Forwards Rept PAR(DCNP)-NDE-2 & Project Quality Plan Re Technical Assistance in Support of NDE Work at Plant.Table of Field Welds Chosen for Radiograph & Reader Sheet Review Also Encl
ML20210E616
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 11/23/1983
From: Lofy R
PARAMETER, INC.
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML16341D666 List: ... further results
References
FOIA-84-744 NUDOCS 8603280044
Download: ML20210E616 (9)


Text

!

o-P. a- i _, L . t . _ . . _ _ . _ , . . .

13380 WAf fetfonte PLA,est ROAO, ELM OA0vt. wescome6N S3122 s-. -

el6 FEE 79eo November 23, 1983 Mr. Dennis Kirsch, Section Chief Region V .

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Copy: W. Laudan, NRC/IE HQ, w/ encl.

Reference:

NRC Contract No. 05-82-249 PAR: NRC/IE-82/83

Subject:

Task Order No. 56 Technical Assistance in Support of NDE Work at Diablo Canyon per Scope of Work dated November 8, 1983

Dear Mr. Kirsch:

Forwarded herewith is copy of Report No. PAR (DCNP)-NDE-2, November 22, 1983, prepared by Kenneth Ristau pursuant to inspection work at Diablo Canyon last week.

Also attached is a copy of the Project Quality Plan we pre-pared for this acsignment. We routinely prepare these plans for NDE assignments for NRC in accordance with our contractual commitment. Due to the urgency of.this task, the plan was available cnly in draft form to Mr. Ristau and Mr. Hunt before the inspection.

Please let us know if there is anything else required. We look forward to working with you again.

Very truly yours, a

PAR TER, Inc.

Richard A.

DG.c~

Lofy President RAL mak Enclosures 9603280044 060123 e PDR FOIA #

DEVINE04-744 PDR

ed me ala r, se c. Report No. PAR (DCNP)-NDE-2 c o w s u tti m o suoineses Page 1 of 3 etm a nov a. wisc on sin November 22, 1983 Subject

1. Independent delta-ferrite measurements on 25 selected stainless steel welds to verify compliance witti Code and .

Regulatory Guide 1.31 requirements.

2. Visual and liquid penetrant examination of field welds .

FW110-Ill-112 in isometric package 2-14-31.

3. Examination of radiographs of 102 weld joints for compli-ance with Code, verification of adequacy of reader sheets and evaluation of overall quality of radiographs.

S References -

1. Outline of nondestructive examination work to be performed at Diablo Canyon, November 14-18, 1983 by NRC contract personnel (Exhibit 1).
2. Contract No. NRC-05-82-249 Task Order No. 56
3. PAR: NRC/IE-82/83 Writer of Report Kenneth A. Ristau, PARAMETER, Inc. , NDT Level III, MT, PT, RT'and UT .

Contract Personnel Assigned Daniel J. Hunt, Wisconsin Industrial Testing, Inc.,

Level II, MT, PT, UT Introduction The NRC outline of work (Exhibit 1) designates 3 welds to be liquid penetrant tested and visually examined.

The 25 stainless pipe welds.to be tested for delta-ferrite measurements were designated by Mr. Dennis Kirsch, NRC Section Chief. For a list of the welds and results of the inspection, see WIT report (Exhibit 3). Also see WIT report for results of visual and penetrant inspection (Exhibit 4).

Mr. Kirsch also indicated the 102 wolds of which radiographs were to be viewed (Exhibit 2).

i e ra me e le r, a c. Report No. PAR (DCNP)-NDE-2 co n sattino ' s uoi n e en s Page 2 atm aeova, wisconsin November 22, 1983 Record of Activities November 15 and 16 inspections were made by Dan ilunt and films were viewed by Ken Ristau. ,

In a short meeting with Dennis Kirsch, day end November 16, the results of our findings were conveyed verbally, as follpws:

1. The delta-ferrite measurements met the NRC requirements.
2. The LPT of all three welds were approved but FWill had one LP indication running transverse to the weld in the base material of the pipe. It was approximately 1/2" away from the weld and about 1" long.

~

3. The radiographs of the welds were viewed and approved as adequately meeting Code. Comments were also made by the writer concerning film quality, detail of reader sheet documentation and the excellent condition of the radiographs, nearly 10 years af ter x-ray date.

