BISCO QUALITY CONTROL Q,
PROCEDURE COVER SHEET
- 256-3 Procedure No.
Dated Revision No.
QCP-507 Dec. 10, 1979 TITLE: BISCO FLEXIBLE BOOT INSPECTION
SUBJECT:
METHOD FOR INSPECTING BISCO FLEXIBLE PENETRATION SEALS SCOPE OF CURRENT REVISION:
8 This document contains information proprietary to Brand Industrial Services, Inc.,
and shall be surrendered upon request from Brand Industrial Services, Inc. The contents are not to be used for other than the expressed purpose for which loaned without written permission of Brand Industrial Services, Inc.
BISCO APPROVAL SIGN ATUR E S OriginalAue Rev.I Rev. 2 Rev. 3 Rev. 4 Rev. 5 Rev. 6 or J. Barta f
O. C. Approval li.
J.
Barta
(. _
Management C/g/[.
Approval C. w. Brown 8603280187 860123 D
INE84 744 PDR 090 l Of 6
m bisc0 QUALITY CONTROL PROCEDURE TITLE:
BISCO FLEXIBLE-BOOT INSPECTION QCP-507 1.0 PURPOSE 1.1 To establish the criteria and methods for the inspec-tion of BISCO Flexible Penetration Seals.
2.0 SCOPE 2.1 To establish the acceptance criteria and inspection documentation methods for all types and configurations of BISCO Flexible Penetration Seals (Boots).
3.0 APPLICABLE DOCUMENTS T
3.1 10CFR50, Appendix B, " Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing".
3.2 ANSI-N45.2, " Quality Assurance Program Requirements for Nuclear Power Plants".
3.3 BISCO Quality Assurance Manual
/
3.4 BISCO Production Procedures 4.0 BOOT TYPE DESIGNATION 4.1 The type of installation is determined from customer approved documentation and specification.
(
Date 12-10-79 Rev. O Page of 2
6
~
~'
bis C O QUALITY CONTROL PROCEDURE c
D TITLE:
BISCO FLEXIBLE BOOT INSPECTION QCP-so7 4.21 The BISCO Quality Control Department shall record the installation type according to the following schedule:
Configuration Coding Description I
Boot Seal between a pipe and sleeve extended from concrete.
II Boot Seal between an insulated pipe and sleeve extended from concrete.
III Boot Seal between a pipe and sleeve flush with concrete.
IV Boot Seal between a pipe and Bolted-on-Flange.
V Boot Seal between an insulated pipe and sleeve flush with con-crete.
VI Boot Seal between an insulated pipe and Bolted-on-Flange.
S Single Penetration M
Multiple Penetration Date 12-10 79 Rev. o Page 3 of 6 L
r l'
bisco QUALITY CONTROL PROCEDURE TITLE:
BISCO FLEXIBLE-BOOT INSPECTION Q CP 507 Coding Description F
Radiation Barrier P
Pressure ~ Seal A
Air Seal J'
~~
Example:
Boot Type IS-P s
A. Boot Seal between a pipe and sleeve ex-tended from the concrete, a single penetrating item, and intended as a pressure seal.
5.0 PROCEDURE 5.1 Pre-installation 5.1.1 All inspections shall be documented on Form FB-6 and in conjunction with the internal work release (INR) and 3atest approved re-vision of the penetration drawing.
5.1.2 The Quality Control Department shall inspect and accept the pre-installation requirements as dictated by customer specifications and BISCO standard procedures prior to production progressing with the application of the BISCO Flexible Boot.
Date 12-10 79 Rev.0 Page 4 of 6
D BISCO
~~
QUALITY CONTROL PROCEDURE
.7
~
TITLE:
BISCO FLEXIBLE (BOOT INSPECTION Q CP 507 5.1.3 All boot mounting surfaces shall be free of sharp edges or protruding surfaces which could damage the boot fabric.
5.1.4 Surface mounted flanges shall be verified as having an adequate seal between the flange and mounting surface.
5.1.5 All internal barriers / seals shall be inspected in accordance with the applicable customer
(']
specifications and BISCO standard procedures.
v 4
5.2 Final Inspection 5.2.1 All inspection shall be documented on Form FB-6 in conjunction with the internal work release (Ih'R) and latest approved revision of the penetration drawing.
5.2.2 The final inspection and acceptance of a BISCO Boot Seal shall be in accordance with the applicable customer specification and BISCO standard procedures.
5.2.3 The areas of adhesive bonding shall be in-
~
spected for adequate adhesion and workmanship.
For example, there should be no discontinuities (f
such as "fishmouths existing along all bonded edges and seams.
Date 12-10-79 Rev. O Page of S
6
4 bisc0 QUALITY CONTROL PROCEDURE TITLE:
BISCO FLEXIBLE BOOT INSPECTION Q C P 507 5.2.4 Each Boot Seal incorporating an internal barrier within the boot fabric area and in-stalled after the installation of the BISCO boot, shall be verified in accordance with the appropriate' BISCO installation procedure and/or customer specification.
END OF TEXT
\\
i
(
Date 12-10-79 Rev. O Page 6
6 of
FB-6 Rev.O biSC FLEXIBLE BOOT PENETRATION SEALS Profeet Nome Bisco. Job No.
Troce IWR Boot Pre - Instoll "I
Date No.
No.
Type inspect, ion Insp.
Date Insp.
insp ect. ion V
CODING:
See OCP-507 for inspection details.
J. Acceptable
\\.
o-Not Acceptable
.