ML20234D795
ML20234D795 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/14/1987 |
From: | Graber L NUS CORP. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
References | |
FOIA-87-840 CD-LIS-87-849, NUDOCS 8801070208 | |
Download: ML20234D795 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant ML16342A9111999-09-29029 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & Pse&G Responses for Diablo Canyon NPP ,990701 & 990923.Informs That Staff Reviewed Responses & Concluded That All Requested Info Provided.Considers GL 98-01 Closed for Diablo Canyon IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML16342B9901999-09-20020 September 1999 Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML16342A9011999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Diablo Canyon & Did Not Identify Any Areas in Which Performance Warranted Add Insp Effort Beyond Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 7 Months ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML16342C1331999-08-11011 August 1999 Ack Receipt of Transmitting Rev 3,change 18 to Diablo Canyon Nuclear Power Plant Emergency Plan ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML16342A8751999-07-30030 July 1999 Forwards Insp Repts 50-275/99-10 & 50-323/99-10 on 990529-0710.Four Violations Being Treated as Noncited Violations ML16342A8691999-07-29029 July 1999 Forwards Insp Repts 50-275/99-08 & 50-323/99-08 on 990628-0702.No Violations Noted.Radiological Environ & Meterological Monitoring Sys Were Effectively Implemented ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8661999-07-26026 July 1999 Advises That 981021 Application for Amends to Licenses DPR-80 & DPR-82 to Modify TS Re Voltage & Time Delay Setpoints for First Level Undervoltage Relays & Second Level Undervoltage Relays Being Treated as Withdrawn ML16342A8541999-07-15015 July 1999 Submits Summary of 990701 Meeting with Util in Region IV Ofc to Discuss Performance of Different Groups During Refueling Outage 1R9 & Plans for Continued Performance Improvement ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8381999-06-21021 June 1999 Forwards Corrected Pages (Page 2 of Transmittal Ltr,Pages 3, 7,8,11,12,21,25,28 & 29 of Safety Evaluation & Pages 2,3 & 4 of Table 1 Attached to SER) Re Util 981015 Second 10-year Interval Inservice Insp Program Plan DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A8021999-06-0303 June 1999 Ack Receipt of Ltr in Response to Request for Addl Info Contained in Ltr to Ruger ,which Forwarded NRC Insp Repts 50-275/98-201 & 50-323/98-201. Actions Described in Ltr Responsive to NRR Concerns ML13319B1431999-06-0202 June 1999 Responds to Comment Made by P Gunter at 990413 Reactor Decommissioning Public Meeting Re New Info Coming Out of Kobe & Northridge Earthquakes by Providing Info on Seismic Design,Procedures & Analyses Used by NRC & NPPs ML16342A7981999-05-27027 May 1999 Forwards Several Documents That Describe Recent NRC Policy Development in Oversight of Safety Cultures as Result of Millstone Experience Per Request ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342A7861999-05-14014 May 1999 Submits Summary of 990423 Meeting in San Luis Obispo,Ca to Discuss Results of Ppr,Completed on 990211.List of Attendees & NRC Presentation Slides Encl ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16340C2241999-05-0303 May 1999 Forwards Insp Repts 50-275/99-02 & 50-323/99-02 on 990405-09.No Violations Noted.Insp Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML16342A7681999-04-15015 April 1999 Ack Receipt of 990326 Response to NRC 990216 Request for Written Response to Explain Why Greater than 5 Percent Post Exam Changes to Test Questions Were Needed & What Actions Taken to Prevent Recurrence.Finds Reply Acceptable ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342C1101999-04-0505 April 1999 Forwards Copy of FEMA Final Rept for 981204 Diablo Canyon Power Plant Medical Drill.Rept Indicates That There Were No Deficiencies & Two Areas Requiring C/A Identified During Drill DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342C1091999-03-30030 March 1999 Forwards Plant Issues Matrix That Was Inadvertently Omitted from PPR for Plant Facility.Encl 1 to PPR Requested to Be Replaced ML16342A7401999-03-25025 March 1999 Forwards Insp Repts 50-275/99-01 & 50-323/99-01 on 990215-26 at Diablo Canyon Npp.No Violations Noted.Purpose of Insp Was to Complete Evaluation of Welding & Welding Insp Program at Diablo Canyon NPP ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342C3241999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990211 for Period 980510-990125,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan Encl 1999-09-30 Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC MONTHYEARML20245D9851989-06-22022 June 1989