Conclusions

1. Having reviewed the radiographs and reader sheets of all 102 selected piping welds identified in Exhibit 2, the
writer found reader sheet documentation detailed and clear.

Radiographs were readily available, in good order and of ,

,very good quality. Radiographs are approved as meeting the requirements of applicable Codes.

2. All 25 welds selected for delta-ferrite measurements met the requirements of Code and Regulatory Guide 1.31 (See Exhibit 3).
3. Visual and liquid penetrant examination of FW110 and 112 were acceptable. FWill weld was also acceptable but an liquid penetrant indication was noted in the pipe base material (See WIT Penetrant Report, Exhibit 4).

=

a ede eler, a c. Report No. PAR (DCNP)-NDE-2 c o n s e tti m o suoimenes Page 3 of 3 etm osove. wisconsin November 22, 1983 List of Exhibits

1. Outline of Nondestruct.ive Examination Work to be Performed at Diablo Canyon, November 14-18, 1983, by NRC Contract'.

Personnel.

2. Field Welds Chosen for Radiograph and Reader Sheet Review.

. 3. Delta-Ferrite Measurements.

4. Visual and Liquid Penetrant Examinations.

Prepared by:

ffL /lL$ /r' W#

Kenneth A. RisfaQ, Level III Reviewed by:

{

Walter J. Fole/, Q/A Eng1'neer 0

9

,  %+

~

s Ebchibit 1 to Report No. PAR (DCNP)-NDE-2 November 8, 1983 OLTTLINE OF NON-DESTRUCTIVE EXAMINATION WORK TO BE PERFORMED AT DIABLO CANYON, NOVEMBER 14-18, 1983, BY NRC CONTRACT PERSONNEL GENERAL INFORMATION:

Location: Diablo Canyon Nuclear Plant, Unit Nos. I and 2

  • San Luis Obispo, California Licensee: Pacific Gas and Electric Company
  • Docket No. 50-275 and 50-323

Purpose:

1. Perform independent delta-ferrite messurements on about 25 selected stainless steel welds to verafy compliance with code and Regulatory Guide 1.31 requirements.
2. Visu, ally examine and perform liquid penetrant examination of field welds FW-110, Ill, 112 in isometric package 2-14-31.
3. Examine about 100 weld radiographs and verify reader sheet, radiograph and evaluation adequacy. -

Site

Contact:

Mr. Marvin Mendonca, NRC Senior Resident Inspector 305-595-2353 RV

Contact:

Mr. Dennis Kirsch, NRC Section Chief, 415-943-3740 Werk Nours: 0730-1630, November 14-18, 1983 REQblREMENTS:

To be furnishsd at the Diablo Canyon Site by the licensee:

Hard bats and safety glasses Insulation removal Scaffolding erection Ascorts to locate welds in the plant Assistance to assemble documentation (radiographs)

Electrical power and extension cords for portable test equipment Working space .for one or two persons to examine radiography records Viewer to examine radiographs.

Use of lunchroom and sanitary facilities Use of Xerox machine as back-up Calibrated severn gauge To be furnished at the Diablo Canyon Site by the NRC:

Assistance as required by the Senior Resident Inspector Telephones in the NRC trailer Xeror machine for copying

4 .

, o e

To be furnished by the contractor:

Certified level II or 111 liquid penetrant and qualified radiograph interpreter examiner to conduct visual and liquid penetrant

  • examinations and an examination of about 100 radiographs for adequacy Two copies of certifications and qualifications of all contractor personnel, and documentation verifying certification and qualification of liquid p-netrant cleaner, penetrant and developer used shall be given to the NRC contact upon arrival at the Daablo Canyon Site, Measurements performed shall be in accordance with the latest editions of the ASME, code. 'Two copies of all data sheets will be furnished to the NRC contact at the conclusion of the work.

A letter report including a description of the work performed, the data obtained or examined, and evaluation of the adequacy of licensee's documentation *shall be prepared and delivered to the NRC Region V office by November 25, 1983. An exit meeting will be held with the NRC contact at the conclusion of the work to discuss the scope and findings.

