ML20214R062
| ML20214R062 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, Duane Arnold, 05000000 |
| Issue date: | 04/17/1987 |
| From: | Roberts E EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY |
| To: | Carrington M Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20214R064 | List: |
| References | |
| CON-FIN-D-6001, CON-FIN-D-6002 EWR-85-87, GL-83-28, NUDOCS 8706050326 | |
| Download: ML20214R062 (1) | |
Text
.
- INEh,
- ~
Moho Nedonal Engh,eook,g Labon, tory April 17. 1987 Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO ITEM 2.1 (PART 2) 0F GENERIC LETTER 83-28, REACTOR TRIP SYSTEM VENDOR INTERFACE: ARNOLD, BRUNSWICK-1 AND -2," EGG-NTA-7613, APRIL 1987 (FINS D6001 AND D6002) - EWR-85-87 Ref:
NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For ors (Project 2)" (D6001); " Evaluation of Conformance to Generic Letter 83-28 For OLs (Project 3)" (D6002)
Dear Mr. Carrington:
Transmitted herewith is the above subject report.
The report documents INEL's evaluation of the licensee / applicant actions in response to NRC Generic Letter 83-28, Item 2.1 (Part 2), Reactor Trip System Vendor Interface.
Based on the licensee / applicant submittals, we conclude that the plants reviewed conform to the generic letter on this item.
Very truly g g
o 9
E. W. Roberts, Manager NRC Headquarters Support FGF:gp
Enclosure:
As Stated cc:
G. L. Jones, DOE-ID D. Lasher, NRR-PAEI F. Rosa, NRC-0PWR-A J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)
l l
4 EGRGm
.sn 11428 RockvlMe pike suite tro RockvlHe, MD 20052 0706050326 070417 PDR ADOCK 05000324 P
- _._ __--.