Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2
ML18150A117
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 04/14/1987
From: Roberts E
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML18150A118 List:
References
CON-FIN-D-6001, CON-FIN-D-6002 EWR-83-87, GL-83-28, NUDOCS 8706050297
Download: ML18150A117 (1)


Text

.

.-.}.......

{.~

INEj, Idaho Nations/ EnginBflring Laboratory April 14, 1987 Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, 11 CONFORMANCE TO ITEM 2.1 (PART 2) OF GENERIC LETTER 83-28, REACTOR TRIP SYSTEM VENDOR INTERFACE: NORTH ANNA-1 AND -2, SURRY-1 AND -2, 11 EGG-NTA-7625, APRIL 1987 (FINS D6001 AND 06002) -

EWR-83-87 Ref:

NRC Form 189, 11 Evaluation of Conformance to Generic Letter 83-28 For ORs (Project 2f 1 (D6001);

11Evaluation of Conformance to Generic Letter 83-28 For OLs (Project 3) 11 (D6002)

Dear Mr. Carrington:

I*

Transmitted herewith is the above subject report.

/(

The report documents INEL 1s evaluation of the licensee/applicant actions in response to NRC Generic Letter 83-28, Item 2.1 (Part 2), Reactor Trip System Vendor Interface.

Based on the licensee/applicant submittals, we conclude that the plants reviewed conform to the generic letter on this*

item.

FGF:gp

Enclosure:

As Stated cc:

G. L~ Jones, DOE-ID D. Lasher, NRR-PAEI F. Rosa, NRC-DPWR-A

~~~

E.W. Roberts, Manager NRC Headquarters Support J. 0. Zane, EG&G Idaho, Inc. (w/o Encl.)