[Table view]Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20247P9411989-05-17017 May 1989 FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants ML20150D4301988-01-0707 January 1988 FOIA Request for Records Re 1975 NRC Seismic Design Audit of Facility ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20234D7951987-12-14014 December 1987 FOIA Request for Documents Re Encls to to Util Transmitting Suppl to Safety Evaluation & Environ Assessment ML20235Y1711987-07-0606 July 1987 FOIA Request for Documents Re Investigation Into Plant Seismic Design Error ML20235R9191987-07-0202 July 1987 FOIA Request for Statement of Work on Plant Project Verification & Contracts Awarded to BNL by NRC Through DOE for FY79 - FY85.Scope of Work Only,Not Financial Info, Requested ML20234B6211987-05-12012 May 1987 Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness ML20237J3401987-04-13013 April 1987 FOIA Request for Transcript of 830106 Meeting W/Individual Re Alleged Deficiencies in Plant Component Cooling Water Sys ML20205M4951987-02-20020 February 1987 FOIA Request That All Operational Readiness Ltrs for Diablo Canyon Be Placed in PDR ML20207T1001987-02-13013 February 1987 FOIA Request for Two Categories of Documents Re Diablo Canyon Nuclear Power Plant,Consisting of Transcripts of Closed Commission Briefings on 830422,840131 & 0702 & Secretary 831104 Limited Distribution Memo ML20211D6631987-02-12012 February 1987 Notifies of 830204 Meeting W/Util,Idvp,Nrc & BNL in San Francisco,Ca to Discuss Status of Containment Annulus Steelwork & Status of Auxiliary Bldg ML20211D7031987-02-12012 February 1987 Notifies of 830209 Meeting in San Francisco,Ca to Discuss Shake Table Tests of Electrical Equipment ML20211D7441987-02-12012 February 1987 Notifies of 830517 Meeting in San Francisco,Ca to Discuss Development of Piping Stress Intensification Factor ML20210M9071987-01-26026 January 1987 FOIA Request for Transcript of Commissioner 831017 Briefing Re Diablo Canyon Idvp ML20207T2211987-01-16016 January 1987 FOIA Request for Commissioner 811116 Briefing Transcript Re Diablo Canyon Seismic Design Error & NRC pre-congressional Testimony & Commissioner 811119 Briefing Transcript of NRC pre-congressional Testimony ML20207R6541987-01-0909 January 1987 FOIA Request for All Petitions Referred to Licensing Board by 740319 Memorandum & Order CLI-74-10 & All Licensing Board Orders,Directors Decisions or Further Commission Orders Responding to Such Petitions ML20215L6371986-12-11011 December 1986 Appeals Denial of FOIA Request for Documents from Chron & Reading Files of H Schierling from Sept 1981 to Present Re Plant ML20215N4931986-10-14014 October 1986 FOIA Request for All NRC Daily Highlight Memos for Plant from 810601-861001 ML20215D8981986-09-0505 September 1986 FOIA Request for Records Re NRC Evaluation of Damage,Repair & Design of Facility Breakwater Sys ML20212N6991986-07-28028 July 1986 FOIA Request for Tw Bishop 811028 Memo to Jl Crews,Nrc Insp Guidance for 1966-1981,D Kirsch 771220 Memo to G Spencer & Listed Insp Repts ML20211Q9331986-06-24024 June 1986 FOIA Request for SALP Input for Cycles Jul 1979 - Dec 1980, Jul 1981 - Dec 1982 & Jan 1983 - June 1984 & Inputs from NRR & SALP Inputs Prepared Prior to Jul 1979 - Dec 1980 Cycle or for Dec 1980 - Jul 1981 ML20202D0531986-06-0202 June 1986 FOIA Request for Records of ACRS Jan 1973 - Dec 1985 Meetings Re Geology,Seismology & Seismic Design of Diablo Canyon ML20212K9331986-05-22022 May 1986 FOIA Request for Documents Re Meetings W/Usgs Between Jan 1973 - Dec 1985 Re Geology & Seismology ML20215M9941986-05-21021 May 1986 FOIA Request for Documents Re Eg Case 771201 Memo to Tj Mctiernan Concerning Chronology of Events Associated W/ Facility Fault