G I

k t #

?

l I'

's a rd as ele r, a c. Exhibit 2 to Report No. . PAR (DCNP)-NDE-2 C O N S U LTI N G tNolNEIRs eLa caove, wiscoNs N Field Welds chosen for Radiograph and Reader Sheet Review ISO Field ISO Field ISO Field ISO

  • Field Drawing Weld Drawing Weld Drawing Weld ' Drawing Weld 1-7-21 100 1-7-6 31A 1-7-1 215 1-07-22 106 1-7-21 101 1-7-6 32 1-10-19 144 1-07-22 107 1-7-21 105 1-7-6 33 1-9-34 216 1-07-22 108 1-7-18 80 1-17-6 282 1-7-24 124 1-07-22 109 1-7-18 81' 1-7-6 280 1-7-24 126 1-10-9 83 NI 1-7-14 62 1-7-6 283 1-9-42 249 1-07-22 110 1-7-14 63 1-7-9 294 1-9-42 245 1-07-22 111 1-7-14 64 1-7-9 284 1-9-42 250 1-07-22 112 1-7-10 46 1-7-9 182 1-7-8 242 1-07-22 113 1-7-2 7 1-7-9 43 1-7-8 40 1-09-9 75 1-7-5 22 1-7-9 42A 1-12-8 100 1-09-9 73 1-7-5 23 1-7-9 42 1-12-8 103 1-09-9 72 1-7-5 24 1-8-323 1084 1-12-8 99 l-09-9 74 1-7.-5 25 1-7-1 1 1-12-8 104 1-09-9 71 1-7-5 26 1-7-1 2 1-7-23 117 1-09-9 77 1-7-5 27 1-7-1 3 1-09-41 242 1-09-9 78 1-7-5 295 1-7-1 4 1-09-41 243 1-07-17 76 501014 362 1-7-1 201 1-09-41 244 1-07-17 77 1-8-321 1069 1-7-1 203 1-09-17 130 1-07-17 78 1-7-28 186 1-7-1 204 _1-09-17 131 1-07-17 79 l-7-28 187 1-7-1 206 1-09-17 132 1-07-16 72 1-4-153 1428 1-7-1 207 1-09-38 230 1-07-16 73 1-4-153 1060 1-7-1 209 1-09-28 231 1-07-16 74 500136 251 1-7-1 211 1-09-38 232 1-07-16 75 1-7-6 28 1-7-1 213 1-09-38 233 1-07-19 82 1-07-19 83 1-07-19 84
1. o Raport No. PAR (DCNP)-NDE-2
s. $f&7 k#/DC.4%CF S 0 Alt 9/// $wr fk/#Atrone,) //~/4- 2.3 A2/* /s7f smx.47ue .*' 7FY7, 69d. tzfra 3-17-E2

/J O .c m drse f& .ccwam sr e.e/rr faows

/-8 -222 /// 7 > 757o <' /C %

/-8 .22 8 //25 P 7 5 "fo < /C VG

/-8-328 /s 7</ > 7 5 7o < / o Yo

/-8-322 //:72 7 75%.4 /C &

/ 2.28 /// 9 > 7 SN k /0 Yo

/ 32E ///5 4 7 7 S Yo 4

/0 %

/- S~ 32 8 ///8 7 75%< /0 %

/ 320 /04,0 7 757o < /9 %

/ 320 /OS9 7 7 5 "Yo < /0 Ya

/ 3-7 0 so g 7 7 75 % < fo %

/- 8 .20 292 # 75 % < /C Yo

/ - 8 .20 .2934 ' 75 % '

/04

/-2 20 .:793 8 > '7 6 % < /0 Y0

/- F 20- /50 */07o<'/5 7o

/ 20 /V9 .7 /0 7o .<' /SP

/ - 3 .20 /Y8 > / 0 % 4 / E Yo

/ 20 /V7 .7 / 0 70 4' /5'%

/ 20 /VS > 7SN 4 / 0 70

/- S .20 /Yd;, > 757o 4 /07o

/ 2

/f, 7 757o < /0 %

/ 2 20 > 7 5 /6 < /o %

/-2-2 2/ > 75% < /O %

/- S~& 22 7 XSk < /() Vo

./- S .2 .2V > 75% < /0 k

/- E *? /9 > 7SZ < /0 Ye

// cts

,, . Exhibit 4 to Raport No. t>,. .4ue-2

  • WISCONSIN INDUSTRIAL TESTING. INC. REPOZT OF arso e. mm so . s, o. wis NONDESTRUCTIVE m eni.,. . n. wi sia.m .aoos v.i i. T.u.m m m ans moios EXAMINATION F AA ft.oen stat on C13 29 (UT MT, PT ET)

Customer Location Cont act No Date A /* / d . .,C%0 Moraes <WM H-/4 - R.5' PO No lleen Destripts ni PI,wi ue Drawuq Nie Contrut Report No pari u J~ ew .f}ne /TD. _.2- /y- 3 / p o

..r... <e c ono. .,n

, sgieni .

