85 Memorandum for Sharon R. Connelly through George H. Messenger l and Hollis Bowers from Henry S. Blumenthal, re: Attempted Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
Re: F01A-87-535 APPENDIX C (Continued)
- 38. 2/25/85 Memorandum for Sharon R. Connelly through George H. Messenger and Hollis Bowers from Henry Blumenthal, re: Telephone Conversation with Billie Garde Concerning Waterford III Allegations. (1 page)
- 39. 2/25/85 Memorandum for File INQ 85-11 from Mark E. Resner, re:
Waterford III. (1 page)
- 40. 2/20/85 Memorandum for Sharon R. Connelly through George H. Messenger and Hollis Bowers from Henry S. Blumenthal, re: Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
- 41. 2/19/85 Memorandum for Sharon R. Connelly through George H. Messenger and Hollis Bowers from Henry S. Blumenthal, re: Attempted Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page) 42, 2/14/85 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry Blumenthal, re: Waterford 3 Allegations. (1 page)
- 43. 2/12/85 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry S. Blumenthal, re: Attempted Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
- 44. 2/11/85 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry S. Blumenthal, re: Attempted Telephone Conversation with Billie Garde Concerning Waterford 3 Allegations. (1 page)
- 45. 2/6/85 Memorandum for Sharon Connelly through Hollis Bowers from Henry Blumenthal, re: Telephone Conversation with Ms.BillieGarde,GovernmentAccountabilityProject(GAP).
(1 page)
- 46. 1/24/85 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry S. Blumenthal, re: Waterford 3 Allegations Received from Region IV. (1 page) 47, 1/17/85 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry S. Blumenthal, re: Investigative Analysis of Waterford 3 Allegations Received from Region IV on January 4,1985.
(3 pages)
- 48. 12/31/84 News Articles, re: Waterford. (2 pages)
____________ ____ - - _ a
Re: F01A-87-535 APPENDIX C (Continued) ;.
i l
l l
- 49. 3/1/85 Letter to Billie Garde from J. M. Felton, re: F01As-84-426, ;84-449,84-A-55(84-449)and84-A-65(84-426). (2 pages)
- 50. Undated Advertisement, re: Wolf Creek. (1 page)
- 51. Undated Advertisement, re: Wolf Creek. (1 page)
- 52. Undated Advertisement, re: Wolf Creek. (1 page) 1
- 53. Undated Advertisement, re: Wolf Creek. (1 page) .
- 54. 1/4/84 Note to Sharon Connelly from Robert Martin, re: Memorandum ,
Regarding Ineffective NRC' Inspection. (1 page) 1
- 55. 1/4/85 Memorandum for Sharon Connelly from Robert D. Martin, re:
Allegations of Ineffective NRC Inspection - Waterford 3, with i attachment. -(30 pages)
- 56. 1/17/86 Memorandum for Sharon R. Connelly through Hollis Bowers from Henry S. Blumenthal, re: Investigative Analysis of Waterford 3 Allegations Received from Region IV on January 4,1985.
(3 pages)
Re: F01A-87-535 APPENDIX D RECORDS ENCLOSED
- 1. Undated Case Summary. (1 page)
- 2. 11/28/84 Memorandum.for William J. Dircks from Sharon R. Connelly, re:
Alleged Breach of Confidentiality by NRC Employees. (2 pages)
- 3. 11/13/84 Washington Post News Article. (1 page)
- 4. . 11/13/84 News Article. (1 page)
- 5. 10/24/84 News Articles, re: Comanche Peak. (5 pages)
- 6. 10/4/84 Memorandum for File from Hollis Bowers, re: GAP Memoranda of August 8, 1984 to Office of Investigations. (1 page)
- 7. 8/15/84 Memorandum for File through George H. Messenger from Ronald M.
Division Smith, re:NRR.
of Licensing, Meeting1(with page)Darrell Eisenhut, Director,
- 8. 8/28/84 Report of Interview of [ client]. (2 pages)
- 9. 9/7/84 Report of Interview of Peter K. Van Doorn. (2 pages)
- 10. 11/15/84 Report of Interview of H. L. Hill, Jr.
(2 pages) 1
- 11. 11/14/84 Report of Interview of M. R. Todd. (2 pages)
- 12. 9/10/84 Report of Interview of Thomas Ippolito. (7pages)
- 13. 9/10/84 Report of Interview of Stuart Treby. (5pages)
- 14. 10/19/84 Report of Interview of Geary Mizuno. (1 page)
- 15. 7/13/84 Letter to M. D. Spence from Darrell G. Eisenhut, re: Comanche Peak Special Review Team Report, with enclosure. (80 pages)
- 16. 12/3/84 Note to Hollis Bowers from T. A. Rehm, re: Alleged Breach of Confidentiality by NRC Employees [ client]. (1 page)
- 17. 8/9/84 Memorandum for Frederick Herr from Guy H. Cunningham, III, re:
[ client] Matter,withattachments. (5 pages)
- - - _ - - _ - _ _ - _ _ - _ _ _ _ .