Assessments ML20210K5541986-03-11011 March 1986 FOIA Request for Records from Caseload Forecast Review Panel Re Diablo Canyon from Jan 1979 - Dec 1981 ML20210A6801986-03-0404 March 1986 FOIA Request for Documents from H Schierling Files from 810901-831231 Re Diablo Canyon Nuclear Power Plant,Units 1 & 2 ML20210P4871986-03-0404 March 1986 FOIA Request for Records from D Eisenhut Chronological & Reading Files Re Diablo Canyon Units 1 & 2 During Sept 1981 - Dec 1983 ML20209E1221986-03-0404 March 1986 FOIA Request for Documents Re Plant from Files of H Schierling from Jan 1984 to Present ML20210P7931986-03-0404 March 1986 FOIA Request for facility-related Documents from 840101 to Present from Files of D Eisenhut ML20199G6651986-03-0404 March 1986 FOIA Request for Documents from Chronological & Reading Files of J Knight During 810901-831231 Re Plant ML20198E3211986-03-0404 March 1986 FOIA Request for Documents Re Facility from Chronological & Reading Files of HR Denton from 840101 to Present ML20206H6161986-03-0404 March 1986 FOIA Request for All Records from H Schierling Chronological Files & Reading Files for Sept 1981 - Dec 1983 Re Facilities ML20210Q0131985-10-10010 October 1985 FOIA Request for Previously Withheld Portions of 820121,27 & 0205 Commission Meeting Transcripts Re Diablo Canyon Plant ML20134L5011985-06-19019 June 1985 FOIA Request for Operator Exam Results Summary Sheets for Listed Nuclear Plants ML20133C5961985-05-23023 May 1985 FOIA Request for Section 55.25 Exam Summary Sheets Prepared by Operator Licensing Branch for Operator Candidates & Monthly & Quarterly Repts on Senior Operator Performance on Exams ML16341C3201985-04-26026 April 1985 Comments on ACRS Subcommittee on Extreme External Phenomena 850321-22 Meetings.Acrs Should Monitor Seismic Design Margins Program Closely to Ensure Results & Program Remain on Schedule for 3-yr Completion ML20215A2341984-08-14014 August 1984 Informs That H Schierling Gave Orders to Destroy Restricted Documents DKM-7-84 on 840802 ML20210E7331984-04-19019 April 1984 Submits Results of 840403-05 Insp of Rectangular Tube Steel W/Perimeter Less than 14 Inches Used for Safety Class I Sys, in Response to P Morrill 840402 Request.Data Re Tube Steel Measurements Encl ML20090A8731984-04-0404 April 1984 FOIA Request for V Gilinsky 830908 & 28 Ltrs to ACRS Re Tau Effect at Diablo Canyon to Be Placed in PDR ML20215G6471984-03-20020 March 1984 Forwards Rept PAR(DCNP)-NDE-3, Followup of Alleged Deficiencies in QA Program at Diablo Canyon Nuclear Plant, Per 840320 Telcon ML20112J3491984-02-0202 February 1984 Forwards Review Detailing Results of 831219 & 20 Audits Performed on Environ Qualification Program Documentation at Facility.Adequate Technical Basis for Claimed Qualification Indicated ML20153G9361984-01-31031 January 1984 Forwards Comments Addressed to Chairman Palladino ML20236U1011983-12-0505 December 1983 Forwards Attachment 1 Tabulating Info by Category W/ Exception of Concrete Expansion Re Insp Status Rept & Attachment 2 Illustrating Info Stored in Data File for Project.Related Documentation Also Encl ML20215H9331983-12-0505 December 1983 Provides Info Re Insp Status of 1982 Mods to Idvp & Data Re Raceway Bolts,Per D Kirsh 831130 Request ML20210E8021983-12-0202 December 1983 Discusses Welding Procedures & Practices Re Use of Unqualified Welders & Welding Procedures That Affect Safety. Response Requested.Supporting Documentation Encl ML20210E6161983-11-23023 November 1983 Forwards Rept PAR(DCNP)-NDE-2 & Project Quality Plan Re Technical Assistance in Support of NDE Work at Plant.Table of Field Welds Chosen for Radiograph & Reader Sheet Review Also Encl ML20080K3981983-09-20020 September 1983 Forwards Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Corrective Action,Turbine Bldg, Interim Technical Rept 56 ML17083B2151983-09-19019 September 1983 Forwards Idvp Verification of Diablo Canyon Unit 1 Activities - Rupture Restraints, Interim Technical Rept 65, Rev 0 ML20211E4361983-08-25025 August 1983 Forwards Revs 0 to Interim Technical Repts,Including ITR-57, Review of Diablo Canyon Plant Activities Fuel Handling Bldg, ITR-58, Verification of Diablo Canyon Plant Activities Intake Structure & ITR-60.W/o Encls 1989-06-22 Category:INCOMING CORRESPONDENCE MONTHYEARML18107A7011999-06-25025 June 1999