R"t a /#- No, //c _ p2_ , ,, L . Cl. ,i .

M,i T ype et e.am.n.ii.on L ......u..i . .n t.una u a lA...vtu e si.sn.t,,a Nt c, . . , i. .. . .. d/ssceo _

ET O UT O MT O Type of Worn PT a j i Otal 8, ewith t ..peurmal g g g ppg g g. g M .let s.si 4 . pe. M. ate t s.el II.n him.w M..l.i d l esop New E Repast O Rn

,g n } sg _ y, ,,,.y y gy ET Equipment ervem le i o. . k fl . , s oi.,nc i s. .a ,,ps .n  % . . .a ., i y i c.r, 6

UT Equipment Transduce, f est Osm k T et tenuane Dr. ..pta,n  ?.e'e..t ..t v i m et MT Equipment Dry O Visible O AC O DC O ^'"#'*' P r. .o ? .p.

. .o Wet O Fluor O Rectifeed O Heaa 0 C oil O ,

M Equepnient 1 Visible .N ' Pent tuent fiweil f unc . ,Ec~' *T'" I t i. . 4. no . et l u..e / ***/'* '

gggfppff, f g j.gr g f)uorescent O Water O Post O Solvent A l Dry O Wet O Noriaqueous A Defect Coce C = Crack P : Porosity LF 2 Lack of Fusion Li - Linear indication S Slag LA Larmnation PART NO. ACC. R EJ. D T REMARKS O T I PART NO. !ACC. REJ. REMARKS l

\.

S U- N'O .

Rt/- ///- __ _ _ $ & '""

l w.fovc.

RD'- //2 - - - -

-- ~ ~- -- - - - - - - - -- - .- .- - - - . - .-.. -

_ _ _ - $?lA .

kerrf,MT..* __ JY.,f. _ 7/r/~c.. . eM_._ _ _ . *

. . . . $$//AWfd

  • f50 ,5~ . - . . . . . .

Comments Nurnber of items Number of items jp' p y y g , fg g y Qs fpff Accepted Retected Teche Cert Levte Date Customer Date

! AM/ AM S*Y~5S Asst Technicsan Cert Level Date Autnoritet, insper. tor Date.

me s, .-s, . s s, . c m. c .~ . __.

Lustomeg we trw. y-a . gese, ce ag.g.eope le gegt .ad to loCat. 08 ff* use d d orthf t th

. ,o .

ut (.# WW8

.._..._,......n....,,..,.m.m.-,.._~...

k.a he W 4m. l.

.s tert.%4aL .allt. 8.je et e n e are.h*81y s t..Freuh4Qf m A*twed f>y me aalie.1% TheCuatethw . .d it I .hers cual..et hatW..sfi . 0t be th kt b.id h ar 8a.* **'P'O'P'Ji-'* 8d nee.m, cmea m w., one, u , ri u .a i, a coneo. .nc . um.odwum hsw d.w. 4#e w.p.w y t a eh .seti nmq 8auns 6. .sh dnet.r hr h. <b h, s ns ..h..t . h-M rw fn .n m., co,.n

m. .p.ca.c.n..n. o ,.,a . ,6 .aw. .a . u onsen um

. . .aw-,p.. .on oe me . .n. ocu.< a eu vi m., scu. .no ..w .g . m. .e.<*.* mr i =..i mv . .'

nac io scoa.uu.a ian a3aenaia gos.ne or .=,_v as meconomonoe er mc . .inem: in.kanes,os ca..s..c m. o. , e  :.n.n c... ive n .. , n.n .i, n.ss se na, n.mne onesa .a.vv.....m n - hasi a.m...-.

.n,6aas conwanoe i aa.ae n wee.c=> ne. .an empio, u as so on, a.= .a.o.ci.a naciuo ag .a, FORM a S-11