DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld
| ML20092K816 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/19/1995 |
| From: | Fujimoto W PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| DCL-95-204, NUDOCS 9509260156 | |
| Download: ML20092K816 (2) | |
Text
n c
i Pacific Gas and Electric Company Ciado Canyon Power Piant Warren H. Fwmato PO Box 56 Wce Prescent-Diablo Canyon Ma Beacn. CA 93424
%crations anc Plant Maaager 5:f/545 6000 September 19,1995 PG&E Letter Nc. DCL-95-204 U.S. Nuclear Regulatory Commission ATTN: Documa nt Control Desk Washington, D.C. 20555 Docket No. 50 275, OL-DPR-80 Docket No. 50 3.?3, OL-DPR-82 Diablo Canyon Units 1 and 2 Reauest for Exemption to 10 CFR 73 Gentlemen:
PG&E letter DCL 95-.092, dated May 5,1995, requested an exemption to 10 CFR 73.55td'.(b) and provided a draft of proposed changes to the Diablo Canyon Power >!aqt's Physical Security Plan (PSP). PG&E letter DCL 95-161, dated July 28.1995, contained a revision to the draft submitted in May. tc *iis letter proposes revisions to clarify issues which were identified on 3e stember 15 and 18,1995, during conversations with the NRC staff. Enclosure 1 includes a description of the changes made as a result of the telephone conversations. to this letter proposes a revision to clarify issues, which were identified on September 6 and 7,1995, during telephone conversations with the NRC staff. Enc.osure 1 includes a description of the changes made as a result of the telephone conversation. to this I?tter are the changes made to the proposed draft submitted PG&E's lette-t1C1.95-161, July 28,1995. is he draft of the proposed changes to the PSP incorporating the changes identified in Enclosure 1,2 and 3. Changes are indicated by side bars in the left margin. Additions are indicated by bold type and deletions are indicated by sir 4e through markings.
SECURITY SAFEGUARDS INFORMATION
^ *c' -
b When Separated From Enclosures g
9509260156 950919 Hantile This Document As Decontrolled h
F j
if/..
PDR ADOCK 05000275
/
i F
,1
- g....
o
/
O Document Control Desk September 19,1995 Page 2
. is a sketch of the proposed Security Building layout, once hand geometry is ir place. It is not to scale.
Subsequent tc approval of the requested exemption described in the Enclosure 2, PG&E will submit a fo'rmai request for changes to the PSP in accordance with 10 CFR 50.54(p).
The hand geometry system is scheduled for imp!ementation on or about September 22,1995. PG&E requests approval of this exemption prior to September 22,1995.
Should you require further information or clarification, please contact Ron Todaro, Security Director, at (805) 545-4309.
Sincerely, Warren H. Fujimoto cc:
Ronald G. Todaro CCC/RMS Enclosures i
e SECURITY SAFEGUARDS INFORMATION '
l When Separated From Enclosures.
Handle This Document As Decontrolled
--.