[Table view]Requests Rev of NRC Records to Reflect Change of PG&E Address DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-116, Forwards Response to NRC 980707 & 09 RAIs Re LAR to Convert Current TS Sections 1.0,2.0 & 3.0 to Improved Std TS1998-08-28028 August 1998 Forwards Response to NRC 980707 & 09 RAIs Re LAR to Convert Current TS Sections 1.0,2.0 & 3.0 to Improved Std TS DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments DCL-97-033, Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.901997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 DCL-96-214, Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld1997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld ML20100L4631996-02-23023 February 1996 Forwards Response to NRC Enforcement Action 95-279 Re Violations Noted in Insp Repts 50-275/95-17 & 50-323/95-17 on 951021-1208.Corrective Actions:Directive Was Issued to Plan 2R7 W/Six Day Work Schedule DCL-96-036, Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr1996-02-20020 February 1996 Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr ML20097E9341996-01-25025 January 1996 Forwards Public Version of EPIP Update for Diablo Canyon Power Plant,Units 1 & 2 DCL-95-272, Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training1995-12-11011 December 1995 Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training DCL-95-264, Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5))1995-12-0606 December 1995 Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5)) DCL-95-262, Forwards Publicly Available Version of Update to Corporate Erpips1995-12-0101 December 1995 Forwards Publicly Available Version of Update to Corporate Erpips ML20094M6001995-11-21021 November 1995 Forwards Final Rept of Investigation & Analysis of Event 29257 Re Substandard Fastner Processed & Sold by Cardinal Industrial Products,Lp,So That Customers Can Evaluate Situation in Light of 10CFR21.21(a)(1)(ii) & (b)(1) DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld1995-09-19019 September 1995 Forwards Proposed Changes to Physical Security Plan.Encl Withheld DCL-95-199, Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan1995-09-14014 September 1995 Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan ML20087A0471995-07-28028 July 1995 Forwards Security Safeguards Info in Form of Change to Proposed Draft Plant Security Program.Encl Withheld DCL-95-153, Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo1995-07-27027 July 1995 Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo DCL-95-134, Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d)1995-07-0505 July 1995 Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d) ML20086H5461995-06-29029 June 1995 Forwards Final Exercise Rept for 931020,full Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response plans,site-specific to Plant.No Deficiencies Noted DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld1995-02-28028 February 1995 Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld DCL-95-039, Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo1995-02-23023 February 1995 Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo ML18101A5671995-02-17017 February 1995 Informs of Improper Presentation of Jet Expansion Model in Bechtel Technical rept,BN-TOP-2,Rev 2 Design for Pipe Break Effects Issued May 1974.NRC May Need to Consider Evaluating Consequences of Potential Misapplication of Expansion Model 1999-06-25 |
Text
ANUS CORPORATION
"[sYa[aYa"2$o7$$^2 c
ess 313 796 2264 CD-LIS-87 849 December 14, 1987 FRe.EDOM OF INFORMADOM Director Division of Rules and Records ACT REQUEST U.S. N.R.C.
f0.TA ~$l'Ehb Washington, D.C.
20555 j
Dear Sir:
I This is a Freedom of Information Act request for the following documents to be placed in the Public Document Room:
1.
Enclosures to letter dated 10/15/87 to Pacific Gas & Electric (Diablo Canyon) transmitting a supplement to the safety evaluation I
l and environmental assessment (Accession No. 8710220412).
1 If clarification is needed, please call me at (813) 796-2264.
Thank you for your assistance.
Sincerely, l
L'le Graber Licensing Engineer Licensing Information Service LG/mw i
l I
I 8801070200 871214 PDR FOIA GR ABER 87-840 PDR l
1
- _ _ _ _ _ _ _ _ _ _ _